# Europakommissionens beslut den 16 oktober 1986 i målet P. mot Sverige (nr 11306/84)

- Rubrik i HUDOC: P. v. SWEDEN
- Slag: Europakommissionens beslut · språk: engelska · datum: 1986-10-16
- Ansökningsnummer: 11306/84
- ECLI: ECLI:CE:ECHR:1986:1016DEC001130684
- Artiklar (HUDOC): P1-1, 35, 35-1, 6, 6-1, 4, 13, 17, 18
- Slutsats (HUDOC): Inadmissible
- Källa: Europadomstolen (HUDOC), © ECHR-CEDH: https://hudoc.echr.coe.int/eng?i=001-558
- Ratio Lex: https://ratiolex.se/internationell-ratt/europadomstolen/001-558/

Elektronisk version. Den undertecknade texten i domstolens arkiv är den autentiska (art. 44.3 EKMR).

The European Commission of Human Rights sitting in private on  
16 October 1986, the following members being present:

MM. C. A. NØRGAARD, President  
J. A. FROWEIN  
E. BUSUTTIL  
G. JÖRUNDSSON  
G. TENEKIDES  
S. TRECHSEL  
B. KIERNAN  
A. S. GÖZÜBÜYÜK  
A. WEITZEL  
J. C. SOYER  
H. G. SCHERMERS  
H. DANELIUS  
G. BATLINER  
H. VANDENBERGHE  
Mrs G. H. THUNE  
Sir Basil HALL  
Mr. F. MARTINEZ

Mr. H. C. KRÜGER, Secretary to the Commission

Having regard to Article 25 (Art. 25) of the Convention for the  
Protection of Human Rights and Fundamental Freedoms;

Having regard to the application introduced on 13 March 1983 by M.  
P. against Sweden and registered on 10 December 1984 under file  
No. 11306/84;

Having regard to:

-       the report provided for in Rule 40 of the Rules of Procedure  
of the Commission;

-       the Commission's decision of 8 October 1986 to give notice of  
the application to the Government and to invite them to present  
written observations on the admissibility and merits of the complaints  
concerning the length of the proceedings and the lack of an effective  
remedy;

-       the Government's observations dated 5 February 1986;

-       the applicant's observations dated 19 April 1986;

-       the report provided for in Rule 40 of the Rules of Procedure;

Having deliberated;

Decides as follows:

## THE FACTS

The facts of the case, as they appear from the parties' submissions,  
may be summarised as follows:

The applicant is a Swedish citizen born in 1898.  She was formerly a  
forester but is now retired and resides at Ramsele, Sweden. In the  
proceedings before the Commission she is represented by her son Mr.  
Lennart Persson.  He is a road engineer (vägmästare) by profession and  
resides at Märsta, Sweden.

The applicant is the former owner of the forestry estate at which she  
now resides and which is situated at the river Fjällsjöälven.  The  
applicant's two sons are now owners of the estate. The estate has an  
area of 13 hectares.

In 1939, the Royal Water Power Board (Kungliga Vattenfallsstyrelsen,  
subsequently replaced by the present National Water Power Board,  
Statens Vattenfallsverk), which was planning to construct a water  
power station in the area where the applicant lives, concluded an  
easement contract (servitut) with the applicant to the effect that the  
Board had the right to use the river water which formed a part of the  
applicant's estate.  The applicant received 360 Swedish Crowns in  
compensation for this.  Subsequently the applicant has received  
compensation in the amount of 2000 Swedish Crowns for the effects of  
the draining of the river.  In case damage was caused to the  
applicant's property as a result of actions by the Royal Water Power  
Board, it was stated that the applicant should be afforded  
compensation at an amount which could either be agreed between the  
parties or decided by the Water Court (Vattendomstolen).

In a partial judgment of 30 June 1949 the Water Court of Östersund  
granted the Royal Water Power Board a building permit for the  
construction of a water power station between the two rivers  
Ångermanälven and Fjällsjöälven.

By judgment of 28 February 1950 the Water Court ordered that the Royal  
Water Power Board should prepare storage areas (avläggsplatser) for  
the timber during the construction of the power station.

