# Europakommissionens beslut den 21 maj 1997 i målet KRICKL mot Österrike (nr 21752/93)

- Rubrik i HUDOC: KRICKL v. AUSTRIA
- Slag: Europakommissionens beslut · språk: engelska · datum: 1997-05-21
- Ansökningsnummer: 21752/93
- ECLI: ECLI:CE:ECHR:1997:0521DEC002175293
- Artiklar (HUDOC): P1-1, P1-1-1, 6, 6-1
- Slutsats (HUDOC): Inadmissible
- Källa: Europadomstolen (HUDOC), © ECHR-CEDH: https://hudoc.echr.coe.int/eng?i=001-3665
- Ratio Lex: https://ratiolex.se/internationell-ratt/europadomstolen/001-3665/

Elektronisk version. Den undertecknade texten i domstolens arkiv är den autentiska (art. 44.3 EKMR).

## AS TO THE ADMISSIBILITY OF

Application No. 21752/93  
by Edwin KRICKL  
against Austria

The European Commission of Human Rights (Second Chamber) sitting  
in private on 21 May 1997, the following members being present:

Mrs.  G.H. THUNE, President  
MM.   J.-C. GEUS  
G. JÖRUNDSSON  
A. GÖZÜBÜYÜK  
J.-C. SOYER  
H. DANELIUS  
F. MARTINEZ  
M.A. NOWICKI  
I. CABRAL BARRETO  
J. MUCHA  
D. SVÁBY  
P. LORENZEN  
K. HERNDL  
E. BIELIUNAS  
E.A. ALKEMA  
A. ARABADJIEV

Ms.   M.-T. SCHOEPFER, Secretary to the Chamber

Having regard to Article 25 of the Convention for the Protection  
of Human Rights and Fundamental Freedoms;

Having regard to the application introduced on 24 February 1993  
by Edwin KRICKL against Austria and registered on 27 April 1993 under  
file No. 21752/93;

Having regard to :

-    the reports provided for in Rule 47 of the Rules of Procedure of  
the Commission;

-    the observations submitted by the respondent Government on  
20 March 1995 and the observations in reply submitted by the  
applicant on 24 April 1995;

Having deliberated;

Decides as follows:

## THE FACTS

The applicant is an Austrian citizen, born in 1920 and residing  
in Linz.  In the proceedings before the Commission he is represented  
by Mr. K. Steiner, a lawyer practising in Linz.

The facts, as they have been submitted by the parties, may be  
summarised as follows.

A.   Particular circumstances of the case

The applicant is the owner of land in Bad Ischl (Upper Austria),  
comprising two parcels of building land, registered in the Ahorn land  
register (Grundbuch) as Nos. 310/99 and 310/100.  The latter parcel is  
situated adjacent to parcel No. 310/101 owned by the applicant's  
neighbour R.B.

On 22 October 1973 the Mayor of Bad Ischl granted R.B. a building  
permit for a house on his land in which the minimum distance from the  
border of the parcel was fixed at 4 metres.  This condition was in  
accordance with the building plan (Bebauungsplan) of 1985 for that  
area.

When starting the construction works for his house R.B. did not  
comply with the above condition and the house was built at a distance  
of two metres from the neighbouring parcel owned by the applicant.  On  
6 August 1976, following a complaint by the applicant, the Mayor  
ordered the interruption of the construction works.  On 5 July 1978 the  
Mayor ordered R.B. to apply for a retrospective building permit or to  
remove the construction.

On 22 November 1978 the Municipal Council (Gemeinderat) of Bad  
Ischl amended the building plan.  The amendment consisted, inter alia,  
in the division of the two parcels of land owned by the applicant in  
three parcels of building land, a narrow road between the applicant's  
land and the land of R.B., and the fixing of a minimum distance of 0,5  
metres for buildings to be erected on R.B.'s land.  After having been  
approved by the Regional Government, the amended building plan entered  
into force on 25 April 1979.

On 20 November 1985 the Mayor granted a retroactive building  
permit to R.B.  On 6 February 1987 the Municipal Council (Gemeinderat)  
dismissed the applicant's appeal against the building permit and on  
2 June 1987 the Upper Austrian Regional Government (Landesregierung)  
dismissed the applicant's further appeal.

