# Europakommissionens beslut den 16 oktober 1995 i målet ALLAN JACOBSSON mot Sverige (nr 16970/90)

- Rubrik i HUDOC: ALLAN JACOBSSON v. SWEDEN
- Slag: Europakommissionens beslut · språk: engelska · datum: 1995-10-16
- Ansökningsnummer: 16970/90
- ECLI: ECLI:CE:ECHR:1995:1016DEC001697090
- Artiklar (HUDOC): 6, 6-1, P1-1, P1-1-1
- Slutsats (HUDOC): Partly admissible;Partly inadmissible
- Källa: Europadomstolen (HUDOC), © ECHR-CEDH: https://hudoc.echr.coe.int/eng?i=001-2313
- Ratio Lex: https://ratiolex.se/internationell-ratt/europadomstolen/001-2313/

Elektronisk version. Den undertecknade texten i domstolens arkiv är den autentiska (art. 44.3 EKMR).

## AS TO THE ADMISSIBILITY OF

Application No. 16970/90  
by Allan JACOBSSON  
against Sweden

The European Commission of Human Rights sitting in private on  
16 October 1995, the following members being present:

MM.   S. TRECHSEL, President  
H. DANELIUS  
C.L. ROZAKIS  
E. BUSUTTIL  
A.S. GÖZÜBÜYÜK  
A. WEITZEL  
J.-C. SOYER  
H.G. SCHERMERS  
Mrs.  G.H. THUNE  
Mr.   F. MARTINEZ  
Mrs.  J. LIDDY  
MM.   L. LOUCAIDES  
J.-C. GEUS  
M.P. PELLONPÄÄ  
G.B. REFFI  
M.A. NOWICKI  
I. CABRAL BARRETO  
B. CONFORTI  
N. BRATZA  
I. BÉKÉS  
J. MUCHA  
E. KONSTANTINOV  
G. RESS  
A. PERENIC  
C. BÎRSAN  
P. LORENZEN  
K. HERNDL

Mr.   H.C. KRÜGER, Secretary to the Commission

Having regard to Article 25 of the Convention for the Protection  
of Human Rights and Fundamental Freedoms;

Having regard to the application introduced on 21 July 1990 by  
Allan JACOBSSON against Sweden and registered on 2 August 1990 under  
file No. 16970/90;

Having regard to the report provided for in Rule 47 of the Rules  
of Procedure of the Commission;

Having regard to the observations submitted by the respondent  
Government on 30 August 1993 and 3 January 1995 the observations  
submitted in reply by the applicant on 15 November 1993 and  
14 February 1995;

Having deliberated;

Decides as follows:

## THE FACTS

The facts of the case, as submitted by the parties, may be  
summarised as follows.

The applicant is a Swedish citizen, born in 1927. He is retired  
and resides at Rönninge, Sweden.

A.    The particular circumstances of the case

In 1974 the applicant bought a property of 2,644 m2, Salem 23:1,  
in the centre of Rönninge in the municipality of Salem, a suburb about  
20 kilometres south-west of Stockholm. On the property there is a  
one-family house in which the applicant lives.

When the applicant bought the property it was covered by a  
so-called subdivision plan (avstyckningsplan), adopted in 1938.  
According to this plan no building could be constructed on a plot of  
less than 1,500 m2 until sufficient water and sewage facilities had  
been provided for. Such facilities appear to have been built at the end  
of the 1960's. The property was also covered by an area plan  
(områdesplan), adopted in 1972, which described the property mainly as  
a public area containing open spaces, streets and car parking, and by  
a building prohibition pursuant to section 35 of the previous Building  
Act (byggnadslagen) of 1947, issued on 26 August 1974.

The first building prohibition under the Building Act of 1947 was  
issued by the County Administrative Board (länsstyrelsen, hereinafter  
"the Board") of the Stockholm County already in September 1965 and was  
valid for one year. This prohibition was subsequently prolonged by the  
Board for one or two years each time. The last decision was taken on  
11 July 1985 and was valid until 11 July 1987. On 1 July 1987, with the  
entry into force of the Planning and Building Act of 1987 (Plan- och  
bygglagen, hereinafter "the 1987 Act"), the existing system for  
prohibition on construction was abolished and replaced by a possibility  
for the Building Committee (byggnadsnämnden) to defer its decision on  
an application for a building permit, or a preliminary opinion on that  
issue, for a maximum period of two years.