The power station (Kilforsens kraftverk), which was put into operation  
in 1953, had as a result that a distance of 20 kilometres of  
Fjällsjöälven was drained.  The applicant's property was situated in  
this area.  This caused a number of foresters in the area, including  
the applicant, some inconveniences, consisting mainly of increased  
expenses for the operation of the timber business.  The applicant was  
entitled to compensation under the 1918 Water Act (vattenlagen) as  
well as the subsequent 1953 Water Act and this compensation was to be  
decided by the Water Court.

By a partial judgment of 10 April 1953, the Water Court granted the  
Royal Water Power Board permission to take the power station into  
operation.  The Court also ruled on compensation claims related to the  
project.  Moreover, the Court decided, for a probationary period of 10  
years, to adjourn the final examination of the effects of the power  
station on the timber business in the area. The Court appointed an  
expert to investigate the matter further and issued certain  
regulations which were to apply during the probationary period.

In a judgment of 9 September 1953, the Water Court dealt with, inter  
alia, the effect on fishing in the area.  Compensation for losses was  
awarded to the applicant.

On 30 December 1958 the Court awarded the applicant compensation for  
the deterioration of washing and bathing facilities etc.

In a judgment of 1 March 1965 the Water Court decided to adjourn  
further the issue relating to the timber business until the effects of  
the power station on the timber business had been appropriately  
investigated.  The Court also issued similar provisional regulations  
as in the judgment of 10 April 1953.

On 28 April 1965, the Water Court awarded compensation to the  
applicant for detrimental effects on boat traffic and washing.

During the period until August 1970 a number of the affected foresters  
and the Royal Water Power Board agreed on the terms of compensation  
for the increased costs for the timber business.  The Water Court  
confirmed these settlements between the parties in a judgment  
of 21 August 1970.

In October 1970, the National Water Power Board offered the applicant,  
through her lawyer, a sum of 1,930 Swedish Crowns as compensation for  
the increased costs for her timber business.

On 18 October 1971 the National Water Power Board submitted to the  
Water Court a proposal for a final settlement of the remaining issues  
concerning the effects of the power station on the timber business at  
the drained part of the river.  A preliminary hearing was held before  
the Water Court on 14 April 1972.

Subsequently a comprehensive exchange of correspondence between the  
parties took place.

At the request of the Water Court, the National Water Power Board on  
12 January 1973 submitted inter alia a memorandum containing two  
alternative methods of calculating the compensation.

A further preliminary hearing before the Water Court took place on  
14 February 1974.

In the spring of 1974, the applicant through her lawyer was offered  
6,947 Swedish Crowns as compensation by the National Water Power  
Board.  However, in July 1974 the Board informed the applicant's  
lawyer that they were now offering a sum of only 1,780 Swedish Crowns.

In March 1975 the expert who had been appointed by the Water Court on  
10 April 1953 died.  The Water Court decided after having heard the  
parties that there was no need to appoint a new expert.

On 30 December 1976 the National Water Power Board submitted a final  
proposal for the settlement of the outstanding compensation issues.  
The applicant submitted observations on this proposal in a letter of  
8 August 1977.

On 12 August 1977 the National Water Power Board submitted for  
confirmation certain contracts which had been concluded with some  
foresters, and requested that the Water Court should terminate the  
probationary period and, taking the submitted contracts into account,  
finally settle the matter adjourned from 1953.

On 23 and 24 August 1977 the Water Court held the main hearing and in  
that context it visited the area concerned.  In these proceedings, the  
applicant claimed a lump sum of 20,000 Swedish Crowns as compensation,  
a larger storage space for the timber and an improved transport road  
from the storage space.

In a final judgment of 8 March 1978, the Water Court confirmed the  
various contracts and awarded the sum of 8,909 Swedish Crowns to the  
applicant as compensation.  The remaining claims by the applicant were  
rejected.

The applicant and some other foresters appealed to the Water Court of  
Appeal (vattenöverdomstolen).

In a judgment of 26 May 1981 the Water Court of Appeal confirmed the  
judgment in all but one part: the issue regarding the applicant's  
request for a larger storage space was referred back to the Water  
Court for reconsideration.