Subsequently the applicant filed a complaint against the Regional  
Government's decision with the Constitutional Court  
(Verfassungsgerichtshof).  He submitted that the decision had been  
based on an unlawful decree, namely the building plan of  
22 November 1978.

On 30 September 1989 the Constitutional Court found the amendment  
of the building plan of Bad Ischl, as far as parcel No. 310/101 owned  
by R.B. was concerned, to be incompatible with the Upper Austrian  
Regional Planning Act (Raumordnungsgesetz).  On 5 December 1989 the  
Constitutional Court therefore upheld the applicant's individual  
complaint against the final decision of the regional authorities  
regarding the lawfulness of R.B.'s building permit.  Proceedings were  
then resumed before the local and regional authorities.

On 22 June 1990 the Bad Ischl Municipality Council quashed the  
Mayor's decision of 20 November 1985 granting R.B. a building permit.  
By letter of 14 January 1991 the Mayor of Bad Ischl informed the  
applicant that, on 5 October 1990, R.B. had been ordered to demolish  
his house within eight years.

On 1 February 1991 the applicant, claiming to be a party to the  
proceedings regarding the demolition order, lodged an appeal against  
the Mayor's demolition order of 5 October 1990, challenging, inter  
alia, the length of the period which his neighbour had been granted for  
the compliance with this order.

On 27 February 1991 the Municipal Council rejected the appeal as  
being inadmissible.  Referring to the constant case-law of the  
Administrative Court (Verwaltungsgerichtshof) on this matter it found  
that the applicant had no locus standi in the proceedings at issue  
because neighbours were not a party to proceedings for a demolition  
order.

By letter of 3 June 1991 the Upper Austrian Regional Government  
informed the Mayor that the applicant had lodged a further appeal  
(Vorstellung) against the demolition order of 5 October 1990.  It  
stated that under the law in force the applicant clearly had no locus  
standi in proceedings for a demolition order.  However, the Regional  
Government had doubts whether the length of the time-limit granted to  
R.B. in the demolition order was in compliance with Section 87 para. 2  
of the Constitutional Court Act.  If the Regional Government on further  
consideration of the matter would arrive at the conclusion that the  
decision was unlawful it would consider quashing the demolition in the  
exercise of its supervisory function (Aufsichtsrecht).

On 30 December 1991 the Upper Austrian Regional Government  
dismissed the applicant's further appeal.  It found that the decision  
given in the proceedings regarding the demolition order did not  
infringe the applicant's rights as he had no locus standi in these  
proceedings.

On 19 February 1992 the applicant lodged a complaint with the  
Constitutional Court (Verfassungsgerichtshof).  He complained about the  
refusal of the authorities to accept him as a party to the proceedings  
regarding the demolition order and relied in this respect on Article 6  
of the Convention.  He further complained that the excessive time-limit  
granted for the compliance with the demolition order violated his  
property rights because he could not sell his land at an appropriate  
price as long as the neighbour's building had not been demolished.

On 24 June 1992 the Constitutional Court declined to entertain  
the applicant's complaint for lack of prospect of success and referred  
the case to the Administrative Court.

On 10 November 1992 the Administrative Court dismissed the  
applicant's complaint.  It referred to its constant case-law regarding  
the relevant provisions of the Upper Austrian Building Regulations  
(Oberösterreichische Bauordnung) according to which neighbours were not  
to be considered as a party to proceedings for a demolition order.

Subsequently, the applicant filed a complaint (Beschwerde) with  
the Ombudsman's Office (Volksanwaltschaft) relating to the above  
events.

On 13 January 1994 the Ombudsman's Office issued a recommendation  
(Empfehlung) concerning the applicant's complaint.  It considered that  
the fixing of a time-limit of eight years for complying with the  
demolition order and the failure of the Regional Government to quash  
the demolition order in the exercise of its supervisory function  
constituted an undesirable state of affairs in public administration  
(Mißstand im Bereich der öffentlichen Verwaltung).  It recommended to  
the Regional Government to exercise its supervisory powers.  The  
Ombudsman's Office found that neither the Constitutional Court nor the  
Administrative Court in their respective proceedings could have  
examined whether the time-limit had been appropriate.  Nevertheless,  
the Regional Government should have quashed the demolition order ex  
officio in the exercise of its supervisory powers and the building  
authorities should have fixed a shorter time-limit.