Ever since he bought the property in question the applicant has  
tried, in vain, to obtain from the competent authorities a permit to  
divide his plot and/or to build, in addition to the existing house,  
more houses on it. On 28 July 1975 the Building Committee of Botkyrka  
stated in a preliminary opinion, requested by the applicant, that it  
was not prepared to permit the division of his property into smaller  
plots, referring inter alia to the area plan adopted in 1972.

On 28 June 1979 the Municipal Assembly (kommunfullmäktige)  
adopted a master plan (generalplan) relating to part of the  
municipality of Botkyrka, according to which the applicant's property  
was supposed to be used for building blocks of flats of more than two  
storeys. On 15 January 1980 the Building Committee stated, in reply to  
a request from the applicant, that accordingly it was not prepared to  
grant him an exemption from the building prohibition or a permit to  
build a one-family house and a garage on the property. The applicant  
appealed to the Board claiming that the building prohibition was not  
valid. The Board rejected the appeal on 25 April 1980, stating inter  
alia that in its opinion the proposed buildings could be contrary to  
the aim of the prevailing prohibition and hinder future town planning  
as indicated in the master plan of 1979.

On 13 February 1984 the Municipal Council (kommunstyrelsen)  
adopted an area programme according to which the area in which the  
applicant's property is situated should be used for the construction  
of multi-family houses in 1988. It also stated that the planning  
procedure should be given priority. On 23 February 1984 the Municipal  
Assembly adopted a building programme to the same effect.

On 12 June 1984 the Building Committee stated in a new  
preliminary opinion requested by the applicant that it would not be  
prepared to grant any building permit in view of the existing building  
prohibition. The applicant's appeals against this were, as before,  
unsuccessful.

On 20 March 1986 the Municipal Assembly adopted a new area plan  
covering inter alia the applicant's property. This plan mentioned the  
possibility of using the area for single or multi-family house  
development.

On the basis of these facts the applicant lodged an application  
with the Commission (No. 10842/84) alleging violations of inter alia  
Article 6 of the Convention and Article 1 of Protocol No. 1 to the  
Convention. In its Report of 8 October 1987 the Commission expressed  
the unanimous opinion that there had been a violation of Article 6  
para. 1 of the Convention as a result of the lack of any court remedy  
to challenge the lawfulness and the compatibility with the Convention  
of the building prohibitions imposed on his property. It also reached  
the conclusion, by seven votes to four, that there had been no  
violation of Article 1 of Protocol No. 1 to the Convention. The  
Commission's view was subsequently upheld by the European Court of  
Human Rights (Eur. Court H.R., Allan Jacobsson judgment of  
25 October 1989, Series A no. 163).

While his case was pending before the Commission and the Court,  
and following the entry into force of the 1987 Act, the applicant filed  
a request with the Building Committee on 9 July 1987 for a preliminary  
opinion regarding a building permit for his property in order to build  
a house thereon. On 13 October 1987 the Building Committee decided,  
however, pursuant to the rules laid down in the 1987 Act, to defer its  
decision on the request for a period of two years. It nevertheless  
informed the applicant that a building permit could not be expected for  
the time being. Before the end of the above two year period the  
Municipal Assembly of the Municipality of Salem decided, on  
21 June 1989, to revoke the detailed development plan (previously  
called a subdivision plan) which had been in force since 1938.  
Following this the Building Committee decided, on 11 September 1990,  
to confirm its preliminary opinion of 13 October 1987 rejecting the  
applicant's request for a building permit. In its reasons the Committee  
referred to the need for a new detailed development plan and the  
Municipality's intention to plan the land for single or multi-family  
house development in accordance with the area plan adopted in 1986. The  
applicant did not appeal against this decision.

