# Europakommissionens beslut den 27 november 1996 i målet BIELECTRIC Srl. AND BIONDI mot Italien (nr 28598/95)

- Rubrik i HUDOC: BIELECTRIC Srl. AND BIONDI v. ITALY
- Slag: Europakommissionens beslut · språk: engelska · datum: 1996-11-27
- Ansökningsnummer: 28598/95
- ECLI: ECLI:CE:ECHR:1996:1127DEC002859895
- Artiklar (HUDOC): P1-1, 6, 6-1, 34
- Slutsats (HUDOC): Inadmissible
- Källa: Europadomstolen (HUDOC), © ECHR-CEDH: https://hudoc.echr.coe.int/eng?i=001-3407
- Ratio Lex: https://ratiolex.se/internationell-ratt/europadomstolen/001-3407/

Elektronisk version. Den undertecknade texten i domstolens arkiv är den autentiska (art. 44.3 EKMR).

## AS TO THE ADMISSIBILITY OF

Application No. 28598/95  
by BIELECTRIC Srl and Antonio BIONDI  
against Italy

The European Commission of Human Rights (First Chamber) sitting  
in private on 27 November 1996, the following members being present:

Mrs   J. LIDDY, President  
MM.   M.P. PELLONPÄÄ  
E. BUSUTTIL  
A. WEITZEL  
L. LOUCAIDES  
B. CONFORTI  
N. BRATZA  
I. BÉKÉS  
G. RESS  
A. PERENIC  
C. BÎRSAN  
K. HERNDL  
M. VILA AMIGÓ

Mrs   M.F. BUQUICCHIO, Secretary to the Chamber

Having regard to Article 25 of the Convention for the Protection  
of Human Rights and Fundamental Freedoms;

Having regard to the application introduced on 26 June 1995 by  
BIELECTRIC Srl and Antonio BIONDI against Italy and registered on  
19 September 1995 under file No. 28598/95;

Having regard to the report provided for in Rule 47 of the Rules  
of Procedure of the Commission;

Having deliberated;

Decides as follows:

## THE FACTS

The applicant company, having its registered office in  
Ospedaletto (Pisa) and acting through the applicant, who is its legal  
representative and managing director, has been in liquidation since  
29 May 1995.

The facts of the case, as submitted by the applicants, may be  
summarised as follows.

a)   Particular circumstances of the case

In 1983, the applicant company commissioned company X to build  
a 1400 m sq. factory building in Ospedaletto (Pisa).

On 4 April and 20 June 1986, the managing director of the  
applicant company - the second applicant - acting in the capacity of  
director of the construction works ("direttore dei lavori"), reported  
to the Construction Office ("Genio Civile") that the executive plans  
("disegni esecutivi") were lacking and that some construction errors  
were being committed.

On 5 September 1986, company X filed with the competent  
authorities the final report on the construction ("relazione di fine  
lavori").

On 1 November 1986, the applicant reported to the Construction  
Office the existence of certain defects in the structure of the shed  
and requested that they inspect the shed.

On 11 December 1986, the applicant filed with the Construction  
Office another report on the construction, in which he pointed out the  
existence of certain defects in the structure.

On 23 December 1986, the Pisa Fire Brigade inspected the shed and  
reported to the Pisa Town Council that its structure presented certain  
important construction errors.

On 24 January 1987, the Construction Office inspected the shed  
and established the existence of certain defects in its structure. It  
held that the importance of such defects was to be ascertained through  
further practical tests for which it was not itself competent.

On 27 January 1987, the Pisa Town Council declared that the shed  
was dangerous and unfit for use ("inagibile") and therefore warned the  
applicant company not to continue the works on the shed until the  
errors were rectified.

On 27 May 1988, the person in charge of the test ("collaudo  
statico") informed company X that he could not proceed with the test  
as the executive plans had not been duly filed with the Construction  
Office.

On 30  March 1989, the applicant filed a criminal complaint  
against the managing director of company X for fraud and for filing  
defective executive plans in breach of the relevant anti-seismic  
legislation.