On 11 April 1995 the Ombudsman's Office informed the applicant  
that the Regional Government saw no possibility to follow the  
Ombudsman's Office's recommendation.

B.   Relevant domestic law

Section 61 of the Upper Austrian Building Regulations  
(Bauordnung), in the version applicable in the present case, reads as  
follows:

[Translation]

"In case the building authority establishes that a building  
requiring a  building permit is being or has been erected without  
such a permit, it shall make an order requesting the owner of the  
construction to either retroactively request a permit within a  
reasonable period of time to be determined by the authority, or  
else to demolish the construction, again within a reasonable  
period of time to be determined by the authority.  The  
possibility to apply retrospectively for a building permit shall  
not be granted if under the law in force a building permit cannot  
be granted."

[German]

"Stellt die Baubehörde fest, daß eine bewilligungspflichtige  
bauliche Anlage ohne Baubewilligung ausgeführt wird oder bereits  
ausgeführt wurde, so hat sie dem Eigentümer mit Bescheid  
aufzutragen, entweder nachträglich innerhalb einer angemessen  
festzusetzenden Frist um die Baubewilligung anzusuchen oder die  
bauliche Anlage innerhalb einer weiters festzusetzenden Frist zu  
beseitigen.  Die Möglichkeit, nachträglich um die Baubewilligung  
anzusuchen, ist dann nicht einzuräumen, wenn nach der  
maßgeblichen Rechtslage eine Baubewilligung nicht erteilt werden  
kann."

Section 87 para. 2 of the Constitutional Court Act of 1953  
provides as follows:

[Translation]

"If the Constitutional Court allows a complaint, the  
administrative authorities are under the obligation to  
re-establish in the case at issue with the use of all the powers  
granted to them by law and without delay a legal situation  
corresponding to the legal opinion expressed by the  
Constitutional Court."

[German]

"Wenn der Verfassungsgerichtshof einer Beschwerde stattgegeben  
hat, sind die Verwaltungsbehörden verpflichtet, in dem  
betreffenden Fall mit den ihnen zu Gebote stehenden rechtlichen  
Mitteln unverzüglich den der Rechtsanschauung des  
Verfassungsgerichtshofes entsprechenden Rechtszustand  
herzustellen."

Section 8 of the General Administrative Procedure Act  
(Allgemeines Verwaltungsverfahrensgesetz) reads as follows:

[Translation]

"Persons who make use of the service of a public authority or who  
are subject to acts by a public authority are participants to  
proceedings.  However, insofar as they take part in the  
proceedings on the basis of a right granted to them or an  
interest protected by the law they are parties."

[German]

"Personen, die eine Tätigkeit einer Behörde in Anspruch nehmen  
oder auf die sich die Tätigkeit einer Behörde bezieht, sind  
Beteiligte und, insoweit sie an der Sache vermöge eines  
Rechtsanspruches oder eines rechtlichen Interesses beteiligt  
sind, Parteien."

According to the constant case-law of the Constitutional Court  
and the Administrative Court Section 8 of the General Administrative  
Procedure Act only grants procedural rights in administrative  
proceedings but does not grant substantive rights.  Whether or not a  
person has, in administrative proceedings, the position of a party  
depends on whether he or she can rely on provisions of administrative  
law which grant a subjective right (see Antoniolli-Koja, Allgemeines  
Verwaltungsrecht, Second Edition, Vienna 1986, p. 274 with reference  
to VwSlg. [Collection of Decisions of the Administrative Court]  
5258A/1960, 5722A/1962, 6115A/1963, 7488A/1969, 7662A/1969, 7810A/1970,  
8498A/1973; VfSlg. [Collection of Decisions of the Constitutional  
Court] 1650/1948, 4227/1962, 5358/1966, 6257/1970; Walter-Mayer,  
Grundriß des österreichischen Verwaltungsverfahrensrechts, sixth  
edition 1995, p. 48 with reference to Administrative Court  
9 November 1982, 82/15/0112; 30 September 1992, 89/03/0224 and  
VfSlg. 11.934).

