# Europakommissionens beslut den 7 april 1994 i målet OCHSENREITER mot Österrike (nr 16036/90)

- Rubrik i HUDOC: OCHSENREITER v. AUSTRIA
- Slag: Europakommissionens beslut · språk: engelska · datum: 1994-04-07
- Ansökningsnummer: 16036/90
- ECLI: ECLI:CE:ECHR:1994:0407DEC001603690
- Artiklar (HUDOC): 6, 6-1
- Slutsats (HUDOC): Partly admissible;Partly inadmissible
- Källa: Europadomstolen (HUDOC), © ECHR-CEDH: https://hudoc.echr.coe.int/eng?i=001-1796
- Ratio Lex: https://ratiolex.se/internationell-ratt/europadomstolen/001-1796/

Elektronisk version. Den undertecknade texten i domstolens arkiv är den autentiska (art. 44.3 EKMR).

## AS TO THE ADMISSIBILITY OF

Application No. 16036/90  
by Wolfgang OCHSENREITER  
against Austria

The European Commission of Human Rights sitting in private  
on 7 April 1994, the following members being present:

MM.  S. TRECHSEL, President  
H. DANELIUS  
G. JÖRUNDSSON  
J.-C. SOYER  
H.G. SCHERMERS  
Mrs. G.H. THUNE  
MM.  F. MARTINEZ  
L. LOUCAIDES  
J.-C. GEUS  
M.A. NOWICKI  
I. CABRAL BARRETO  
J. MUCHA  
D. SVÁBY

Mr.  K. ROGGE, Secretary to the Chamber

Having regard to Article 25 of the Convention for the  
Protection of Human Rights and Fundamental Freedoms;

Having regard to the application introduced on 5 January  
1990 by Wolfgang Ochsenreiter against Austria and registered on  
22 January 1990 under file No. 16036/90;

Having regard to the report provided for in Rule 47 of the  
Rules of Procedure of the Commission;

Having regard to the observations submitted by the  
respondent Government on 26 March 1992 and the observations in  
reply submitted by the applicant on 21 July 1993;

Having deliberated;

Decides as follows:

## THE FACTS

The facts of the case, as submitted by the parties, may be  
summarised as follows.

The applicant, an Austrian citizen residing in Fursach,  
Austria, is the owner of real estate which had previously been  
used as a clay pit.  Before the Commission he is represented by  
Mr. W.L. Weh, a lawyer practising in Bregenz.

A.   Particular circumstances of the case

In 1981 the applicant applied to the Bregenz District  
Authority (Bezirkshauptmannschaft) for permission under the  
Landscape Protection Act (Landschaftsschutzgesetz) to fill up an  
abandoned clay pit with waste material, mainly from road  
construction projects, as he intended to develop subsequently the  
land for industrial sites.  In 1983 he withdrew his request.  
However, as he had in the meantime already filled up parts of the  
clay pit, the District Authority insisted that he applies for  
permission.  The applicant then renewed his request.

By decision of 13 June 1984 the District Authority granted  
him a permit for filling up parts of the pit, while refusing  
permission for other parts.  The permission related in particular  
to those parts of the pit which the applicant had already filled  
up.  The District Authority considered that the applicant's land  
was wetland (Feuchtgebiet) within the meaning of Section 5 of the  
Landscape Protection Act and therefore merited protection.

On 2 July 1984 the applicant appealed to the Vorarlberg  
Regional Government (Landesregierung).  He submitted that he did  
not need a permit for filling up his land as it was no wetland  
within the meaning of Section 5 of the Landscape Protection Act  
and, in any event, his project did not run counter to the  
interests of landscape protection.

On 30 October 1985 the applicant's lawyer agreed with the  
Regional Government that further enquiries on the situation of  
the flora and fauna on the applicant's land during the vegetation  
period in spring 1986 were necessary.  For that purpose an oral  
hearing on the applicant's land in the time between 15 and 30  
April 1986 was scheduled.

On 21 April 1986 this oral hearing took place.

On 16 May 1986 the Regional Government dismissed the  
applicant's appeal of 2 July 1984.  It found that even if the  
applicant's real estate did not qualify as wetland he would,  
according to Section 3 para. 1 (l) of the Landscape Protection  
Act, need a permit for dumping waste on an area larger than 100  
m².

On 10 November 1986 the Administrative Court (Verwaltungs-  
gerichtshof), upon the applicant's further appeal,  quashed the  
decision of the Regional Government on account of procedural  
mistakes.

