# Europakommissionens beslut den 5 april 1995 i målet DANIELSSON mot Sverige (nr 16115/90)

- Rubrik i HUDOC: DANIELSSON v. SWEDEN
- Slag: Europakommissionens beslut · språk: engelska · datum: 1995-04-05
- Ansökningsnummer: 16115/90
- ECLI: ECLI:CE:ECHR:1995:0405DEC001611590
- Artiklar (HUDOC): 3, 6, 6-1, 6-3-c, 34
- Slutsats (HUDOC): Inadmissible
- Källa: Europadomstolen (HUDOC), © ECHR-CEDH: https://hudoc.echr.coe.int/eng?i=001-2077
- Ratio Lex: https://ratiolex.se/internationell-ratt/europadomstolen/001-2077/

Elektronisk version. Den undertecknade texten i domstolens arkiv är den autentiska (art. 44.3 EKMR).

## SUR LA RECEVABILITÉ

Application No. 16115/90  
by Alice DANIELSSON  
against Sweden

The European Commission of Human Rights (Second Chamber) sitting  
in private on 5 April 1995, the following members being present:

Mrs.  G.H. THUNE, Acting President  
MM.   G. JÖRUNDSSON  
S. TRECHSEL  
J.-C. SOYER  
H.G. SCHERMERS  
F. MARTINEZ  
L. LOUCAIDES  
J.-C. GEUS  
M.A. NOWICKI  
I. CABRAL BARRETO  
J. MUCHA  
D. SVÁBY

Mr.   K. ROGGE, Secretary to the Chamber

Having regard to Article 25 of the Convention for the Protection  
of Human Rights and Fundamental Freedoms;

Having regard to the application introduced on 24 July 1989 by  
Alice DANIELSSON against Sweden and registered on 1 February 1990 under  
file No. 16115/90;

Having regard to the report provided for in Rule 47 of the Rules  
of Procedure of the Commission;

Having regard to the observations submitted by the respondent  
Government on 16 February 1993 and the observations in reply submitted  
by the applicant on 17 December 1993;

Having deliberated;

Decides as follows:

## THE FACTS

The facts of the case, as submitted by the parties, may be  
summarised as follows.

The applicant is a Swedish citizen, born in 1908. At the time of  
the flooding of her house in 1979 described below, she was living in  
Borgholm, Sweden. Awaiting the outcome of the ensuing damage  
proceedings she has since been living with her son in Stockholm. Before  
the Commission the applicant is represented by Mrs. Siv Westerberg, a  
lawyer practising in Göteborg.

A.    The particular circumstances of the case

On 10 August 1979 the applicant's house in Borgholm was flooded  
and damaged. The applicant ordered an expert opinion on the origins of  
the flooding. In his report, dated 25 September 1979, the expert,  
Mr. H, stated that the flooding was caused by a faulty construction of  
a neighbouring rain draining pipe of the municipal sewer system as a  
result of which tree roots had been able to penetrate and block the  
pipe.

Proceedings before the State Water Board (Statens va-nämnd)

On 28 October 1981 the applicant instituted proceedings before  
the State Water Board against the Municipality of Borgholm through her  
first representative. However, due to problems of cooperation she  
decided to appoint another representative and filed an additional writ  
on 6 November 1981. She maintained that her house had been flooded as  
a result of the deficiencies in the municipal sewer system observed by  
Mr. H. In her submissions to the Water Board the applicant left open  
the question whether the system's general design might also have been  
wrong. The flooding had caused damage to the wooden beams of the  
basement floor and also the basement's wooden walls. She claimed  
compensation for the repair costs and for the reduced possibility to  
use the house awaiting repairs.

On 23 December 1981 the Municipality acknowledged in a submission  
to the Water Board that it was responsible for the damage caused by the  
flooding. It argued, however, that certain acts on the part of the  
applicant had worsened the damages.

During January and February 1982 the parties' observations were  
exchanged following which the applicant, on 11 March 1982, requested  
a preparatory meeting as soon as possible.

On 11 August 1982 the applicant was informed that the preparatory  
meeting requested was scheduled for 15 September 1982.

On 2 September 1982 the applicant submitted a new expert opinion,  
dated 12 August 1982 and signed by A.E. and J.W. (two real estate  
valuers), which confirmed the damage to the basement floor and walls  
but which in addition referred to damage to the structure of the house  
in the form of cracks in the walls. The opinion stated that it was  
likely that the cracks were a result of the house having been lifted  
by the rising of the ground water.

On 15 September 1982 the Water Board held the preparatory meeting  
and the applicant was requested to finalise her claims and to submit  
her evidence not later than 1 November 1982. Following an extension of  
this time-limit the applicant submitted certain information on  
16 November 1982 and, upon request, further information on  
9 December 1982. The Municipality's observations in reply were  
submitted on 10 February 1983, following which the parties were  
summoned to a hearing on 14 April 1983.