On 27 March 1991, the person in charge of the test informed the  
applicant company that X had not yet submitted the requested drawings  
and that he could not therefore proceed with the test.

As a consequence of the lack of final testing, according to  
Article 8 of Law 1086/71 no certificate of fitness for occupation  
("licenza di abitabilità") could be issued by the Pisa Town Council.

On 20 June 1991 the Chief Engineer of the Construction Office  
declared to the Public Prosecutor that the factory shed presented  
certain defects, but that there was no clear violation of the anti-  
seismic regulations and that there was no actual danger for public  
safety.

On 23 June 1992 the Chief Engineer of the Construction Office  
reported to the Public Prosecutor that all the necessary documents  
concerning the construction of the factory shed had been filed with the  
Construction Office.

On 23 February 1993, the criminal complaint of 30 March 1989 was  
not pursued by the Pisa Judge for Preliminary Investigations, who held  
that the conduct of the managing director of company X did not amount  
to fraud but simply to a breach of contract, and that in any event the  
offence under the anti-seismic legislation was time-barred and  
extinguished by an amnesty.

On 1 March 1993 the Chief Engineer of the Construction Office,  
on the initiative of Regional Council of Tuscany, filed a criminal  
complaint against the planner of company X for violations of the  
relevant anti-seismic legislation, in particular for not filing all the  
necessary documents concerning the construction of the factory shed.  
On 4 November 1993 this complaint was dismissed by the Pisa Judge for  
Preliminary Investigations as being time-barred.

On 25 May 1993, the applicant filed with the Pisa Public  
Prosecutor a criminal complaint against the Chief Engineer of the  
Construction Office for giving false information to the Public  
Prosecutor on 20 June 1991 and 23 June 1992 and neglect of duty  
("omissione d'atti d'ufficio"). By a decision of 13 April 1994, the  
judge for Preliminary Investigations dismissed the complaints  
concerning the false information of 20 June 1991 and the neglect of  
duty, and fixed a hearing for 9 May 1994 for the third complaint (false  
information of 23 June 1992). After the hearing, by a decision of  
19 October 1994 the Judge for Preliminary Investigations dismissed the  
remainder of the complaint.

In the meantime, on 28 July 1993 the President of the Regional  
Council of Tuscany informed the press of having filed a criminal  
complaint against the applicant for insult ("oltraggio").

As a consequence of the dismissals of 23 February 1993 and  
4 November 1993, pursuant to Article 25 of Law 64/74 competence to  
issue directions as to the compliance of the construction works with  
the relevant legislation passed from the Judge for Preliminary  
Investigations to the President of the Regional Council of Tuscany (see  
below).

By a decree of 6 October 1994 the President of the Regional  
Council of Tuscany ordered the applicant company and company X to file  
certain documents concerning the construction of the shed with the  
Construction Office within thirty days of the order itself.

On 19 December 1994 the Pisa Construction Office informed the  
President of the Regional Council that company X had filed certain  
documents.

On 13 March 1995 the Pisa Town Council, after inspecting the  
factory building on 9 March 1995, ascertained that certain executive  
plans had not been deposited and that the structure presented important  
differences from the original plans. It concluded that the factory  
building was not in accordance with law 1086/71 and informed the  
applicant company, the President of the Regional Council of Tuscany and  
the Construction Office as well as the Prefect and the Magistrate  
accordingly.

On 20 March 1995 the President of the Regional Council  
acknowledged that his previous order of 6 October 1994 had been  
complied with.

On 16 May 1995 the Pisa Town Council reiterated that the factory  
building was not in accordance with law 1086/71.

The applicant filed a criminal complaint against the President  
of the Regional Council of Tuscany with the Florence Public Prosecutor.

By decision of 11 September 1995, the Florence Judge for  
Preliminary Investigations dismissed the complaint and held that the  
President of the Regional Council had fulfilled his legal obligations  
and that the decree of 6 October 1994 had made it possible to proceed  
with the testing of the factory building.

