# Europakommissionens beslut den 7 juli 1986 i målet LUNDQUIST mot Sverige (nr 10911/84)

- Rubrik i HUDOC: LUNDQUIST v. SWEDEN
- Slag: Europakommissionens beslut · språk: engelska · datum: 1986-07-07
- Ansökningsnummer: 10911/84
- ECLI: ECLI:CE:ECHR:1986:0707DEC001091184
- Artiklar (HUDOC): P1-1, P1-1-2
- Slutsats (HUDOC): Inadmissible
- Källa: Europadomstolen (HUDOC), © ECHR-CEDH: https://hudoc.echr.coe.int/eng?i=001-530
- Ratio Lex: https://ratiolex.se/internationell-ratt/europadomstolen/001-530/

Elektronisk version. Den undertecknade texten i domstolens arkiv är den autentiska (art. 44.3 EKMR).

The European Commission of Human Rights sitting in private on  
7 July 1986, the following members being present:

MM. C. A. NØRGAARD, President  
G. SPERDUTI  
J. A. FROWEIN  
G. JÖRUNDSSON  
S. TRECHSEL  
B. KIERNAN  
A. S. GÖZÜBÜYÜK  
A. WEITZEL  
J. C. SOYER  
H. G. SCHERMERS  
H. DANELIUS  
G. BATLINER  
J. CAMPINOS  
Mrs G. H. THUNE  
Sir Basil HALL

Mr. H. C. KRÜGER, Secretary to the Commission

Having regard to Art. 25 (Art. 25) of the Convention for the  
Protection of Human Rights and Fundamental Freedoms;

Having regard to the application introduced on 23 March 1984 by  
U.L. against Sweden and registered on 13 April 1984 under  
file No. 10911/84;

Having regard to the report provided for in Rule 40 of the Rules of  
Procedure of the Commission;

Having deliberated;

Decides as follows:

## THE FACTS

The facts of the case, as submitted by the applicant, may be  
summarised as follows:

The applicant is a Swedish citizen, born in 1933.  He is a farming  
supervisor by profession and resides at Stehag, Sweden. Before the  
Commission the applicant is represented by Mr. Peter Nobel, of the  
law firm Chrysander hb, Uppsala, Sweden.

In 1943 through the parcelling out of land under the Manor of Noor  
about seventy building sites were formed at Knivsta, a small rural  
centre situated approximately 15 kilometres south of Uppsala.  The  
forming of the original sites followed a subdivision plan drawn up in  
1942 and confirmed by the competent authority on 8 July 1943.

On 4 December 1969 the applicant and his wife purchased three of the  
still vacant sites identified in the official land register as Noor  
53:1, 54:1 and 55:1.  Later Noor 53:1 was divided into two lots, Noor  
53:1 and 53:2.

The entire area acquired by the applicant and his wife covered roughly  
10,000 square metres.  They owned it jointly.  The purpose was to sell  
out three of the lots and build a house for permanent dwelling on one  
of them.  At this time no building was erected on any of these lots.

The applicant and his wife received the required building permit and  
built a house on the property Noor 54:1, which is a piece of land of  
approximately 3,000 square metres, and moved in there in 1970.  In the  
years 1970 to 1972 Noor 53:1, 53:2 and 55:1 were sold to different  
buyers who, after having been given due and proper building permits,  
built a house on their respective lots and moved in.

Awaiting a more detailed planning of the area, a general building  
prohibition was issued in 1972 according to Section 35 of the Building  
Act of 1947.

Following a divorce  between the applicant and his wife, they agreed,  
according to two contracts of 27 January and 10 September 1973 that  
her half of the property should be transferred to him. Consequently  
the applicant was registered on 20 February 1974 as the only owner of  
Noor 54:1.