On 23 March 1983, however, the hearing was cancelled due to the  
fact that the Municipality's lawyer had fallen ill.

On 6 and 12 July 1983 the applicant was again requested to  
specify her claims and the evidence invoked. She submitted her reply  
on 2 August 1983.

As finally defined the applicant's claims were as follows. Repair  
costs were claimed in the amount of 100,000 SEK. Her own costs for  
having the repairs done were estimated at 15,000 SEK. The estate's loss  
of value was to be compensated in the amount of 20,000 SEK. The  
reduction of her possibilities of using the house was to be compensated  
as from 10 August 1979 with a yearly sum equivalent to 18% of the  
estate's market value in undamaged condition, i.e. for 1979 2,400 SEK  
a month, until 4 months after the Water Board's decision became final.  
In addition she claimed reimbursement for her legal costs and expenses.

The Municipality accepted to pay 40,000 SEK for repair costs and  
to reimburse the applicant for the reduction of her use of her property  
at a rate of 2,000 SEK per year for the period from 10 August until  
31 December 1979. It also accepted part of the claims for legal costs  
and expenses.

On 31 August 1983 the Water Board held a hearing including an on  
site investigation of the applicant's property. During the hearing the  
Board heard three witnesses.

On 7 October 1983 the Water Board rendered its judgment. It  
awarded 90,000 SEK for repair costs and for the applicant's costs to  
have the repairs carried out. However, the Water Board did not find it  
established that the cracks in the walls were caused by the flooding.  
Accordingly, it rejected the applicant's claims to the extent that  
these related to the repair of these cracks. It also rejected the  
applicant's claims for compensation for loss of value as it had not  
been established that there had been any such loss. On the other hand  
the Water Board found that although the applicant was in principle  
under a duty to carry out repairs quickly in order to minimise her  
losses she had, in the circumstances of the case, been entitled to wait  
therewith for a certain time, approximated at 14 months. Her losses on  
this point were estimated at 600 SEK per month. The Water Board  
rejected both parties' claims for legal costs and expenses.

Proceedings before the Water Court of Appeal (vattenöverdomstolen)

On 3 November 1983 the applicant appealed against the judgment  
to the Water Court of Appeal requesting full compensation in accordance  
with her claims before the Water Board.

On 29 November 1983 the applicant submitted that no supplementary  
observations were needed at that moment. The Municipality was then  
requested to submit its reply within three weeks. Following a reminder  
the Municipality replied on 13 January 1984.

In reply to the appeal court's request the applicant declared,  
on 12 March 1984, that the case could be determined on the basis of the  
case-file.  On 12 April 1984 the Municipality agreed and the applicant  
was requested to conclude her presentation within three weeks.

However, by 14 May 1984 the applicant had changed her mind and  
now requested a hearing in so far as the Court would find it necessary  
in order to prove the cause of some cracks in the walls of her house.  
The Municipality contested that the cracks were caused by the flooding.  
Additional submissions concerning this followed in the light of which  
the applicant, on 23 November 1984, requested that a hearing be held.  
She furthermore requested the hearing of an expert witness. The  
applicant was hereafter granted the time until 7 December 1984 to  
submit the name of her expert.

Hereafter the applicant requested and was granted several  
extensions. On 10 May 1985 she submitted an expert opinion from a  
geologist, Mr. L. On 13 May 1985 the applicant requested an additional  
extension until 24 May in order to submit photos and other  
documentation.

On 14 May 1985 the applicant's house was flooded again. On  
26 June 1985 the applicant notified the Court about the flooding and  
requested an additional extension of the time-limit as she intended to  
submit her documentation as promised not later than 12 July 1985.

On 26 August 1985 the applicant was given the opportunity to  
conclude her presentation within ten days. However, on 3 September 1985  
the applicant informed the Court that she had changed counsel and  
therefore requested an extension of the time-limit. The extension was  
granted until 18 October 1985 and subsequently until 15 November 1985.

On 11 November 1985 the applicant submitted an amendment to her  
initial claims as a result of the new flooding of her house on  
14 May 1985. Her claims now also included a duty for the Municipality  
to redeem the house as she now considered that the sewer system was so  
inappropriate as to make it unreasonable to repair the house. In case  
the Court would not accept this new claim, the applicant increased her  
claims for repair costs to 181,800 SEK and her claim for loss of value  
to 125,000 SEK. The applicant also increased certain other claims, in  
particular her claim as to compensation for the loss of possibility to  
use her house. She furthermore requested the production of certain new  
written evidence and the hearing of Mr. H as a witness in order to  
prove, inter alia, that the cracks in the house structure were caused  
by the flooding as a result of the deficient sewer system. Finally, she  
asked for an on site investigation to be held in conjunction with the  
hearing of the case.