The applicant appealed against this judgment to the Supreme Court  
(högsta domstolen).  Before the Supreme Court the applicant modified  
her claims and she requested compensation in the amount of 14,303  
Swedish Crowns.  On 15 December 1982, the Supreme Court refused to  
grant leave to appeal.

The issue which was referred back to the Water Court is still pending  
before the Court.

## COMPLAINTS

**1.** The applicant complains under Article 1 of Protocol No. 1  
(P1-1)that she has not received full compensation for the increased  
costs for the timber business as a result of the inconveniences from  
the construction and running of the water power station.  She also  
alleges that in determining the compensation due account has not been  
taken of the inflation.

The applicant also alleges that Article 1 of Protocol No. 1 (P1-1) has  
been breached as a result of the protracted proceedings.

Furthermore, it is alleged that by the judgment of 10 April 1953 the  
applicant acquired a right as a result of the obligation imposed on  
the Royal Water Power Board to let a sufficient amount of water  
through to permit log-floating.  This right ceased in 1958, when the  
Board entered into agreements with the foresters that the logs should  
be transported in other ways.  The applicant alleges that she has  
hereby been deprived of a right in breach of  
Article 1 of Protocol No. 1 (P1-1).

**2.** The applicant also complains that she has not been afforded a  
determination within a reasonable time of the question of compensation  
for increased costs for the timber business.  She also submits that  
the length of the proceedings constitutes an unlawful interference in  
the exercise of her civil rights.  The applicant submits that  
Article 6, para. 1 (Art. 6-1) of the Convention has been violated.

The applicant also alleges a breach of Article 6 para. 1 (Art. 6-1) in  
that the Water Court judge has, for instance at the preliminary  
hearings which preceded the judgment of 8 March 1978, acted as a  
special authority separate from the Water Court, and did not act on  
behalf of the Water Court in its special composition.

The applicant also alleges that there was inequality between the  
parties in the procedure since the opposite party, the Royal Water  
Power Board, was a state organ with resources exceeding those of the  
applicant.

**3.** Furthermore, the applicant alleges a violation of Article 4  
(Art. 4) of the Convention claiming that the compensation paid did not  
cover certain costs for future work with the timber and she therefore  
is subjected to forced or compulsory labour.

**4.** Moreover, the applicant alleges a violation of Article 14  
(Art. 14) of the Convention in that the compensation granted to the  
various foresters differs in an unjustifiable way.  The applicant  
refers mainly to one forester who in spite of having a smaller forest  
obtained a higher compensation than the applicant.

**5.** The applicant also claims that she had no effective remedy  
available to her and that there has therefore been a violation of  
Article 13 (Art. 13) of the Convention.

The applicant also requests that the Commission examine whether the  
organs for which the State is responsible have to apply the provisions  
of the Convention directly which the applicant considers to follow  
from inter alia Articles 13 and 26 (Art. 13, art. 26) of the  
Convention.

**6.** The applicant furthermore states that the public interest was  
provided for in the building permit granted in 1949 and that the  
various acts - or omissions - of the National Water Power Board which  
took advantage of the two suspension judgments aimed at the  
destruction of her rights as set forth in the Convention.  In this  
respect, the applicant invokes Articles 17 and 18 (Art. 17, art. 18)  
of the Convention.

**7.** Finally, the applicant's sons allege that the question which  
was referred back to the Water Court by the judgment of the Water  
Court of Appeal of 26 May 1981 has not been dealt with within a  
reasonable time.

## PROCEEDINGS BEFORE THE COMMISSION

The application was introduced on 13 March 1983 and registered  
on 10 December 1984.

On 8 October 1985 the Commission decided to give notice of the  
application to the Government and to invite them to present their  
written observations on the admissibility and merits of the  
application limited to the complaints concerning length of proceedings  
and the lack of an effective remedy.

The Government's observations were received by a letter of 5  
February 1986 and the applicant's observations in reply were dated 19  
April 1986.

## SUBMISSIONS OF THE PARTIES

A. The Government

1. Legislation relevant to the complaint

The Swedish legislation governing the erection of constructions in  
water is based on the principle that water is to be used as a natural  
resource, but that opposing interests are to be taken into  
consideration in the matter of exploitation.  The most significant  
consequences of the requirement that opposing interests should be  
taken into consideration are that a permission is required for all  
exploitation of water, and that property owners are to be compensated  
for damages and encroachments caused by the exploitation.