Thereafter, on 22 February 1974, the applicant signed two contracts.  
Through the first contract (köpekontrakt) he sold the property to  
Mr. E and his wife and with a stipulation among others that the buyers  
should take the property into their possession on 1 May 1974.  On the  
same day the applicant signed and entered into a leasing contract with  
Mr. and Mrs. E, giving him a leaseholder's right to the western part  
of Noor 54:1.  The applicant actually intended to remain the owner of  
that piece of land, but as Noor 54:1 was not legally divided into two  
independent real estate units of which each could be registered, the  
applicant had to content himself with a provisional solution of  
leasing the part.  According to the contract it was a lease for  
dwelling purposes (bostadsarrende) and the size of the area was  
approximately 1,500 square metres.  The duration of the lease was  
50 years as from 1 May 1974 and thus expired on 1 May 2024. If no  
notice to terminate the contract was given, the lease should be  
prolonged by 50 years every time.  Furthermore the following passage  
was found in the contract:

"At the same time as this lease contract the parties have agreed on a  
contract of purchase of the leased area. When this purchase (köpet)  
has been accomplished through the establishment of an independent real  
estate unit registered for (genom fastighetsbildning och lagfart för  
(the applicant), this lease contract will at the same moment expire."

The leasing contract also contained various guarantees from Mr. and  
Mrs. E for the protection of the rights of the applicant. Inter alia  
the last paragraph of the contract obliged Mr. and Mrs. E not to  
transfer the ownership of Noor 54:1 to anyone who would not enter into  
exactly the same obligations towards the applicant.

On 30 March 1979 Mr. and Mrs. E sold the entire property to Mr. G.  
The acquisition was registered on 10 April 1979.  The applicant's  
rights are fully preserved in relation to the present owner  
of Noor 54:1.

As mentioned above a general building prohibition was issued in 1972  
according to Section 35 of the Building Act of 1947.

Since, however, the authorities under the law could allow exceptions  
from the general prohibition the applicant applied on 8 January 1974  
for a building permit to build a house on the leased land.  This  
application, however, was rejected by the Building Committee  
(Byggnadsnämnden) on 13 June 1974 with reference to the general  
building prohibition for the area.  The applicant appealed against  
this decision to the County Administrative Board (Länsstyrelsen) which  
upheld the decision on 14 May 1975.  It does not appear from the  
documents submitted that the applicant appealed against this decision  
to the Government.

The applicant submits that the general building prohibition expired in  
1975.  It appears, however, that the County Administrative Board  
issued a prohibition on 21 February 1977 against a dense building up  
of the area in accordance with Section 168 of the Building Act.  The  
applicant complained to the Government (Bostadsdepartementet) which,  
on 5 February 1981 revoked the prohibition against densely building up  
of the area, finding that such prohibition would cause too much of a  
disadvantage to the landowners.

Thereafter, on 18 April 1981, the applicant asked the Building  
Committee for a preliminary decision (förhandsbesked) as to whether he  
could now get a building permit in order to build a house on the land  
he had leased.  By letter of 9 June 1981 he asked the Building  
Committee alternatively to acquire the piece of land at issue at a  
price corresponding to the market value of land which could be used  
for construction purposes and that he be offered a similar piece of  
land where he could build a home in exchange for his leased lot.

On 2 July 1981, the Building Committee refused to make any preliminary  
decision as requested by the applicant, pointing out that the  
construction of a house on the piece of land in question would mean a  
splitting up of Noor 54:1, which again was not in conformity with the  
subdivision plan of the area.  Furthermore, the site was not found  
suitable for construction, due to a great difference in the ground  
levels of the site.

The applicant appealed against this decision to the County  
Administrative Board which apparently adjourned the examination of the  
case pending the outcome of the Government's decision regarding a new  
general prohibition on the building of new houses in the area  
introduced by the Board on 9 December 1981 and appealed against by the  
applicant.  The Government decided on 22 December 1982 to uphold the  
County Administrative Board's decision stating inter alia:

"The background for the building prohibition in question is that the  
County fears an extensive building activity in the area on sites which  
have not been exploited yet and after the parcelling out of the  
relatively large sites.  (Another reason is that) the Health Care  
Board has considered that further building up would cause sanitary  
problems with the risk of polluting water sources and the Lake  
Valloxen.