On 18 November 1985 the applicant's new claims and observations  
were communicated to the Municipality which replied on 20 January 1986.  
The applicant hereafter stated and specified her evidence which was  
communicated to the Municipality. On 20 March 1986 the Municipality  
both objected to the changes in the applicant's claims and requested  
the Court to reject the new evidence proposed.

The Water Court of Appeal did not accept the applicant's requests  
for a main hearing and an on site investigation and by judgment of  
3 July 1986 the Court furthermore refused to accept the amended claims.  
The Court also refused to hear Mr. H as it found it clear that the  
cracks in the house structure were not caused by the flooding and that,  
accordingly, the evidence proposed was unnecessary. On the merits the  
Water Court of Appeal found no reason to deviate from the conclusions  
reached by the Water Board, the decision of which it confirmed. The  
applicant was ordered to pay the Municipality's costs and expenses in  
the appeal proceedings.

Proceedings before the Supreme Court (Högsta domstolen)

On 14 July 1986 the applicant applied to the Supreme Court for  
leave to appeal. She maintained that the Water Court of Appeal had  
committed grave procedural errors by deciding her case without an oral  
hearing, by refusing her amended claims and by refusing to call new  
witnesses and to accept other evidence. As to the merits she reiterated  
her claims as amended before the Water Court of Appeal.

On 28 July 1986 the applicant requested a further month to file  
additional observations. On 4 August 1986 the Supreme Court granted her  
an extension until 29 August for this purpose.

On 25 August 1986 the applicant informed the Supreme Court that  
she did not at that moment in time wish to submit further observations  
but wished to be kept informed whether or not the Supreme Court  
intended to refer her case back to the Water Court of Appeal. She was  
requested to submit further observations before 5 September 1986.

On 18 May 1987 the Supreme Court requested the Water Court of  
Appeal to submit information as to its refusal of an oral hearing. The  
Water Court of Appeal replied on 22 June 1987.

On 19 August 1987 the applicant was granted leave to appeal.

From August to December 1987 the parties submitted their  
observations and the case-file was completed by 29 December 1987.

On 2 March 1988 the Supreme Court quashed the appeal court's  
judgment as it found it tainted with grave procedural errors on account  
of the refusals to hold a public hearing and to hear further witnesses.  
The case was referred back to the Water Court of Appeal for a new  
examination.

On 2 July 1988 the applicant's house was flooded again.

Proceedings before the Water Court of Appeal

On 4 July 1988 the Water Court of Appeal summoned the parties to  
appear before it at an oral hearing to be held on 15 September 1988.  
They were also requested to submit information with regard to written  
evidence not later than 8 August 1988.

On 5 July 1988 the applicant's insurance company examined the  
house concluding that there were big cracks in the walls and that  
several parts of the house had been damaged by moist which, having  
regard to the nature of the damage caused, appeared to have been  
present for a long time. It concluded that the damage was not covered  
by the applicant's insurance.

On 25 July 1988 the applicant's house was flooded anew.

On 1 August 1988 the applicant's insurance company made a new  
examination of the house which confirmed that water had again  
penetrated the basement. On 2 August 1988 the applicant informed the  
Court that there had been new damage to her property. She requested an  
extension of the time-limit fixed for the submission of written  
evidence until 10 August.

On 17 August 1988 the Municipality decided to indemnify all  
property owners affected by the last flooding to the extent that the  
damage caused was not covered by insurance. It also requested the  
Construction Office (byggnadskontoret) to find a final solution to the  
flooding problems in the area.

On 1 September 1988 the applicant's insurance company informed  
the applicant that the damage caused by the latest flooding was not  
covered by her insurance.

On 6 September 1988 the applicant reiterated her claims as  
amended in the previous proceedings before the Water Court of Appeal  
with certain minor changes. She also reiterated her submission that the  
two new floodings of the house on 2 and 25 July 1988 showed that it  
would be more costly to repair the house after each flooding than to  
have the house redeemed by the Municipality at market price. In support  
of these claims she lodged a new expert opinion, dated 4 September 1988  
and signed by a geologist, Mr. L, according to which the house had  
again been lifted by the rising ground water in July 1988 and that this  
was a result of the insufficient rain draining capacity of the  
municipal sewer system. The opinion also stated that it would be  
meaningless to repair the house before the sewer system had been  
appropriately amended.