In the meantime the applicant had, however, lodged an appeal with  
the Administrative Court of Appeal (kammarrätten) against the decision  
of the Municipal Assembly of 21 June 1989 to revoke the detailed  
development plan from 1938. On 6 July 1989 the Court decided not to  
entertain the appeal as it had no competence to do so since such an  
appeal, in accordance with the 1987 Act, was to be examined by the  
County Administrative Board. Leave to appeal against this decision was  
refused by the Supreme Administrative Court (Regeringsrätten) on  
20 September 1989.

Following the above decision of the Administrative Court of  
Appeal the applicant lodged his appeal with the Board. He maintained  
in particular that the authorities were under an obligation, pursuant  
to Chapter 1, section 5, of the 1987 Act, to take into consideration  
both private and public interests and thus weigh the loss of the rights  
created by the old detailed development plan against the public  
interest in adopting a new detailed development plan.

On 7 September 1989 the Board rejected the appeal and upheld the  
decision of the Municipal Assembly to revoke the detailed development  
plan of 1938. In its decision the Board stated:

(translation)

"The area is covered by a detailed development plan,  
approved by the County Administrative Board on 16 September  
1938. Pursuant to Chapter 17, section 4, of the 1987 Act  
the implementation period for the plan is to be considered  
as having elapsed.

In such circumstances the municipality has a strong  
position in respect of the right to revoke a detailed  
development plan, something which has been exemplified by  
the fact that the revocation may be decided without the  
rights which derived from the plan being taken into  
consideration (chapter 5, section 11, subsection 2, of the  
1987 Act). This presupposes that the general interest  
speaks in favour of a revocation. Such a general interest  
has been expressed by the issuing of an area plan for Östra  
Rönninge.

When examining questions under the 1987 Act both public and  
individual interests must be taken into consideration  
unless otherwise provided. The above provision is an  
example thereof. The meaning of this provision is that the  
person who has obtained a right according to the plan  
cannot rely thereon during the examination of the question  
whether the plan should be repealed. However, when it comes  
to examining the contents of a new plan the main rule in  
Chapter 1, section 5, concerning the individual's interests  
must obviously be considered, but even in these  
circumstances it is not required that the rights under the  
old plan must be respected. When it comes to adopting a new  
plan it would not be contrary to the 1987 Act to let the  
adoption thereof be preceded by the revocation of a  
detailed development plan. The possible result of an  
examination of a request for a building permit in respect  
of a new construction on Salem 2[3]:1 following the  
revocation of the detailed development plan cannot be  
examined in this case. The applicant's submissions in  
support of his appeal do not provide a reason for refusing  
the implementation of the decision appealed against."

The applicant appealed against this decision to the Government.  
On 14 June 1990 the Government rejected the appeal stating that they  
shared the assessment made by the County Administrative Board.

In accordance with the provisions of the 1988 Act on Judicial  
Review of Certain Administrative Decisions (Lag 1988:205 om  
rättsprövning av vissa förvaltningsbeslut, hereinafter "the 1988 Act")  
the applicant challenged the Government's decision in the Supreme  
Administrative Court. He also requested the Court to examine a request  
for a building permit and to hold an oral hearing.

On 11 November 1990 the Supreme Administrative Court, without  
holding an oral hearing, rejected the applicant's request for review  
of the Government's decision. In its decision the Court stated:

(translation)

"According to section 1 of the 1988 Act the Supreme  
Administrative Court shall, at the request of a private  
party in certain administrative matters dealt with by the  
Government or an administrative authority, examine whether  
the decision is contrary to any legal provision.

In the present case the examination concerns the  
Government's decision of 14 June 1990. In this decision the  
Government rejected an appeal lodged by (the applicant)  
against a decision of the County Administrative Board of  
Stockholm to uphold a decision to revoke (the 1938 detailed  
development plan) concerning a land area within the  
Municipality of Salem. This means that the Supreme  
Administrative Court cannot in the present proceedings  
examine (the applicant's) request to be granted a building  
permit. The Supreme Administrative Court dismisses this  
request and rejects the request for a public oral hearing.