The Government decides as follows:

The size of the sites and the position of the area near the centre of  
Knivsta speak in favour of the opinion of the County Authority that  
further construction should be postponed.  For this reason, and since  
a sewer system of such a standard that further construction in the  
area could take place without the risk of sanitary problems is not  
available, the Government finds that there is reason to introduce a  
building prohibition in the area pending a necessary solution to the  
sewer system problems, to be found either by the landowners or the  
County Authority.  The appeal is therefore rejected."

Thereafter the County Administrative Board resumed the examination of  
the applicant's case and decided on 7 February 1983 to uphold the  
Building Committee's decision of 2 July 1981.  The applicant appealed  
against the decision to the Government which, on 29 September 1983,  
rejected it stating that they had found no reason to grant a  
dispensation from the building prohibition imposed on  
22 December 1982.

## COMPLAINTS

The applicant recalls that he possesses since 1974 a leaseholder's  
right for dwelling purposes (bostadsarrende).  He has the option to  
buy the leased land if it could be registered as an independent real  
estate unit (fastighetsbildning för lagfartsändamål).

The applicant complains that "the decisions of the Government and the  
lower authorities constitute a violation of Article 1 of Protocol  
No. 1 (P1-1) to the Convention as (he) has been, for an intolerably  
long period of time, prevented from the peaceful enjoyment of his  
possession (or from disposing) of it."  The applicant has further  
submitted that "since the (County Administrative Board) issued its  
first prohibition for further building in 1972 (he) has in vain  
struggled through all possible legal means (in order) to utilize what  
was at that time his property ... and (which) is since then his  
possession with a leaseholder's right and with a first option to  
regain ownership."

## THE LAW

The applicant has complained that the decision not to grant him  
permission to build a house for dwelling purposes on the piece of land  
he has leased, prevents him from peaceful enjoyment of his possessions  
within the meaning of Article 1 of Protocol No. 1 (P1-1) to the  
Convention which reads:

"Every natural or legal person is entitled to the peaceful enjoyment  
of his possessions.  No one shall be deprived of his possessions  
except in the public interest and subject to the conditions provided  
for by law and by the general principles of international law.

The preceding provisions shall not, however, in any way impair the  
right of a State to enforce such laws as it deems necessary to control  
the use of property in accordance with the general interest or to  
secure the payment of taxes or other contributions or penalties."

Regarding the question whether the present case discloses an  
interference with the applicant's right of property, the Commission  
recalls that the applicant is a leaseholder and not the actual owner  
of the piece of land in question.  The Commission does not, however,  
find that this fact affects the outcome of this case, but accepts that  
the land is the applicant's property within the meaning of Article 1  
of Protocol No. 1 (P1-1).  The Commission further finds that it can  
be left open whether the prohibition on building a house on the land  
interfered with the applicant's rights secured to him under Article 1  
of Protocol No. 1 (P1-1) to the Convention, because such an  
interference is in any event justified for the following reasons.

In considering whether or not the interference violated Article 1  
(P1-1), the Commission recalls that under Article 1 second paragraph  
(P1-1-2) the contracting States have the right to enforce such laws as  
are deemed necessary to control the use of property in accordance with  
the general interest and the Commission finds that the present case  
clearly falls within the ambit of this paragraph.  It is thus, the  
Commission's task to ascertain whether the requirements set out in  
Article 1 second paragraph (P1-1-2) are fulfilled, namely that the  
interference is based on legal provisions, that it is in the general  
interest and that the measure is proportionate to the legitimate aim  
in question.

Regarding the first requirement, the Commission recalls that the  
applicant does not allege that the building restriction or the refusal  
to grant dispensation were unlawful.  Nor does the information  
submitted by the applicant support such an allegation.  The decisions  
taken were based on the relevant Swedish provisions of the Building  
Act of 1947.  Whilst, consequently, it is beyond doubt that the  
measure taken was lawful, the Commission has to consider next whether  
the aim was legitimate as being in the general interest.