On 15 September 1988 the Water Court of Appeal held an oral  
hearing. The applicant claimed in the first place that the Municipality  
should be ordered to redeem the house and that she should be  
compensated for her loss of use of the house in accordance with her  
previous claims before the Water Court of Appeal. In the alternative  
she claimed compensation in the amount of 181,800 SEK for repair costs,  
487,961 SEK to cover the loss of value and also compensation for loss  
of use on the same terms as before. She furthermore requested that  
Mr. H should be heard as a witness in order to prove that the sewer  
system was in such condition that it would be unreasonable to carry out  
further repairs. The Municipality objected to any change of the Water  
Board's judgment of 7 October 1983 and asked the Court to refuse any  
amendments to the original claims as well as the hearing of Mr. H.

On the day of the hearing the Water Court of Appeal decided to  
accept part of the amendments to the applicant's claims for repair  
costs and to allow the applicant to add her claim that the Municipality  
should redeem the estate and compensate her for the loss of value. The  
Court, however, decided to refuse the hearing of Mr. H as his testimony  
was deemed unnecessary. The Court went on to hear three witnesses.  
These witnesses were the same as those heard by the Water Board.  
Thereafter, the Court made an on site investigation of the house.

By judgment of 14 October 1988 the Water Court of Appeal  
confirmed the Water Board's judgment.Proceedings before the Supreme  
Court

On 4 November 1988 the applicant applied to the Supreme Court for  
leave to appeal and requested permission to file her grounds of appeal  
within a period of two months.

On 23 November 1988 the applicant's representative withdrew from  
the case and on 19 December the applicant requested, and was granted,  
an additional extension until 15 March 1989 to file the grounds of  
appeal. On 9 March 1989 the applicant requested, and was granted, a  
further extension until 16 May 1989.

On 8 May 1989 the applicant lodged, through her new counsel, her  
grounds of appeal. These reiterated her submissions before the Water  
Court of Appeal. In addition, the applicant maintained that the Water  
Court of Appeal's refusal to hear Mr. H constituted a procedural error  
of importance for the outcome of the case.

On 10 May 1989 the applicant wrote to the Supreme Court stating  
that she considered that her case had been severely mismanaged by her  
counsel, the courts, the defendant party and the insurance companies  
and that she wished to file additional observations which would be  
submitted before the 15 June 1989.

On 15 June 1989 she was informed by her counsel that the Supreme  
Court had indicated that the question of leave to appeal would be  
decided in the course of the autumn.

On 5 December 1989 the Supreme Court decided to grant leave to  
appeal in respect of the question of compensation for repair costs. It  
refused leave to appeal in respect of the question of alleged  
procedural errors committed by the Water Court of Appeal and in respect  
of the question of redemption of the estate. It decided to suspend, for  
the time being, its examination of the questions of compensation for  
loss of value and for loss of use of the property and the question of  
reimbursement of costs and expenses.

On 12 February 1990 the applicant asked for an extension of the  
time-limit for the submission of her observations to the Supreme Court  
until the case had been subject to "a different legal examination".

On 28 February 1990 the Supreme Court refused to grant any  
extension of the time-limit for the filing of the applicant's  
observations. Due to this the applicant submitted, by letters of 16 and  
19 March 1990, that she had revoked her counsel's power of attorney and  
declared that the case before it was terminated as a result of all  
errors committed in the course of the proceedings.

By letter of 20 March 1990 the Supreme Court requested the  
applicant to state whether she withdrew her appeal. On 21 March 1990  
the applicant replied that she did not withdraw her appeal but she  
maintained that the examination of the case should be suspended pending  
the outcome of the examination of the present application by the  
European Commission of Human Rights.

On 30 August 1990 the Supreme Court requested the applicant to  
submit, within two weeks, her opinion as to the need for an oral  
hearing. In her reply of 12 September 1990 the applicant maintained  
that she considered the examination of the case to be temporarily  
suspended since leave to appeal had only partially been granted and  
since several violations of Swedish law and of her human rights had  
taken place in the course of the proceedings. She stated that she would  
consider how the case was to be dealt with by the Supreme Court after  
the European Commission of Human Rights had examined her complaints.

On 19 September 1990 the Supreme Court informed the applicant  
that it had decided to hold a hearing and requested her to provide a  
list of the evidence she wished to rely on.

In her reply of 21 September 1990 the applicant reiterated what  
she had stated in her reply of 12 September 1990.

On 3 October 1990 the Municipality lodged their list of evidence.

On 10 October 1990 the applicant was summoned to appear before  
the Supreme Court on 21 November 1990. The applicant replied on  
14 October 1990 that the Supreme Court was biased in its handling of  
the case and that she had now left the case with the European  
Commission of Human Rights. The applicant did not appear at the hearing  
on 21 November 1990. As the Supreme Court found no valid excuse for her  
absence it decided on the same day to dismiss the appeal and ordered  
the applicant to pay the Municipality's costs. It granted the applicant  
until 5 December 1990 to justify her absence and to request the Court  
to resume its examination of the case.