Proceedings were then resumed before the Regional  
Government.  On 29 December 1986 an official expert for landscape  
protection, employed by the Regional Government, presented a  
written expert opinion, which was served on the applicant on 14  
January 1987.

On 28 January 1987 the applicant requested an extension of  
the time-limit for commenting on the expert's opinion until 31  
March 1987 which was granted by the Regional Government on 4  
February 1987.

On 30 March 1987 the applicant submitted his comments.

On 13 May 1987 the Regional Government held an oral hearing  
in the presence of the expert, the mayor as representative of the  
municipality, the Deputy Landscape Protection Officer  
(Landschaftsschutzanwalt-Stellvertreter), the applicant and his  
counsel.

On 31 July 1987 the expert was again questioned by the  
authority, this time in the absence of the applicant's counsel.  
The expert's statements were served on the applicant on 4 August  
1987.

On 31 August 1987 the applicant's counsel objected in  
writing to the fact that the authority had heard the expert in  
his absence.

By decision of 14 September 1987 the Regional Government  
again dismissed the applicant's appeal.  This time the Regional  
Government, referring to Section 3 in connection with Section 10  
of the Landscape Protection Act, found that the waste dump  
envisaged by the applicant on an area of approximately 2000 m²  
was subject to a permit, which could not be granted because the  
project ran counter to the interests of landscape protection.

On 17 March 1988 the applicant lodged a complaint with the  
Constitutional Court (Verfassungsgerichtshof), which the latter  
rejected on 9 June 1988.  Upon the applicant's request the  
Constitutional Court referred the case to the Administrative  
Court on 26 September 1988.

On 30 October 1988 the applicant supplemented his complaint  
to the Administrative Court.  He did not ask for an oral hearing.

On 22 May 1989 the Administrative Court dismissed the  
applicant's complaint.  The Administrative Court held that the  
Regional Government had correctly assumed that the applicant's  
project to fill up his land with waste material required a permit  
under Section 3 para. 1 (l) of the Landscape Protection Act.  The  
Administrative Court considered further that the refusal of the  
permit was in accordance with Section 20 para. 1 of the Regional  
Planning Act (Raumplanungsgesetz) and the relevant Area Zoning  
Plan (Flächenwidmungsplan), according to which the applicant's  
land was marked as "agricultural land" (Landwirtschaftsgebiet).  
The applicant's project, however, did not concern agriculture.  
The Administrative Court concluded that, under these  
circumstances, it need not consider further the applicant's  
complaint on the hearing of the expert in the absence of the  
applicant's counsel.

B.   Relevant domestic law

**1.** Section 3 para. 1 (l) of the Landscape Protection Act reads  
as follows:

"A permit of the authority is required for the erection and  
for important changes affecting the interests of landscape  
protection of:

(l) Storage places with a surface of more than 400 square  
metres and dumps with a surface of more than 100 square  
metres."

Section 4 para. 2 of the Landscape Protection Act reads as  
follows:

"The authority may allow exemptions from paragraph 1 if it  
is secured that such changes would not violate the  
interests of landscape protection and, in particular, would  
not hinder the view on the lakes, or if they are necessary  
for reasons of public safety.  The authority may further  
allow exemptions if the interests of landscape protection  
are outweighed by other public interests.  In such a case  
the violation of the interests of landscape protection must  
be kept to a minimum by imposing conditions."

Section 5 of the Landscape Protection Act reads as follows:

"Filling, draining, ditching and other measures which  
endanger the habitat of plants and animals are prohibited  
within riparian forests, low moors with the exemption of  
marshland, high moors and pools.  The provisions of Section  
4 paragraph 2 apply mutatis mutandis."

Section 10 paras. 1 and 2 of the Landscape Protection Act  
reads as follows:

"(1) A permit may only be granted if it is ensured that the  
interests of landscape protection will not be violated.

(2) A permit must not be refused if the reason for its  
refusal can be eliminated by imposing conditions.  A permit  
may be granted notwithstanding a violation of the interests  
of landscape protection when they are outweighed by other  
public interests.  In such a case the violation of the  
interests of landscape protection must be kept to a minimum  
by imposing conditions."

**2.** Section 20 paras. 1 and 2 of the Regional Planning Act reads  
as follows:

"(1) Decisions which are based on Regional Acts must not be  
in contradiction with the Area Zoning Plan, if not provided  
otherwise by the respective Act.

(2) Decisions made contrary to paragraph 1 are null and  
void."