As regards the issuing of orders in building law proceedings, in  
particular concerning the permit to use a building after a building  
permit has been issued and the building has been erected  
(Benützungsbewilligung) or demolition orders, the Administrative Court,  
having regard to the specific Building Regulations, has constantly held  
that the neighbour is no party to such proceedings (see Administrative  
Court 23 September 1968, 1251/68; 29 February 1972, 120/72;  
20 November 1972, 1410/72; 18 September 1973, 1365/73;  
26 February 1974, 98/74; 12 February 1981, VwSlg. 10368/A;  
15 September 1983, 83/06/0146; 29 January 1985, 83/05/0189;  
12 February 1985, 85/05/0012; 28 April 1992, 91/05/0204; Dolp, Die  
Verwaltungsgerichtsbarkeit, second edition 1987; p. 224 ff.).

## COMPLAINTS

The applicant complains under Article 6 of the Convention that  
he did not have a fair hearing in the proceedings for the demolition  
order, because the Austrian authorities and courts had refused to  
decide on the merits of his appeals and complaints and to accept him  
as a party to the proceedings on the demolition order.

The applicant complains under Article 1 of Protocol No. 1 that  
his right to respect for his property has been infringed.  He submits  
that it was arbitrary to grant an unreasonably long time-limit of eight  
years for compliance with the demolition order.  The building on his  
neighbour's land had been erected unlawfully and as long as the  
building is not removed it is impossible to sell the applicant's  
property at an adequate price.  He also invokes Article 14 of the  
Convention.

## PROCEEDINGS BEFORE THE COMMISSION

The application was introduced on 24 February 1993 and registered  
on 27 April 1993.

On 12 October 1994 the Commission decided to communicate the  
application to the respondent Government.

The Government's written observations were submitted on  
20 March 1995, after an extension of the time-limit fixed for that  
purpose.  The applicant replied on 24 April 1995.

## THE LAW

**1.** The applicant complains under Article 6 (Art. 6) of the  
Convention that he did not have a fair hearing in the proceedings on  
the demolition order.

Article 6 para. 1 (Art. 6-1) of the Convention, as far as  
relevant, provides as follows:

"In the determination of his civil rights and obligations  
..., everyone is entitled to a fair and public hearing  
...    by an independent and impartial tribunal established  
by law."

The Government submit that the proceedings concerning the  
demolition of a house built on an adjacent parcel of land were purely  
a matter of public law and had no direct bearing on any of the  
applicant's civil rights.  According to the constant case-law of the  
Administrative Court neighbours have no valid claim as regards the  
demolition of an illicitly erected building and therefore cannot be a  
party to administrative proceedings in the course of which a decision  
on a demolition order is taken by the building authority.  Such a right  
can neither be derived from Section 61 of the Upper Austria Building  
Regulations nor from Section 87 para. 2 of the Constitutional Court  
Act.  The applicant therefore has no civil right within the meaning of  
Article 6 para. 1 (Art. 6-1) of the Convention as regards the  
demolition order as this provision does not grant new rights which had  
not been recognised previously by domestic law.

In any event, by quashing the building permit on 22 June 1990 and  
by issuing a demolition order on 5 October 1990 the competent building  
authorities have speedily complied with the Constitutional Court's  
decision of 5 December 1989 by which the building permit granted to the  
neighbour had been quashed.

This is disputed by the applicant.  In his view he did have a  
subjective right under domestic law to request the demolition of his  
neighbour's building.  If the Administrative Court, which denied him  
locus standi in the proceedings for the demolition order, would have  
interpreted correctly Section 8 of the General Administrative Procedure  
Act it should have granted him locus standi.  Furthermore, the  
administrative authorities had not complied with the Constitutional  
Court's decision of 5 December 1989 because they had failed to order  
the immediate demolition of his neighbour's building.

The applicant submits that the case-law of the Administrative  
Court according to which neighbours had no locus standi in proceedings  
for a demolition order was problematic as it led to a situation where  
a neighbour who had succeeded in having the building permit granted to  
his neighbour quashed was nevertheless deprived of the possibility to  
have this decision appropriately enforced.  Since under the building  
regulations he was entitled to claim that his neighbour respect the  
minimum distance from his land, he must have had the possibility to  
have this right enforced.  From these considerations it was apparent  
that he should have been accepted by the authorities as a party to the  
proceedings regarding the demolition order.