No reply having been received from the applicant within the  
prescribed time-limit, the Supreme Court decided on 18 December 1990  
not to grant leave to appeal on the points which had remained pending.  
As a result the judgment of the Water Court of Appeal became final.

B.    Relevant domestic law

The Water Board is a national authority and not a court.  
Provisions regulating the activities of the Board are found in the  
State Water Board Act (Lag (1976:839) om statens va-nämnd), the  
Instruction for the State Water Board (Kungl. Maj:ts Instruktion  
(1970:350) för statens va-nämnd) and the Act concerning General Water  
and Sewage Facilities (Lagen (1970:244) om allmänna vatten- och  
avloppsomläggningar).

Rules concerning the procedure before the Board are found in the  
State Water Board Act of 1976 ("the 1976 Act"). The Board consists of  
a chairman and five other members. The chairman shall be a lawyer, who  
has experience from having served as a judge. The other members shall  
have technical expertise of various kinds (cf. the 1976 Act Section 2).

Proceedings before the Water Board are instituted by means of an  
application in writing. If an application is not complete, the  
applicant shall be requested to submit supplementary information  
(Section 8). Unless the application is rejected on formal grounds, the  
Board shall request the defendant to submit observations in writing.  
There may also be a further exchange of writs (Section 9). There shall  
be a hearing before the Board unless it is obvious that a hearing is  
not necessary in order to determine the case (Section 10). The Board  
is obliged to clarify the issues in dispute; its actions shall aim at  
a proper investigation of the matter at stake and it shall attempt to  
secure a friendly settlement (Section 11). The Board may also conduct  
on site investigations and engage experts on particular topics (Section  
12).

The Code of Judicial Procedure (rättegångsbalken) is not  
generally applicable in matters concerning general water and sewage  
facilities. The 1976 Act refers to the Code in only a few instances.  
If a question as to procedure is not regulated anywhere else, the  
Administrative Procedure Act (förvaltningslagen (1986:223)) is to be  
applied.

An appeal against the Board's decision on the merits may be  
lodged with the Svea Court of Appeal and is examined by this Court in  
its composition as the Water Court of Appeal. A judgment from the Water  
Court of Appeal may, with leave, be appealed against to the Supreme  
Court. The Code of Judicial Procedure is applicable to the proceedings  
before these courts (Sections 19, 20, 21 and 23 of the 1976 Act).

There is no equivalent in the 1976 Act to the provision in the  
Code of Judicial Procedure, Chapter 49, Section 6 (now Chapter 49,  
Section 7). According to the latter provision, a party who is of the  
opinion that the proceedings have been delayed, without reason, by  
means of a lower court order may appeal from that order separately  
through a limited appeal. The 1976 Act, however, does not refer to the  
Code, Chapter 49, Section 6. The latter provision is furthermore not  
applicable to decisions made by a court of appeal or the Supreme Court.  
There are no other provisions to the effect that a party may challenge  
the length of the proceedings.

## COMPLAINTS

Under Article 3 of the Convention the applicant maintains that  
she has been subjected to inhuman and degrading treatment by all  
authorities and courts involved.

Under Article 6 para. 1 of the Convention she maintains that her  
dispute with the Municipality of Borgholm concerning the damage to her  
house was not determined within a reasonable time. She also maintains  
that the courts were partial and did not guarantee her a fair hearing.  
In respect of this the applicant also invokes Article 6 para. 3 (c) and  
(d) and Article 13 of the Convention.

With reference to Article 8 of the Convention and Article 1 of  
Protocol No. 1 to the Convention the applicant complains that the  
authorities have made her house uninhabitable and thereby forced her  
to live elsewhere. She also refers to the authorities' refusal to  
redeem the house and thereby enable her to purchase a new home.

With reference to the above alleged violations of the Convention  
the applicant also invokes Article 17 of the Convention.

Finally, in her observations submitted on 17 December 1993 the  
applicant complains, under Article 13 of the Convention, that she did  
not have, under domestic law, an effective remedy in respect of the  
complaint concerning the length of the proceedings.

## PROCEEDINGS BEFORE THE COMMISSION

The application was introduced on 24 July 1989 and registered on  
1 February 1990.

On 14 October 1992 the Commission (Second Chamber) decided that  
notice should be given to the respondent Government and to invite them  
to submit written observations on the admissibility and merits limited  
to the complaint concerning the length of the proceedings.

After an extension of the time-limit the Government submitted  
their observations on 16 February 1993.

On 8 March 1993 the Commission decided to grant legal aid to the  
applicant.

On 17 December 1993 the applicant submitted her observations in  
reply to those of the Government.

## THE LAW

**1.** The applicant complains that she has been subjected to inhuman  
and degrading treatment contrary to Article 3 (Art. 3) of the  
Convention in the course of the proceedings before the various national  
authorities and courts. Article 3 (Art. 3) of the Convention reads as  
follows:

"No one shall be subjected to torture or to inhuman or  
degrading treatment or punishment."