In view of the facts of the applicant's case and the position taken by  
the Government, only a few remarks need to be made as regards the  
procedure by which determination of compensation claims are made.

The legislation governing the applicant's case is basically  
the 1918 Water Act, which is now replaced by the 1983 Water Act.

Applications for permission to build in water, as well as questions  
concerning compensation for damages and encroachments resulting from a  
project, are considered and decided upon by six special courts, called  
water courts, each of which serves a certain geographical area.  These  
courts constitute an integral part of the corresponding number of  
general district courts of first instance, although, when serving in  
the capacity of water courts, they are composed so as to include  
technical experts (Chapter 11, Section 21 of the 1918 Act).  Like the  
chairman of a general court, the chairman of a water court, in his  
capacity of water rights judge, is empowered to take decisions on  
certain, mainly procedural, questions explicitly specified in the  
Water Act.

Decisions and judgments by a water court or a water rights  
judge may, with a few exceptions that are not relevant to the  
applicant's case, be appealed to the Water Court of Appeal.  This  
court forms an integral part of a general Court of Appeal, the Svea  
Court of Appeal, although composed so as to include technical experts.  
Decisions and judgments of the Water Court of Appeal may ultimately,  
subject to rules requiring leave of appeal, be brought before the  
Supreme Court.

The procedure in the courts is only partly regulated in the Water Act.  
As regards procedural questions that are not dealt with in this Act,  
Chapter 11, Section 1 of the Act provides that the rules governing the  
procedure in the courts of general jurisdiction shall be applied.  
According to Chapter 49, Section 6 of the 1942 Code of Judicial  
Procedure (rättegångsbalken), which governs the procedure in the  
latter courts, a party may appeal from a decision by a court of first  
instance if, in the party's opinion, the decision results in an  
unnecessary delay in the final determination of the case.  This right  
to appeal is, according to Chapter 52, Section 1 of the Code of  
Judicial Procedure, not subject to any time limit.

2. The Facts

Since the case primarily turns on the question whether this claim for  
compensation has been determined "within a reasonable time", the  
Government draw attention to the following circumstances for the  
purpose of indicating the considerable proportions, as regards the  
quantity as well as the quality, of the issues involved in a project  
like in the present case.

2.1 General description of the power plant

The Kilforsen power plant is one of the largest hydro-electric power  
stations in Sweden.  It is situated between the rivers of  
Fjällsjöälven and Ångermanälven.  The volume of discharge is 350 cubic  
metres per second and the height of the fall is 99 metres.  The power  
plant came into operation in 1953.  It was constructed by the National  
Water Power Board, which also operates the station.

The Fjällsjöälven is a tributary to the Ångermanälven.  Before  
joining, the two rivers run more or less parallel for a distance of 6  
- 8 kilometres in a generally north to south direction, the  
Fjällsjöälven running west of the Ångermanälven.  At Imnäs in the  
Fjällsjöälven, about 20 kilometres upstream from where it joins the  
Ångermanälven, the Imnäs dam was built.  Water from the Fjällsjöälven  
is brought from this dam to the power plant via a two kilometre long  
canal and a 3.7 kilometre long tunnel.  Upstream from the power plant,  
an artificial lake has been constructed for use as a supply reservoir.  
A discharge tunnel, 2.7 kilometres long, leads from the power plant to  
the Ångermanälven.  A dry channel, almost 20 kilometres long and  
formed by the damming, leads from a point below the Imnäs dam to the  
point where the Fjällsjöälven previously joined the Ångermanälven.  
This dry channel is one of the longest in the country and definitely  
the longest to be found in fertile agricultural and forest land.  
Several artificial pools have been built in the dry channel.

The power plant has been so designed as to make timber floating  
possible from the Imnäs dam to the Ångermanälven via an inlet tunnel,  
the above mentioned canal and supply reservoir, and a log flume.  
Moreover, the artificial pools are so designed as to allow floating in  
the dry channel when water is released for this purpose from the Imnäs  
dam.