As regards the question whether the revocation of (the old  
1938 plan) is contrary to any legal provision, it can be  
established that the plan, according to Chapter 17,  
section 4, of the 1987 Act, was to be regarded as a  
detailed development plan with regard to which the  
implementation period had elapsed. According to Chapter 5,  
section 11, of the 1987 Act such a plan may be amended or  
annulled without regard to the rights which may have  
accrued during the plan's existence. The latter provision  
constitutes an exception to the principal rule in  
Chapter 1, section 5, of the 1987 Act that consideration  
shall be given to both public and private interests when  
examining issues under the 1987 Act (cf. Government Bill  
1985/86:1 pp. 175 and 464). The facts of the case do not  
indicate that the revocation of the plan is contrary to  
Chapter 5, section 11, or Chapter 1, section 5, of the 1987  
Act or to any other provision in the law. The decision is  
upheld."

B.    Relevant domestic law

a.    The Planning and Building Act which entered into force on  
1 July 1987 contains regulations about the planning of land and water  
areas as well as building. According to Chapter 1, section 1, "... the  
purpose of these regulations is, with due regard to the freedom of the  
individual, to promote a development of the society characterised by  
equal and good living conditions for people today and for future  
generations ...".

The provisions of the 1987 Act which have been invoked in the  
present case read as follows:

(translation)

Chapter 1

Section 5. When issues are examined in accordance with this  
Act, consideration shall be given to both public and  
private interests unless otherwise prescribed.

Chapter 5

Section 11. Before the expiry of the implementation period  
a detailed development plan may only be amended or annulled  
contrary to the wishes of the property owners concerned  
when this is required as a result of new conditions of  
great public importance and which could not be foreseen  
when the plan was drawn up.

When the implementation period has elapsed, the plan may be  
amended or annulled without regard to the rights which may  
have accrued during the plan's existence ...

Chapter 17

Section 4. Town development plans and rural development  
plans adopted under the Building Act (1947:385) or the Town  
Planning Act (1931:142), older types of plans and  
regulations referred to in sections 79 and 83 of the latter  
act as well as subdivision plans, which are not covered by  
a directive issued in accordance with section 168 of the  
Building Act, shall be regarded as a detailed development  
plan in accordance with this Act. Subdivision plans, to the  
extent they are covered by the above-mentioned directives,  
will cease to be valid with the coming into force of this  
Act.

With regard to town development plans and rural development  
plans which have been adopted before the end of 1978, the  
implementation period will be considered, in accordance  
with section 5, subsection 5, to be five years from the  
date of their gaining legal force. For other plans and  
regulations, referred to in the first subsection, the  
implementation period will be regarded as having elapsed.

Unless otherwise prescribed in a plan or regulation, which  
according to the first subsection is to be regarded as a  
detailed development plan in accordance with this Act,  
section 39 in the Building Ordinance (1959:612) shall apply  
as a regulation in the plan.

Section 8. If damage occurs as a result of a plan or  
regulation whose implementation period in accordance with  
section 4 has elapsed, being amended or annulled, the owner  
and holder of special rights to a property is entitled  
to compensation from the municipality on condition that

**1.** the property is located in an area which is  
developed predominantly in accordance with the plan or area  
regulations,

**2.** notice about the decision regarding the amendment  
or annulment of the plan or regulations is given before the  
end of June 1992, and

**3.** the property after such amendment or annulment may  
either not be built upon or only be used for development to  
an extent which is obviously unreasonable.

If the plan or regulation is amended or annulled before the  
end of June 1992, then the first subsection will apply if  
an application has been made for a building permit but the  
application has not been dealt with before the  
above-mentioned date.

Compensation shall be calculated as the difference between  
the property's market value before and after the decision  
to amend or annul the plan. The property's market value  
before the decision shall be calculated with regard to  
planning conditions as well as the current compensation  
principles at the time of the coming into force of this  
Act. If the municipality so demands, however, the value may  
not be set at a higher amount than included in the  
regulations of section 36 of the Municipal Taxation Act  
(1928:370) in their formulation in June 1990, and this  
value may be deducted when calculating the capital gain  
from the sale of a property by 31 December 1990, adjusted  
with the percentage by which the basic value according to  
the General Insurance Act (1962:381) has been changed by  
the date of the sale.