The Commission recalls that according to the interpretation of  
the concept of inhuman and degrading treatment of both the Commission  
and the Court, ill-treatment must attain a minimum level of severity  
if it is to fall within the scope of Article 3 (Art. 3). The assessment  
thereof depends on all the circumstances of a particular case,  
including the duration of the treatment, its physical and mental  
effects and, in some cases, the sex, age and state of health of the  
person concerned (cf. Eur. Court H.R., Ireland v. the United Kingdom  
judgment of 18 January 1978, Series A no. 25, p. 65, para. 162).

In making an assessment in the present case the Commission finds  
that the facts established do not disclose a treatment of the applicant  
which according to the above case-law reaches the level of severity  
required to fall within the scope of Article 3 (Art. 3) of the  
Convention.

It follows that this part of the application is manifestly  
ill-founded within the meaning of Article 27 para. 2 (Art. 27-2) of the  
Convention.

2a.   Under Article 6 paras. 1 and 3 (c) and (d)  
(Art. 6-1, 6-3-c, 6-3-d) as well as Article 13 (Art. 13) of the  
Convention the applicant complains that she did not have a fair hearing  
by an impartial tribunal when the dispute concerning the damage to her  
house due to flooding was determined. The provisions invoked by the  
applicant read in their relevant parts as follows:

"In the determination of his civil rights ... everyone is  
entitled to a fair ... hearing within a reasonable time by  
an ... impartial tribunal ...  
...  
Everyone charged with a criminal offence has the following  
minimum rights:  
...  
c.   to defend himself in person or through legal  
assistance of his own choosing or, if he has not sufficient means  
to pay for legal assistance, to be given it free when the  
interests of justice so require;  
d.   to examine or have examined witnesses against him and  
to obtain the attendance and examination of witnesses on his  
behalf under the same conditions as witnesses against him;  
..."

The Commission finds that in the present case there is no  
question of a determination of a "criminal charge" within the meaning  
of Article 6 (Art. 6) of the Convention. Accordingly, Article 6 para.  
3 (c) and (d) (Art. 6-3-c, 6-3-d) are not applicable. However, the  
Commission has taken the applicant's allegations under these provisions  
into account when considering the complaint of unfairness and  
partiality as submitted under Article 6 para. 1 (Art. 6-1) of the  
Convention.

The Commission recalls that the question whether a hearing  
conforms with the standard of fairness laid down by Article 6 para. 1  
(Art. 6-1) of the Convention must be decided on the basis of the court  
proceedings as a whole and after they have been concluded. Furthermore,  
as regards the question of impartiality the Commission recalls that the  
existence of such impartiality must be determined according to a  
subjective test, that is on the basis of the personal conviction of a  
particular judge in a given case, and also according to an objective  
test, that is ascertaining whether the judge offered guarantees  
sufficient to exclude any legitimate doubt in this respect.

When considering these elements in the circumstances of the  
present case, and in the light of the applicant's submissions, the  
Commission has not found any substantiated allegations which would  
merit a further examination of these aspects of Article 6 para. 1 or  
Article 13 (Art. 6-1, 13) of the Convention.

The Commission therefore concludes that the applicant's  
allegations of unfairness and partiality are manifestly ill-founded  
within the meaning of Article 27 para. 2 (Art. 27-2) of the Convention.

b.    Under Article 6 para. 1 (Art. 6-1) of the Convention the  
applicant also complains that her case was not determined within a  
reasonable time. She maintains that the proceedings commenced on  
10 August 1979 when her house was flooded for the first time and ended  
on 18 December 1990  when the Supreme Court refused leave to appeal as  
regards the remaining issues still pending before it. She considers  
that in particular having regard to what was at stake and to her  
advanced age such a period of time cannot be considered to be  
reasonable.

The Government do not dispute that "civil rights" within the  
meaning of Article 6 (Art. 6) of the Convention are at issue, nor do  
they maintain that the applicant has not complied with the requirements  
of Article 26 (Art. 26) of the Convention. However, they maintain that  
the applicant's actions before the domestic instances were such that  
she cannot claim to be a victim within the meaning of Article 25  
(Art. 25) of the Convention of the alleged violation of her right to  
a hearing within a reasonable time.

In the alternative the Government maintain that the reasonable  
time requirement in Article 6 (Art. 6) of the Convention was not  
exceeded. In this respect the Government submit, in particular, that  
the relevant period to be taken into consideration runs from  
28 October 1981 when the applicant instituted proceedings before the  
Water Board until 14 October 1988 when the Water Court of Appeal  
pronounced its last judgment. Furthermore, the Government contend that  
the case was of considerable complexity and that the applicant, by her  
own conduct, prolonged the  proceedings.