The Commission finds no difficulty in this respect.  In the  
increasingly complex and ever-developing society of today, it is  
indispensable that the use of land be regulated by detailed and  
careful planning.  Therefore, there can be no doubt that the  
development plans which have their legal basis in the Building Act are  
adopted and implemented in the general interest.  From this it follows  
that the contracting States must also have certain instruments at  
their disposal, such as prohibitions on construction, in order to  
secure the enforcement of such plans on the use of land.  The  
Commission is thus satisfied that in the present case the prohibition  
on construction was a lawful measure which pursued a legitimate aim.

According to what was indicated above, the Commission must finally  
consider whether the restriction was proportionate to the legitimate  
aim.  In this respect, the Commission recalls that the applicant has  
referred to the "intolerable period of time" during which he has been  
prevented from building a house on the land. Furthermore, the  
Commission recalls the reasons given by the authorities for imposing  
the restriction in question and the Commission will have to balance  
the applicant's interest and that of the authorities.

The Commission recalls that a subdivision plan was drawn up concerning  
the area in question in 1942 and this plan was confirmed by the  
competent authorities in 1943.  The area was at that time divided into  
a specific number of units.  There has not been any change since then  
in this plan which still provides for a certain amount of units of  
which the applicant purchased the one in question in this case in  
1969.  He received a building permit, built a house on the property  
and moved there in 1970.  The Commission also recalls that as far as  
the applicant is concerned the initial division into a specific number  
of units has subsequently been confirmed by the authorities in that  
the applicant has been forced to become a leaseholder of his property  
since the piece of land could not be legally divided into two  
independent real estate units and by the fact that the authorities  
initially refused to grant the applicant a building permit in 1981 on  
the ground that a splitting up of the unit was not in conformity with  
the subdivision plan and because the site would not be suitable for  
construction due to a great difference in the ground levels of the  
unit.

Furthermore the Commission recalls that a general building prohibition  
was in force from 1972 to 1975.  Accordingly when the applicant first  
bought the land he was fully aware of the subdivision plan and when he  
later sold it and became a leaseholder he was also aware of the  
building prohibition.  Therefore he could not have had any legitimate  
expectations regarding a permission either to divide the unit into two  
or to build one more house on the existing unit.

The Swedish authorities decided to introduce again in 1981 a general  
building prohibition for the area and this prohibition was confirmed  
by the authorities in 1982.  The Commission recalls that the reasons  
for this were the risk of sanitary problems and pollution of the water  
sources.  This prohibition will remain in force until a necessary  
solution to the sewer system has been found either by the landowners  
or by the County authority.  The Commission finds that these reasons  
for the prohibition are free from any arbitrariness and its purpose is  
consistent with what the Commission has found to be a legitimate aim  
in the general interest.  Furthermore the Commission finds that no  
right can be drawn from Article 1 of Protocol No. 1 (P1-1) obliging the  
contracting States to provide the necessary facilities for urban  
development.  It was therefore justified to issue a building  
prohibition which would remain valid until the changes had been made,  
if necessary by the landowners.

In these circumstances the present prohibition on construction cannot  
be considered to be disproportionate to its legitimate purpose and it  
follows that the interference with the applicant's right to peaceful  
enjoyment of his possessions was justified under the second paragraph  
of Article 1 of Protocol No. 1 (P1-1) as being a lawful restriction  
for the control of the use of property in accordance with the general  
interest.

Accordingly the application must be rejected as being manifestly  
ill-founded within the meaning of Article 27 para. 2 (Art. 27-2)  
of the Commission.

## For these reasons, the Commission

## DECLARES THE APPLICATION INADMISSIBLE

Secretary to the Commission         President of the Commission

## (H. C. KRÜGER)                       (C. A. NØRGAARD)