Claims for compensation in accordance with the first  
subsection shall be submitted within two years from the  
date of the decision, which is being appealed against,  
gaining legal force. If the property owner or the holder of  
special rights to a property has submitted a claim and is  
entitled to compensation, the municipality may instead  
acquire the property or the right."

b.    The 1988 Act on Judicial Review of Certain Administrative  
Decisions was introduced as a result of the European Court of Human  
Rights' findings in several cases, notably against Sweden, that lack  
of judicial review of certain administrative decisions infringed  
Article 6 para. 1 of the Convention. It was enacted as a temporary law  
to remain in force until 1991; its validity has subsequently been  
extended.

Pursuant to section 1 of this Act, a person who has been a party  
to administrative proceedings before the Government or another public  
authority may, in the absence of any other remedy, apply to the Supreme  
Administrative Court, as the first and only court, for review of any  
decisions in the case which involve the exercise of public authority  
vis-à-vis a private individual. The kinds of administrative decisions  
covered by the Act are further defined in Chapter 8, sections 2 and 3  
of the Instrument of Government (Regeringsformen), to which section 1  
of the 1988 Act refers. Section 2 of the Act specifies several types  
of decisions which fall outside its scope, none of which is relevant  
in the instant case.

In proceedings brought under the 1988 Act, the Supreme  
Administrative Court examines whether the contested decision "conflicts  
with any legal rule" (section 1 of the 1988 Act). According to the  
preparatory work to the Act, as reproduced in Government Bill  
1987/88:69 (pp. 23-24), its review of the merits of cases concerns  
essentially questions of law but may, in so far as relevant for the  
application of the law, extend also to factual issues; it must also  
consider whether there are any procedural errors which may have  
affected the outcome of the case.

If the Supreme Administrative Court finds that the impugned  
decision is unlawful, it must quash it and, where necessary, refer the  
case back to the relevant administrative authority.

c.    The procedure before the Supreme Administrative Court is governed  
by the Administrative Procedure Act of 1971 (förvaltningsprocesslagen).  
It is in principle a written procedure, but the Supreme Administrative  
Court may decide to hold an oral hearing on specific matters if this  
is likely to assist it in its examination of the case or to expedite  
the proceedings (section 9).

## COMPLAINTS

The applicant complains that the decision to revoke the detailed  
development plan of 1938 could not be brought before a court as  
required by Article 6 para. 1 of the Convention. He furthermore  
maintains that the review offered by the Supreme Administrative Court  
under the 1988 Act did not meet the requirements of this provision.

The applicant also complains that the revocation of the detailed  
development plan of 1938 amounts to a violation of the rights secured  
to him under Article 1 of Protocol No. 1 to the Convention.

## PROCEEDINGS BEFORE THE COMMISSION

The application was introduced on 21 July 1990 and registered on  
2 August 1990.

On 29 March 1993 the Commission decided to bring the application  
to the notice of the respondent Government and to invite them to submit  
written observations on its admissibility and merits.

After an extension of the time-limit the Government's  
observations were submitted on 30 August 1993. The applicant's  
observations in reply were submitted on 15 November 1993, also  
following an extension of the time-limit fixed for that purpose.

On 28 November 1994 the Commission decided to obtain from the  
parties further observations on the admissibility and merits of the  
application.

The Government's further observations were submitted on  
3 January 1995 and the applicant's further observations in reply were  
submitted on 14 February 1995.

## THE LAW

1.    The applicant complains of matters which relate to questions of  
access to court and peaceful enjoyment of his possessions which  
were also at issue in his previous application. However, the Commission  
notes that his present application concerns a period of time which  
differs from the one covered by the European Court of Human Rights'  
judgment of 25 October 1989. It follows that no issue arises under  
Article 27 para. 1 (b) (Art. 27-1-b) of the Convention.

2.    The applicant complains that, under Swedish law, he did not have  
access to a tribunal before which he could challenge the revocation  
of the detailed development plan of 1938. He furthermore complains that  
the review of this decision which he could obtain pursuant to the 1988  
Act did not fulfil the requirements of Article 6 (Art. 6) of the  
Convention according to which:

"In the determination of his civil rights and obligations  
... everyone is entitled to a ... public hearing by [a] ...  
tribunal ...".