The applicant applied to the Pisa Town Council seeking the  
withdrawal of the order not to pursue any construction activity on the  
factory building. However, by a letter of 6 February 1996, the Pisa  
Town Council reiterated that the factory building as built was not in  
accordance with the original plans and that although the construction  
works had been completed, the final report on the construction and the  
report on the final test were still lacking.

The civil proceedings

On 9 April 1987, the applicant company summoned company X to  
appear before the Arezzo court, requesting that company X be ordered  
to carry out all the works and amendments necessary to bring the  
factory building into compliance with the law and the instructions  
given by the Pisa fire brigade in December 1986.

In a judgment of 4 October 1989, filed with the Registry on  
16 November 1989, the Arezzo court held that the building of the shed  
did not constitute a work under a contract ("appalto") but a sale, and  
that the factory building was in accordance with all the legal  
requirements, the alleged defects being merely aesthetic.

On 21 June 1990, the applicant company lodged an appeal against  
this judgment before the Florence Court of Appeal; the latter, in a  
judgment of 26 February 1993, filed with the Registry on 13 May 1993,  
held that the defects in the factory building were merely aesthetic and  
did not affect the structure.

On 12 May 1994, the applicant company lodged an appeal on points  
of law; the proceedings are still pending before the Court of  
Cassation.

b)   Relevant domestic law

According to the relevant legislation (Laws no. 1086/71 and  
no. 64/74 and Regional Law no. 88/82), all building plans must be filed  
with the Construction Office before beginning the construction works;  
as regards constructions in seismic areas, the Construction Office  
carries out sample controls of the substance of the plans.

Competence to monitor the compliance of the constructions with  
the relevant legislation is vested in the mayor, the police, and the  
technical staff of the town council. The police must immediately report  
any alleged violation to the Construction Office. The Mayor and the  
Chief Engineer of the Construction Office, after drafting a technical  
report on the alleged violation, must inform the competent Public  
Prosecutor thereof. Any violation of this legislation entails criminal  
liability; the criminal proceedings resulting from the report concern  
both the criminal liability and the bringing of the building into  
compliance with the law. The competence to issue directions as to the  
changes to be made on the building is vested in the Magistrate when the  
proceedings end with the finding of a violation of the law and the  
conviction of the person responsible for such violation, and in the  
mayor when the criminal charge related to the violation is dropped on  
grounds of an amnesty or as time-barred.

## COMPLAINTS

**1.** The applicant company mainly complains about the fact that,  
notwithstanding numerous criminal complaints and requests to various  
authorities, it has been impossible for it to bring its factory shed  
into compliance with the anti-seismic regulations and therefore to  
start its manufacturing activity. According to the applicant company,  
its problems reside in the conduct of the administrative authorities,  
namely in the inconsistency between the Pisa Town Council and the  
Regional Council of Tuscany, which seem not to agree on whether or not  
the factory shed complies with the relevant regulations and therefore  
frustrate the procedure which should lead to the determination of what  
must be done to bring the factory shed into compliance with the law.  
It complains in particular that various criminal complaints it had  
filed against, inter alia, the Chief Engineer of the Construction  
Office and the President of the Regional Council of Tuscany were not  
pursued.

The applicant company invokes Article 1 of Protocol no. 1 and  
Article 6 of the Convention in this respect.

**2.** The applicant complains under Article 8 of the Convention about  
the conduct of the President of the Regional Council of Tuscany in that  
on 28 July 1993 the latter publicly accused him of a crime of which he  
was later acquitted.

**3.** The applicant company finally alleges a violation of Article 5  
of the Convention, in that it has been prevented from starting its  
manufacturing activity in a safe environment.