## COMPLAINTS

1.   The applicant complains that the decision on his application  
for permission to fill up the clay pit was not taken by an  
independent and impartial tribunal, as required by Article 6  
para. 1 of the Convention.  In any event, he did not have a  
public hearing before the Administrative Court.

2.   Under Article 6 para. 1 he further complains that the  
proceedings were conducted in an unfair manner.  He submits that  
the landscape protection expert consulted lacked independence as  
he was an employee of the Regional Government and that this  
expert was heard in his absence on 31 July 1987.  He also submits  
that the Constitutional Court's refusal to deal with his  
complaint and to decide on its merits rendered the proceedings  
unfair.

**3.** Finally the applicant complains that the proceedings were  
not conducted within a reasonable time, as required by Article  
6 para. 1 of the Convention.

## PROCEEDINGS BEFORE THE COMMISSION

The application was introduced on 5 January 1990 and  
registered on 22 January 1990.

On 14 October 1992 the Commission decided to communicate the  
application to the respondent Government and to request them to  
submit their written observations on admissibility and merits.

The Government's observations were submitted on 26 March  
1993 and a supplement to these observations on 16 April 1993.  
On 21 June 1993 the applicant submitted his observations in  
reply.

In his observations the applicant, for the first time,  
raised the complaints that the Constitutional Court's refusal to  
deal with his complaint and not to decide on its merits rendered  
the proceedings unfair and that contrary to Article 6 para. 1 of  
the Convention no hearing took place before the Administrative  
Court.

## THE LAW

1.a. The applicant complains that the decision on his application  
for permission to fill up the clay pit was not taken by an  
independent and impartial tribunal as required by Article 6 para.  
1 (Art. 6-1) of the Convention.

Article 6 para. 1 (Art. 6-1) of the Convention, as far as  
relevant, reads as follows:

"In the determination of his civil rights and  
obligations ... everyone is entitled to a fair and  
public hearing within a reasonable time by an  
independent and impartial tribunal established by law.  
..."

The Commission considers that the proceedings in question  
concerned the determination of the applicant's civil rights and  
obligations within the meaning of Article 6 para. 1 (Art. 6-1)  
of the Convention and that this provision was thus applicable  
(cf. Skärby judgment of 28 June 1990, Series A no. 180-B, p. 36,  
paras 27 et seq.; Fredin judgment of 18 February 1991, Series A  
no. 192, p. 20, para. 63).

Moreover, in the present case there was a "genuine and  
serious" dispute (contestation) between the applicant and the  
authorities regarding the question whether the applicant needed  
a permit under the Landscape Protection Act for his project and  
whether he fulfilled the conditions for obtaining such a permit  
and the outcome of this dispute was directly decisive for that  
right.  Accordingly, the applicant's right to fill up the  
abandoned pit on his land in accordance with the applicable laws  
and regulations constitutes a civil matter within the meaning of  
Article 6 (Art. 6) of the Convention.

The Government submit that the applicant's case was decided  
by an impartial and independent tribunal within the meaning of  
Article 6 para. 1 (Art. 6-1) of the Convention as the  
Administrative Court met the requirements of a tribunal.

In the applicant's view the Administrative Court did not  
fulfil the criteria of such a tribunal.  In any event, he did not  
have a public hearing before the Administrative Court as required  
by Article 6 para. 1 (Art. 6-1) of the Convention.

The Commission considers that while the proceedings before  
the District Authority and the Regional Government did not comply  
with the requirements of Article 6 para. 1 (Art. 6-1) of the  
Convention, it is sufficient for the purpose of this provision  
if the decisions taken by the lower instances were subject to  
subsequent control by judicial bodies which exercised full  
jurisdiction in conformity with this provision (Eur. Court H.R.,  
Albert and Le Compte judgment of 10 February 1983, Series A no.  
58, p. 16, para. 29).

The Commission notes that further proceedings were conducted  
before the Administrative Court.

The Commission recalls that the Administrative Court fulfils  
the requirements of Article 6 para. 1 (Art. 6-1) of the  
Convention in matters which are not exclusively within the  
discretion of administrative authorities and where the  
Administrative Court considers the submissions on their merits,  
point by point, without declining jurisdiction in replying to  
them or ascertaining various facts (Eur. Court H.R., Zumtobel  
judgment of 21 September 1993, para. 31 and 32, to be published  
in Series a no 266-A).