The Commission recalls that in the present case Article 6  
(Art. 6) only applies in so far as the proceedings in question  
determine a civil right or obligation. The applicability of Article 6  
para. 1 (Art. 6-1) depends on whether there was a dispute over a  
"right" which can be said, at least on arguable grounds, to be  
recognised under domestic law, and, if so, whether this "right" was of  
a "civil" character within the meaning of Article 6 para. 1 (Art. 6-1).  
In particular, the dispute must be genuine and serious, it may relate  
not only to the actual existence of a right, but also to its scope and  
the manner of its exercise and, finally, the results of the proceedings  
concerning the dispute at issue must be directly decisive for such a  
right (see Eur. Court H.R., Allan Jacobsson judgment of 25 October  
1989, Series A no. 163, p. 19, paras. 66-67).

The Commission recalls that a dispute concerning the lawfulness  
of building plan amendments which would in effect revoke a land owner's  
conditional right under the old plan to build a second house on his  
property involves a determination of the owner's civil rights (see Eur.  
Court H.R., Mats Jacobsson judgment of 28 June 1990, Series A  
no. 180-A, pp. 12-14, paras. 32-34). Also a dispute concerning the  
lawfulness of a decision rejecting a request for a building permit as  
an exemption from a building plan involves a determination of civil  
rights, if the applicable national law provides for such an exemption  
(see Eur. Court H.R., Skärby judgment of 8 June 1990, Series A  
no. 180-B, pp. 36-38, paras. 28-29).

The Commission further recalls that it has previously held that  
a decision rejecting a request for amendment of an existing building  
plan does not involve a determination of civil rights (see  
No. 11844/85, Dec. 29.2.88, D.R. 55 p. 205). The Commission has also  
held that a dispute about an owner's use of land for purposes other  
than those listed in the relevant rules does not determine the owner's  
civil rights, but concerns the application of public law regulations  
to the permitted use of the land (see No. 10471/83, Dec. 9.12.85,  
D.R. 45 p. 113). Finally, in its Report in the Skärby case, the  
Commission considered the decision to refuse an exemption from the  
building plan not to be of the same kind as a decision not to amend the  
building plan (Skärby v. Sweden, Comm. Report 16.3.89, para. 82, Eur.  
Court H.R., Series A no. 180-B, p. 47).

From the above case-law it follows that civil rights within the  
meaning of Article 6 (Art. 6) of the Convention are involved where the  
applicant has, or could arguably be said to have, rights recognised  
under domestic law which are revoked or denied by the decisions of the  
authorities. In the present case the Commission recalls that the  
detailed development plan of 1938 allowed for construction on a plot  
of land less than 1,500 m2, if sufficient water and sewage facilities  
had been provided for. Such facilities were apparently provided for in  
the 1960's and it has never been argued that the applicant's plot does  
not fulfil these requirements. The applicant's attempts to construct  
on his land were, however, thwarted by continuing building prohibitions  
against which he unsuccessfully appealed on several occasions. From his  
previous application it is clear that in so far as the applicant  
complained about the effects of these building prohibitions this  
dispute concerned a civil right within the meaning of Article 6  
(Art. 6) of the Convention as this was a genuine dispute over a right  
to build on his property which he could arguably claim to have,  
provided he fulfilled certain other requirements. Accordingly,  
Article 6 (Art. 6) was applicable to those proceedings (cf. Allan  
Jacobsson judgment, mentioned above, pp. 20-21, paras. 66-74).

In the present case the Commission recalls that the applicant,  
on 9 July 1987, filed a new request with the Building Committee for a  
preliminary opinion regarding a building permit and that the Committee,  
on 11 September 1990, finally decided to reject the request. The  
applicant did not appeal against this decision. Instead he pursued an  
appeal against the revocation of the detailed development plan by the  
Municipal Assembly of 21 June 1989, a revocation which was upheld by  
the County Administrative Board on 7 September 1989, confirmed by the  
Government on 14 June 1990 and eventually by the Supreme Administrative  
Court on 11 November 1990.