The Commission recalls that Article 6 para. 1 (Art. 6-1) extends  
only to "contestations" (disputes) over (civil) "rights and  
obligations" which can be said, at least on arguable grounds, to be  
recognised under domestic law (Eur. Court HR, Oerlemans v. the  
Netherlands judgment of 27 November 1991, Series A no. 219, pp. 20-21,  
paras. 45-49).  Article 6 para. 1 (Art. 6-1) is not aimed at creating  
new substantive rights, without a legal basis in the Contracting State,  
but at providing procedural protection of rights already recognised in  
domestic law (Eur. Court HR, W. v. United Kingdom judgment of 8 July  
1987, Series A no. 121-A, p. 32, para. 73; Kraska v. Switzerland  
judgment of 19 April 1993, Series A no. 254-B, p. 48, para. 24; Zander  
v. Sweden judgment of 25 November 1993, Series A no. 279, p. 39, para.  
24).

The Commission observes that Austrian law, in particular the  
Building Regulation at issue, did not provide for locus standi of a  
neighbour in proceedings regarding a demolition order.  Also Section 8  
of the General Administrative Procedure Act, like Article 6 (Art. 6)  
of the Convention itself, only transforms substantive rights in  
procedural rights, but does not guarantee itself a particular  
substantive right.  In this respect the Commission refers to the  
constant case-law of the Administrative Court and the findings of the  
Austrian courts and authorities in the present proceedings, which found  
that according to the Upper Austrian Building Regulations a neighbour  
is not entitled to make objections to any decisions taken in the course  
of proceedings regarding a demolition order.

In these circumstances the Commission finds that in the  
proceedings regarding the demolition order the applicant could not rely  
on a right recognised under domestic law and that Article 6 para. 1  
(Art. 6-1)  was consequently not applicable to these proceedings.

The applicant submits, however, that although he had succeeded  
in having his neighbour's building permit quashed he nevertheless was  
deprived of the possibility to have this decision appropriately  
enforced.

The Commission finds that these submissions raise a further issue  
to be examined under Article 6 para. 1 (Art. 6-1) of the Convention.  
In this respect it recalls that in the Hornsby case the European Court  
of Human Rights found that the right of access to court also includes  
the right to be sufficiently protected against the refusal of state  
authorities to comply with a court judgment (Eur. Court HR, Hornsby v.  
Greece judgment of 19 march 1997, paras. 40-41, to be published in  
Reports 1997-I). The relevant passage of the judgment reads as follows:

"40.  The Court reiterates that, according to its established  
case-law, Article 6 § 1 (Art. 6-1) secures to everyone the right  
to have any claim relating to his civil rights and obligations  
brought before a court or tribunal; in this way it embodies the  
`right to a court', of which the right of access, that is the  
right to institute proceedings before courts in civil matters,  
constitutes one aspect (see the Philis v. Greece (no. 1) judgment  
of 27 August 1991, Series A no. 209, p. 20, para. 59).  However,  
that right would be illusory if a Contracting State's domestic  
legal system allowed a final, binding judicial decision to remain  
inoperative to the detriment of one party.  It would be  
inconceivable that Article 6 (Art. 6) should describe in detail  
procedural guarantees afforded to litigants - proceedings that  
are fair, public and expeditious - without protecting the  
implementation of judicial decisions; to construe Article 6  
(Art. 6 as being concerned exclusively with access to a court and  
the conduct of proceedings would be likely to lead to situations  
incompatible with the principle of the rule of law which the  
Contracting States undertook to respect when they ratified the  
Convention (see, mutatis mutandis, the Golder v. the United  
Kingdom judgment of 7 May 1974, Series A no. 18, pp. 16-18,  
paras. 34-36).  Execution of a judgment given by any court must  
therefore be regarded as an integral part of the `trial' for the  
purposes of Article 6 (Art. 6); moreover, the Court has already  
accepted this principle in cases concerning the length of  
proceedings (see, most recently, the Di Pede v. Italy and Zappia  
v. Italy judgments of 26 September 1996, to be published in  
Reports 1996-I).