The Commission further notes that in the present case the  
Administrative Court, when deciding on the applicant's second  
complaint on 22 May 1989, found that the applicant's project was  
subject to a permit which had, in accordance with the relevant  
law, to be refused.  The Administrative Court did not have to  
decline jurisdiction in dealing with the applicant's complaint.

As a result, the Commission considers that the requirements  
of a "tribunal" within the meaning of Article 6 para. 1 (Art. 6-  
1) of the Convention have been complied with.

b.   As regards the applicant's further complaint about the lack  
of a hearing before the Administrative Court, the Commission,  
even assuming that the applicant complied with the time-limit as  
stipulated in Article 26 (Art. 26) of the Convention, notes that  
he did not request such a hearing.  The Commission, recalling the  
practice of the Administrative Court not to hear the parties  
unless one of them expressly requests it to do so, finds that the  
applicant must be deemed to have waived unequivocally his right  
to a hearing (see Zumtobel judgment, loc. cit., para. 34).

c.   It follows that the above complaints are manifestly ill-  
founded within the meaning of Article 27 para. 2 (Art. 27-2) of  
the Convention.

2.   The applicant further complains under Article 6 para. 1  
(Art. 6-1) of the Convention that the proceedings were conducted  
in an unfair manner.

a.   He complains in particular that the landscape protection  
expert lacked independence as he was an employee of the Regional  
Government and that this expert was heard in his absence on 31  
July 1987.

The Government submit that the applicant did avail himself  
of the opportunity to comment on the expert's statements.  In any  
way, the expert's report was of no relevance in the further  
proceedings as it was limited to issues under Section 5 of the  
Landscape Protection Act, whereas the Administrative Court  
dismissed the applicant's complaint under Sections 3 and 10 of  
the said Act.

The Commission recalls that in order to determine whether  
the aim of Article 6  (Art. 6) - a fair trial - has been  
achieved, regard must be had to the entirety of the domestic  
proceedings conducted in the case (Eur. Court H.R., Imbroscia  
judgment of 24 November 1993, para. 38, to be published in Series  
A no. 275).

The Commission notes that on 22 May 1989 the Administrative  
Court dismissed the applicant's complaint holding that his  
application for a permit under the Landscape Protection Act had  
to be refused under Section 20 para. 1 of the Regional Planning  
Act as it contradicted the Area Zoning Plan.  It did not,  
therefore, take the issues under Section 5 of the Landscape  
Protection Act into account, to which the expert opinion related.  
The Administrative Court concluded that under these circumstances  
it need not consider further the applicant's complaint that the  
expert had, on one occasion, been heard in the absence of the  
applicant's counsel.

b.   As regards the applicant's complaint that the Constitutional  
Court's refusal to deal with his complaint and to decide on its  
merits rendered the proceedings unfair, the Commission observes  
that the applicant has raised this complaint for the first time  
in his observations in reply of 21 June 1993.

Moreover, the Commission, even assuming that the applicant  
complied with the time-limit as stipulated in Article 26 (Art.  
26) of the Convention, finds no indication that the proceedings  
before the Constitutional Court affected the fairness of the  
proceedings in general.

c.   Under these circumstances the Commission, looking at the  
proceedings as a whole, finds that there is no appearance of a  
violation of the applicant's right to a fair hearing.

This part of the application, therefore, is again manifestly  
ill-founded within the meaning of Article 27 para. 2 (Art. 27-2)  
of the Convention.

**4.** Finally the applicant complains that the proceedings were  
not conducted within a reasonable time as required by Article 6  
para. 1  
(Art. 6-1) of the Convention.

The Government contend that the proceedings were concluded  
within a reasonable time.  They submit in particular that the  
Administrative Court dealt twice with the case and that delays,  
if any, were attributable to the applicant.

The applicant refers in particular to delays in the  
proceedings before the administrative authorities.  Thus between  
2 July 1984, when he lodged his appeal, and 21 April 1986, when  
an oral hearing took place, the Regional Government made no steps  
to further the proceedings.

The Commission finds that this complaint must be examined  
on its merits.  This part of the application cannot, therefore,  
be declared

manifestly ill-founded within the meaning of Article 27 para. 2  
(Art. 27-2) of the Convention.  No other ground for declaring it  
inadmissible has been established.

## For these reasons, the Commission unanimously

DECLARES ADMISSIBLE, without prejudging the merits of the  
case, the applicant's complaint regarding the length of the  
proceedings;

and

DECLARES INADMISSIBLE the remainder of the application.