The Commission considers that the dispute concerning the  
revocation of the detailed development plan in effect also had  
repercussions on the applicant's conditional right under this plan to  
build on his property. Thus the Commission finds that it involved a  
determination of his civil rights within the meaning of Article 6  
(Art. 6) of the Convention (mutatis mutandis the Mats Jacobsson  
judgment mentioned above). The Commission must accordingly consider  
whether the proceedings fulfilled the requirements of this provision.

a.    The applicant first complains that he could not bring the  
question of the revocation of the detailed development plan before a  
court. The Commission recalls, however, that the issue was eventually  
examined by the Supreme Administrative Court which pronounced judgment  
on 11 November 1990. It follows that this part of the application is  
manifestly ill-founded within the meaning of Article 27 para. 2  
(Art. 27-2) of the Convention.

b.    The applicant also complains that in any event the scope of  
review afforded by the Supreme Administrative Court under the 1988 Act  
was insufficient for the purposes of Article 6 para. 1 (Art. 6-1) of  
the Convention. In this respect the Commission recalls that the 1988  
Act provides for an appeal to the Supreme Administrative Court against  
administrative decisions involving exercise of public authority  
regarding a private individual or legal person in cases where no other  
judicial remedy is available. The scope of the Act is defined by  
reference to certain provisions in the Instrument of Government, and  
some enumerated categories of decisions are excluded from the  
application of the Act.

The examination by the Supreme Administrative Court under the  
1988 Act is in principle limited to the question whether the challenged  
decision is in conflict with any legal rule and according to the  
travaux préparatoires the examination shall concentrate on the  
lawfulness of the challenged decision. However, the Commission recalls  
that the competence of the Supreme Administrative Court is not limited  
to an examination of how the law has been applied but may include a  
re-examination of the facts upon which the application of the law was  
based. The Supreme Administrative Court shall also examine whether  
fundamental legal principles such as objectivity, impartiality and  
equality before the law have been respected. Moreover, the Supreme  
Administrative Court shall examine whether there have been any  
procedural errors which may have affected the outcome of the case.

Furthermore, confining itself as far as possible to examining the  
question raised by the case before it the Commission has found no  
evidence which could lead to the conclusion that the Supreme  
Administrative Court in examining the complaints, as submitted by the  
applicant, had to decline jurisdiction in replying to them or in  
ascertaining the various facts.

In these circumstances the Commission finds that the review  
available to the applicant in the instant case fulfilled, as to its  
scope, the requirements of Article 6 para. 1 (Art. 6-1) of the  
Convention (cf. also No. 18660/91, Dec. 7.12.94, D.R. 79-A p. 11).

It follows that this part of the application is also manifestly  
ill-founded within the meaning of Article 27 para. 2 (Art. 27-2) of the  
Convention.

c.    Finally, as regards the review offered by the Supreme  
Administrative Court the applicant complains of the fact that the Court  
refused his request for an oral hearing.

The Commission has taken cognizance of both parties' submissions  
on this point. After a preliminary examination thereof the Commission  
has reached the conclusion that it raises a serious issue as to the  
interpretation and application of Article 6 (Art. 6) of the Convention  
and that this issue can only be determined after a full examination of  
its merits. It follows that this part of the application cannot be  
regarded as manifestly ill-founded within the meaning of Article 27  
para. 2 (Art. 27-2) of the Convention. No other ground for declaring  
it inadmissible has been established.

3.    The applicant also complains that the revocation of the plan  
amounts to a violation of his right to peaceful enjoyment of his  
possessions. He invokes in this respect Article 1 of Protocol No. 1  
(P1-1) to the Convention which reads:

"Every natural or legal person is entitled to the peaceful  
enjoyment of his possessions.  No one shall be deprived of  
his possessions except in the public interest and subject  
to the conditions provided for by law and by the general  
principles of international law.

The preceding provisions shall not, however, in any way  
impair the right of a State to enforce such laws as it  
deems necessary to control the use of property in  
accordance with the general interest or to secure the  
payment of taxes or other contributions or penalties."