As regards Article 25 (Art. 25) of the Convention the Commission  
has no doubt that the applicant may claim to be a victim, within the  
meaning of this provision, of the alleged violation at issue. The case  
concerned the determination of her civil rights within the meaning of  
Article 6 (Art. 6) of the Convention and required a determination  
within a reasonable time. Whether her conduct before the various  
authorities and courts contributed to the length of those proceedings  
will be considered below but it did not affect her status as a victim  
within the meaning of Article 25 (Art. 25) of the Convention because  
she was both affected and aggrieved by the length of the proceedings  
(cf. mutatis mutandis No. 11394/84, Dec. 5.3.86, D.R. 46 p. 214 at  
p. 217).

As regards the period to be taken into consideration the  
Commission recalls that the period to which Article 6 (Art. 6) is  
applicable in civil cases normally starts to run with the issuing of  
the writ commencing proceedings before the court to which the plaintiff  
submits the dispute. However, where such proceedings may only be  
instituted after a determination of the same dispute by an  
administrative authority the concept of "reasonable time" must be  
applied so as to include both the administrative and the court  
proceedings (cf. Eur. Court H.R., König judgment of 28 June 1978,  
Series A no. 27, p. 33, para. 98).

In the present case the Commission recalls that the problems  
arose when the applicant's house was flooded in August 1979. However,  
the applicant did not bring the dispute before the Water Board until  
28 October 1981 and the Commission has not found it established that,  
under domestic law, the applicant was prevented in any way from doing  
so at an earlier date. On the other hand the Commission finds that,  
although the Water Board is not a court, the applicant could not  
commence proceedings in court until the Water Board had determined the  
dispute. Accordingly, the Commission considers that the relevant period  
under Article 6 (Art. 6) of the Convention started to run on  
28 October 1981.

As regards the question of when the period in question came to  
an end the Government maintain that the applicant's conduct in the  
proceedings before the Supreme Court was such that it should not be  
taken into account and that, therefore, the relevant period should be  
considered as having ended with the pronouncement of judgment of the  
Water Court of Appeal on 14 October 1988.

The Commission does not agree. It may be that a litigant for  
different reasons in the course of the dispute withdraws from a case  
or otherwise decides not to pursue it. This may also be a relevant fact  
in determining the reasonableness of the length of the proceedings.  
However, in the present case the proceedings did not come to an end  
until 18 December 1990 when the Supreme Court decided not to grant  
leave to appeal in respect of the remaining issues still pending before  
it. Therefore the Commission concludes that the relevant period lasted  
from 28 October 1981 until 18 December 1990, i.e. approximately nine  
years and two months.

The Commission recalls that the reasonableness of the length of  
the proceedings must be assessed in the light of the particular  
circumstances of the case and with reference to the following criteria:  
the complexity of the case, the conduct of the parties and the conduct  
of the authorities dealing with the case (cf. Eur. Court H.R., Vernillo  
judgment of 20 February 1991, Series A no. 198, p. 12, para. 30).

As regards the complexity of the case the Government submit that  
the issue in question was of considerable complexity, necessitating  
several expert opinions and the evaluation of technical evidence.  
Furthermore, the applicant's claims were numerous and new floodings in  
the course of the proceedings gave rise to new claims and  
investigations of an even more complicated character.

The applicant does not dispute that the case was complex. This  
is evident in view of the fact that special boards and courts deal with  
these matters. However, she maintains that as these authorities have  
the appropriate knowledge in this field the complexity of the case is  
no excuse for the length of the proceedings.

The Commission finds that the case was of a complex nature  
necessitating inter alia expert advice and on site investigations. The  
unfortunate recurrences of the flooding of the house also added to the  
complexity of the case and contributed to prolonging the proceedings.

As regards the conduct of the parties the Government submit that  
the length of the proceedings was mainly attributable to the applicant,  
whereas they maintain that the Municipality did not contribute to any  
delays of significance. The Government have not expressed any views on  
the conduct of the authorities and courts involved in the determination  
of the case.

The applicant admits that she asked for certain extensions of  
time-limits, but she maintains that this was due in particular to her  
age and the need to change counsel. She maintains that, on the other  
hand, the authorities and courts deliberately prolonged the case  
because of her age in order to favour the defendant.

The Commission recalls that the proceedings before the Water  
Board lasted from 28 October 1981 until 7 October 1983, i.e.  
approximately two years. The Commission finds that neither the  
applicant nor the Municipality contributed to prolonging these  
proceedings. The Commission has not overlooked that it apparently took  
the Board from March to September 1982 to arrange the preparatory  
session and that the hearing of the case had to be re-scheduled due to  
illness on part of counsel for the defendant. However, the Commission  
considers that the Water Board otherwise pursued the case by setting  
time-limits and notifying the parties of the state of proceedings.