## THE LAW

1.   The applicant company alleges an interference with its right to  
the peaceful enjoyment of its possessions in breach of Article 1 of  
Protocol no. 1 (P1-1) and a violation of Article 6 (Art. 6) of the  
Convention on the ground of the impossibility for it for almost ten  
years to obtain from the Italian authorities indications as to the  
changes on its factory building required in order to bring it into  
compliance with the anti-seismic legislation. It also complains that  
numerous criminal complaints it had filed against inter alia the Chief  
Engineer of the Construction Office and the President of the Regional  
Council of Tuscany were not pursued.

As concerns the impossibility for the applicant company to start  
its manufacturing activity because of the alleged defects in its  
structure, the Commission observes that the construction of the factory  
shed at issue was entrusted to a constructor, which, according to the  
applicant company, committed several construction errors which led, on  
the applicant company's initiative, to the declaration of unfitness for  
use and dangerousness and thus to the blocking of the works in January  
1987. The Commission further observes that in April 1987 the applicant  
company instituted civil proceedings against the constructor requesting  
it to be ordered to carry out all the works and amendments necessary  
to bring the factory building into compliance with the law.

The Commission notes that the object of these proceedings  
coincides with the object of the present application; it considers  
that, apart from the conduct of the administrative authorities, should  
the applicant company be successful, the constructor would have to  
carry out the necessary works and would be liable for any prejudice  
suffered by the applicant company.

However, the Commission notes that these proceedings are  
currently pending before the Court of Cassation; it considers therefore  
that the applicant company cannot claim to be a victim within the  
meaning of Article 25 (Art. 25) of the Convention at this stage of the  
proceedings. This part of the application is thus premature and must  
be rejected in pursuance of Article 27 para. 2 (Art. 27-2) of the  
Convention.

As regards the applicant company's complaint that its case did  
not receive a fair hearing within the meaning of Article 6 (Art. 6) of  
the Convention given that the criminal complaints it had filed were not  
pursued, the Commission recalls that under Article 6 para. 1 (Art. 6-1)  
of the Convention everyone is entitled, in the determination of either  
his civil rights and obligations or of any criminal charge against him,  
to a fair hearing by a tribunal. However, the Commission also recalls  
its established case-law to the extent that the right of access to  
court does not include a right to have criminal proceedings instituted  
against third persons (cf. amongst others No. 9777/82, Dec. 14.7.83,  
D.R. 34, p. 158).

It follows that this aspect of the complaint is incompatible  
ratione materiae with the provisions of the Convention within the  
meaning of Article 27 para. 2 (Art. 27-2).

2.   As regards the applicant's complaint under Article 8 (Art. 8) of  
the Convention relating to the adverse consequences to his reputation  
of the declarations made by the President of the Region Tuscany to the  
press, the Commission is not required to decide whether or not this  
complaint discloses any appearance of a violation  of the Convention  
as it is inadmissible for the following reasons.

The Commission recalls that, pursuant to Article 26 (Art. 26) of  
the Convention, it can only deal with a matter after all domestic  
remedies have been exhausted and within a period of six months from the  
date on which the final decision was taken.

In the present case, even assuming that Article 8 (Art. 8) is  
applicable in the present case, that the President of the Regional  
Council was acting in his capacity as civil servant and that his  
conduct can thus engage the responsibility of the State, and that the  
applicant company has exhausted all the domestic remedies which were  
available to it under Italian law, the Commission observes that the  
observations which the President of the Region Tuscany made to the  
press date back to 28 July 1993, which is more than six months before  
the filing of the present application (No. 20730/92, Dec. 18.10.95,  
unpublished).

It follows that this complaint must be rejected under Article 27  
para. 3 (Art. 27-3) of the Convention.

3.   Finally the Commission has examined the applicant company's  
complaint that it is being prevented from starting its manufacturing  
activity in a safe environment. However, it considers that, in so far  
as it has been substantiated, this complaint does not disclose any  
appearance of a violation of the Convention.

## For these reasons, the Commission, unanimously,

## DECLARES THE APPLICATION INADMISSIBLE.

M.F. BUQUICCHIO                                 J. LIDDY  
Secretary                                    President  
to the First Chamber                         of the First Chamber