The Government contend, which is contested by the applicant, that  
in so far as his reference to the above provision relates to the fact  
that he has not been granted a building permit, he has not exhausted  
the domestic remedies available to him since he did not lodge an appeal  
against the Building Committee's decision of 11 September 1990 with the  
County Administrative Board and, if necessary, with the Government.  
Furthermore, they maintain that the complaint is in any event  
manifestly ill-founded.

The Commission recalls that, under Article 26 (Art. 26) of the  
Convention, it may only deal with a matter after all domestic remedies  
have been exhausted according to the generally recognised rules of  
international law. It is true that in the present case the applicant  
applied for a preliminary opinion regarding a building permit on 9 July  
1987, that the Building Committee eventually on 11 September 1990  
refused to grant such a permit and that the applicant did not appeal  
against this decision. In these circumstances the Commission agrees  
with the Government that the applicant cannot be considered as having  
complied with the condition as to exhaustion of domestic remedies in  
respect of his possibilities of obtaining a building permit and such  
a complaint would have to be rejected under Article 27 para. 3  
(Art. 27-3) of the Convention.

However, the Commission considers that the applicant's complaint  
under Article 1 of Protocol No. 1 (P1-1) also relates to the fact that  
the Swedish authorities decided to revoke the detailed development plan  
of 1938. In respect of this the applicant did comply with the condition  
as to the exhaustion of domestic remedies as he not only obtained a  
decision from the Government but also had the matter examined by the  
Supreme Administrative Court pursuant to the 1988 Act. The Commission  
cannot, therefore, reject this part of the application for  
non-compliance with the exhaustion rule.

The Commission recalls that when the applicant bought his  
property it was subject to a building prohibition which was prolonged  
on several occasions. Under Swedish law he had a right to build on his  
property provided the intended construction would not run counter to  
any confirmed plan, regulation, or building prohibition. Thus, the  
effect of the building prohibition was the suspension of the  
conditional right to build which the applicant otherwise had. From the  
applicant's previous case the Commission recalls that the building  
prohibition, which had been in force for more than twenty years, did  
not violate his rights under Article 1 of Protocol No. 1 (P1-1) to the  
Convention as this was not considered to be disproportionate to the  
requirements of the authorities' legitimate aim of planning for the  
area (cf. the Allan Jacobsson judgment mentioned above, pp. 17-19,  
paras. 56-64).

The Commission finds that the revocation of the 1938 detailed  
development plan did not change or alter this situation in any  
particular way. Neither before nor after the revocation did the  
applicant have an unconditional right to build on his property and, as  
before, the possibility exists for the applicant to apply for a  
building permit should he so wish. As mentioned above he in fact  
commenced proceedings to this effect, but decided not to pursue the  
matter.

The Commission further recalls that there has been a house on the  
applicant's property since he bought it. He has not been under any  
constraint to sell his property. It is true that the on-going planning  
procedure has left the applicant in uncertainty as to the further  
development of the area in which his property is situated. However, in  
part this uncertainty already existed when the applicant bought the  
property. Moreover, any possible expropriation of the property in the  
future would be subject to provisions of law and guarantees of  
compensation. In these circumstances the Commission considers that the  
applicant has been able to use his property in the way which he could  
reasonably expect when he bought it. It considers, in view of the wide  
margin of appreciation enjoyed by the Contacting States in the area of  
regulation of detailed town planning, that the revocation of a plan to  
this effect cannot be considered to be disproportionate to the  
authorities' legitimate aims.

The Commission therefore finds that the interference with the  
applicant's right to peaceful enjoyment of his possessions was  
justified under the terms of the second paragraph of Article 1 of  
Protocol No. 1 (P1-1).

It follows that this part of the application is manifestly  
ill-founded within the meaning of Article 27 para. 2 (Art. 27-2) of the  
Convention.

## For these reasons, the Commission, unanimously,

DECLARES ADMISSIBLE, without prejudging the merits, the  
complaint, under Article 6 (Art. 6) of the Convention, of the  
lack of an oral hearing in the Supreme Administrative Court, and

DECLARES INADMISSIBLE the remainder of the application.

Secretary to the Commission            President of the Commission

## (H.C. KRÜGER)                          (S. TRECHSEL)