41.   The above principles are of even greater importance in the  
context of administrative proceedings concerning a dispute whose  
outcome is decisive for a litigant's civil rights.  By lodging  
an application for judicial review with the State's highest  
administrative court the litigant seeks not only annulment of the  
impugned decision but also and above all the removal of its  
effects.  The effective protection of a party to such proceedings  
and the restoration of legality presuppose an obligation on the  
administrative authorities' part to comply with a judgment of  
that court.  The Court observes in this connection that the  
administrative authorities form one element of a State subject  
to the rule of law and their interests accordingly coincide with  
the need for the proper administration of justice.  Where  
administrative authorities refuse or fail to comply, or even  
delay doing so, the guarantees under Article 6 (Art. 6) enjoyed  
by a litigant during the judicial phase of the proceedings are  
rendered devoid of purpose."

The Commission observes that in the Ortenberg case the Court  
recognised that proceedings for the granting of a building permit to  
a particular person also involve the determination of a civil right of  
the neighbour who opposes a building permit.  The Court found that in  
such proceedings pecuniary interests of the opposing neighbour could  
be at stake and therefore found the civil right limb of Article 6  
para. 1 (Art. 6-1) to be applicable (Eur. Court HR, Ortenberg v.  
Austria judgment of 25 November 1994, Series A no. 295-B, p. 48-49,  
paras. 28).  Moreover, under Austrian law, as can also be seen from the  
present case, the right of a neighbour to be a party to proceedings  
regarding a building permit is explicitly recognised.

The Commission therefore has to examine whether the order  
addressed to the applicant's neighbour to demolish his house within a  
period of eight years is in accordance with the principles set out by  
the European Court of Human Rights in the above Hornsby case.

The Commission finds, however, that there are significant  
differences between the situation of the present applicant and Mr and  
Mrs Hornsby, the applicants in the case referred to above.  While the  
granting of a license for running a language school to Mr and Mrs  
Hornsby, which was the subject matter of the dispute in the above case,  
may be considered as the only appropriate response to a decision by  
which the refusal of such a licence had been quashed, this is not true  
for the demolition of the neighbour's building in the present case.

The applicant was successful in the proceedings for the granting  
of a building permit to his neighbour, and such a permit had therefore  
been refused.  The Commission cannot find, however, that this should  
automatically give the applicant a right to have the building  
immediately destroyed.  Demolition would only be one possibility to  
give effect to the decision rendered in the building permit  
proceedings.  Another possibility would be pecuniary compensation to  
the applicant for the alleged damage caused by the unlawfully erected  
building.  Thus, the applicant could have introduced civil proceedings  
against his neighbour for compensation if he had actually sustained  
prejudice because of the illicit construction and/or official liability  
proceedings against the Municipality arguing that the lengthy time-  
limit granted for the compliance with the demolition order was  
unlawful, that he could not otherwise challenge this decision, and that  
this decision had caused him prejudice.  The applicant, however, did  
not choose these avenues but insisted on the immediate demolition of  
his neighbour's building and he did so although he must have been aware  
that in view of Austrian law as in force he could not have obtained any  
decision in his favour in the proceedings regarding the demolition  
order.

Furthermore, the authorities, after the Constitutional Court has  
given its decision on 5 December 1989, have reacted without delay as  
they quashed the building permit and ordered the demolition of the  
building.

Taking these circumstances into account, the Commission cannot  
find that there is any appearance of a violation of the applicant's  
rights under Article 6 para. 1 (Art. 6-1) of the Convention in the  
proceedings regarding the building permit or the demolition order.

It follows that this part of the application is manifestly ill-  
founded within the meaning of Article 27 para. 2 (Art. 27-2) of the  
Convention.

**2.** The applicant complains under Article 1 of Protocol No. 1 (P1-1)  
that the lengthy time-limit granted to his neighbour for compliance  
with the demolition order violated his right to respect for his  
property rights.  He submits that it was arbitrary to grant an  
unreasonably long time-limit of eight years for compliance with the  
demolition order.  The building on his neighbour's land had been  
erected unlawfully and as long as the building is not removed it is  
impossible to sell his property at an adequate price.  He also invokes  
Article 14 (Art. 14) of the Convention.