The first set of proceedings before the Water Court of Appeal  
lasted from 3 November 1983 until 3 July 1986, i.e. two years and eight  
months. The Commission recalls that during this period the applicant  
asked on ten occasions for an extension of the time-limits fixed and  
failed to comply with others. In these circumstances the Commission  
finds that the applicant's conduct prolonged the proceedings in the  
Water Court of Appeal whereas it has not been established that either  
the defendant or the Court contributed to delays of any significance.

As regards the first set of proceedings before the Supreme Court  
the Commission recalls that they lasted from 14 July 1986 until  
2 March 1988, i.e. approximately one year and eight months. During this  
period the Court obtained observations from the applicant and the Water  
Court of Appeal (until 22 June 1987) on the basis of which leave to  
appeal was granted on 19 August 1987. Subsequently, observations were  
obtained from the applicant and the Municipality (until  
29 December 1987) following which the Water Court of Appeal's judgment  
was quashed by the Supreme Court on 2 March 1988.

In the light of these facts the Commission does not consider that  
this period of time was unreasonable or discloses periods of inactivity  
of the Supreme Court which in the circumstances are unacceptable.

Following the referral of the case to the Water Court of Appeal  
it obtained new observations from the parties, held an oral hearing and  
pronounced judgment all within a period of seven months (until  
14 October 1988). This cannot give rise to any criticism either.

The final proceedings before the Supreme Court lasted from  
4 November 1988 until 18 December 1990, i.e. two years and one month.  
Leave to appeal in respect of certain issues was granted on  
5 December 1989 before which the applicant requested, and was granted  
five extensions of the time-limits fixed. Furthermore, during the  
subsequent proceedings before the Supreme Court the applicant on  
several occasions refused to comply with the time-limits fixed and  
maintained her view that the proceedings should be suspended. In these  
circumstances the Commission finds that any delay during this period  
is attributable to the conduct of the applicant.

In its overall assessment the Commission recalls that the  
proceedings lasted approximately nine years and two months which,  
having regard to the importance of administering justice without  
delays, as such may appear excessive. Furthermore, the Commission has  
also noted the fact that a certain delay was caused by the fact that  
the Supreme Court quashed the first judgment of the Water Court of  
Appeal due to procedural errors committed by that court. However,  
delays caused by such incidents must be seen in the light of the  
necessity of securing to everyone a fair hearing which is one of the  
fundamental elements in the administration of justice under Article 6  
(Art. 6) of the Convention, and in this case it has been established  
that the Water Court of Appeal expeditiously proceeded with the case.

In these circumstances, and given that the proceedings comprised  
five instances and that the applicant's conduct caused considerable  
delay, the Commission finds that the total period of time was not so  
long as to warrant the conclusion that it was unreasonable.  
Consequently, this part of the application is manifestly ill-founded  
within the meaning of Article 27 para. 2 (Art. 27-2) of the Convention.

**3.** As regards the applicant's complaints under Articles 8 and 17  
(Art. 8, 17) of the Convention and Article 1 of Protocol No. 1  
(P1-1) to the Convention the Commission has examined these issues as  
submitted by her. However, this examination has not disclosed any  
appearance of a violation of these provisions.

It follows that this part of the application is also manifestly  
ill-founded within the meaning of Article 27 para. 2 (Art. 27-2) of the  
Convention.

**4.** Finally, the applicant complained in her written observations  
submitted on 17 December 1993 that she did not have, under Swedish law,  
an effective remedy at her disposal in respect of the complaint  
concerning the length of the proceedings. She referred in this respect  
to Article 13 (Art. 13) of the Convention.

However, the Commission is not required to decide whether or not  
the facts alleged by the applicant disclose any appearance of a  
violation of this provision, as Article 26 (Art. 26) of the Convention  
provides that the Commission "may only deal with the matter ... within  
a period of six months from the date on which the final decision was  
taken".

In the present case the Commission recalls that the proceedings  
in question came to an end on 18 December 1990 when the Supreme Court  
refused to grant leave to appeal and the Commission considers this was  
the final decision regarding the subject of this particular complaint.  
The complaint in question, however, was not submitted to the Commission  
until 17 December 1993, that is, more than six months after the date  
of this decision. Furthermore, an examination of the case does not  
disclose the existence of any special circumstances which might have  
interrupted or suspended the running of that period.

It follows that this part of the application has been introduced  
out of time and must be rejected under Article 27 para. 3 (Art. 27-3)  
of the Convention.

## For these reasons, the Commission by a majority

## DECLARES THE APPLICATION INADMISSIBLE.

Secretary to the Second Chamber  Acting President of the Second Chamber

## (K. ROGGE)                             (G.H. THUNE)