The Commission finds that this complaint falls to be considered  
under Article 1 of Protocol No. 1 (P1-1), which reads as follows:

"Every natural or legal person is entitled to the peaceful  
enjoyment of his possessions.  No one shall be deprived of his  
possessions except in the public interest and subject to the  
conditions provided for by law and by the general principles of  
international law.

The preceding provisions shall not, however, in any way impair  
the right of a State to enforce such laws as it deems necessary  
to control the use of property in accordance with the general  
interest or to secure the payment of taxes or other contributions  
or penalties."

The Government submit that the proceedings at issue neither  
deprived the applicant of his property rights nor contained any  
restriction on the use of his land.  The amended building plan which  
allowed for a more densely structured built-up area would have led to  
an increase in the value of the applicant's property, as similarly  
structured development areas are generally selling at a much higher  
rate.  It was however this very amendment of the building plan which  
was later quashed by the Constitutional Court at the applicant's  
request.  In any event, the applicant's allegation that he was unable  
to sell his property at a reasonable price has not been further  
substantiated in any way.

This is disputed by the applicant.  He submits that it must be  
considered as obvious that the market value of his land was diminished  
because the neighbour's building was erected in violation of the  
minimum distance.  Because of the diminished market value of his land  
he could not freely dispose of it.  There was no question of an  
increase of the value of his property as no owner wished that the  
neighbour lived too close to himself.

The Commission recalls that Article 1 of Protocol No. 1 (P1-1)  
comprises three distinct rules.  The first rule, set out in the first  
sentence of the first paragraph, is of a general nature and enunciates  
the principle of peaceful enjoyment of property.  The second rule,  
contained in the second sentence of the same paragraph, covers  
deprivation of possessions and makes it subject to certain conditions.  
The third rule, stated in the second paragraph, recognises that  
Contracting States are entitled, amongst other things, to control the  
use of property in accordance with the general interest.  The three  
rules are not "distinct" in the sense  of being unconnected: the second  
and third rules are concerned with particular instances of interference  
with the right to peaceful enjoyment of property and should therefore  
be construed in the light of the general principles enunciated in the  
first rule (e.g. Eur. Court HR, Allan Jacobsson v. Sweden judgment of  
23 October 1989, Series A no. 163, para. 53).

The Commission observes that the applicant was not prevented by  
law from disposing of his land as he wished to do as he could build on  
it or sell it.  The Commission therefore finds that the situation  
complained of did not amount to a deprivation of the applicant's  
possessions within the meaning of the second sentence of the first  
paragraph of Article 1 (Art. 1-1-2).  Nor did it constitute a control  
of the use of the applicant's property which would have to be examined  
under the second paragraph of Article 1 (Art. 1-2).

It remains to ascertain whether the situation complained of  
amounts to an interference with the rights guaranteed to the applicant  
in the first sentence of the first paragraph of Article 1 (Art. 1-1-1).

The applicant argues that his right to dispose of his land was  
in fact limited because of the authorities' failure to have the  
building on his neighbour's land demolished. In this respect the  
Commission observes that the neighbour had the right to build on his  
land and that the unlawfulness of the neighbour's building lay in the  
fact that the building he had erected was situated two metres too close  
to the applicant's land.  The Commission finds however, that the  
applicant has not sufficiently substantiated that this fact led to a  
loss of value of his land or that he could not be compensated for such  
loss if any.

Moreover, if the applicant's only interest was to achieve a  
higher price for his land it does not appear unreasonable that the  
value of his land could have been increased by having it divided in  
more parcels, as provided for in the amendment of the building plan,  
since this may have led to more parcels which were building land.

Accordingly, there is no appearance of a violation of the  
applicant's right to peaceful enjoyment of his possessions as  
guaranteed by Article 1 of Protocol No. 1 (P1-1).

It follows that also this part of the application is manifestly  
ill-founded within the meaning of Article 27 para. 2 (Art. 27-2) of the  
Convention.

## For these reasons, the Commission, unanimously,

## DECLARES THE APPLICATION INADMISSIBLE.

M.-T. SCHOEPFER                              G.H. THUNE  
Secretary                                  President  
to the Second Chamber                      of the Second Chamber