The damming area of the Imnäs dam, i.e. the stretch of the river and  
its tributaries upstream from the dam which are affected by the  
damming, is 40-50 kilometres long.  For better utilisation of the  
water, the National Water Power Board has also requested, and been  
granted, permission to regulate the level of the water in the river  
system and in some lakes of the damming area both on a 24-hour basis  
and throughout the year.  As a result of these regulations, a  
continuous change in the water level adversely affects the  
surroundings.

Downstream from the Kilforsen power plant is another power plant,  
Nämnforsen.  The damming area of the Nämnforsen power plant extends  
past the point where the above mentioned discharge tunnel from the  
Kilforsen power plant runs into the Ångermanälven.  Claims relating to  
damage caused to properties in the Kilforsen area by the erection and  
operation of the Nämnforsen power plant have been merged with the  
claims settlement process related to the Kilforsen power plant.

Several hundreds of property owners have been affected by the erection  
and operation of the Kilforsen power plant.  The extent of the damages  
and encroachments caused by the project varies from property to  
property.  Practically all properties have been affected in several  
respects.  Examples of damages and encroachments incurred are  
detrimental effects on fertile agricultural and forest land or other  
land of particular value, such as gravel-pits, on timber business and  
timber floating, on buildings, fences and basis, on fishing, boat  
traffic, bathing and washing facilities, and on winter routes on the  
ice.

It has not been possible to deal with all the damages and  
encroachments caused to the different properties in one context.  The  
reason for this is not only the large number of claims, but also, and  
mainly, the difficulty or impossibility of judging in advance the  
extent of damages and encroachments which may ultimately be caused to  
property.  Varying weather conditions, precipitation and flows must be  
observed for a long time, often for several years, to make an  
assessment of both normal and extreme situations.  In addition, an  
evaluation must be made of the results of various preventive measures.  
Owing to all these factors, the settlement of claims must of necessity  
be a rather long-drawn-out matter when it comes to a project of the  
size and character of the Kilforsen power plant.

After the National Water Power Board received permission on  
30 June 1949 to erect the Kilforsen power plant, the Water Court has  
passed about 25 judgments pertaining to the effects of the project on  
various properties.  The Court has in the course of the proceedings  
held a number of preliminary hearings and also, as regards several  
issues, in accordance with the desire of the parties and under a  
provision of the Water Act ordered special expert investigations for  
the purpose of assessing the damages and encroachments resulting from  
the project. As will be further developed below, continuous claims  
proceedings have in fact been in progress until the judgment passed by  
the Water Court on 3 August 1978.  During this period, i.e. from 1949  
to 1978, claim after claim has been settled either by voluntary  
agreement between the parties, subsequently confirmed by the Court, or  
by a decision of the Court.

2.2     Chronological list of judgments in the Kilsforsen Case

For the purpose of giving an idea of the extensive activity which has  
taken place over the years in order to adjudicate the claims related  
to this power plant project, the Government refer to a chronological  
list, briefly presenting the judgments rendered in the Kilforsen case.  
As appears from this list, the Water Court has during the years  
following the granting of the permission to erect the power plant been  
continuously engaged in adjudicating claims related to the project.  
It is emphasised that most of these claims naturally have been of a  
complicated nature and, therefore, extremely time consuming. Due to  
the time that has elapsed since the permission was granted and the  
considerable number of different claims that have been adjudicated  
over the years, the Government point out that there might have been  
judgments or decisions in addition to those here listed which have not  
been brought to the Government's knowledge.

2.3     Judgment of particular interest to the applicant's case

In the judgment of the Water Court of 10 April 1953, by which the  
National Water Power Board was granted permission to take the power  
plant into operation, the Water Court also ruled on compensation  
claims related to the project, among them those concerning the timber  
business.  As to the latter claims, the Court found, in accordance  
with the view expressed by an expert, previously appointed by the  
court, and the parties concerned, that they were closely related to  
the question of the effects of the project on timber floating and that  
these effects could not be estimated at this time.  In view of this,  
the Court decided to postpone the final determination of the claims  
related to timber business pending the outcome of the investigations  
and deliberations necessary as regards timber floating.  As to the  
claims related to timber floating the Court postponed the final  
determination for a period of ten years.

As regards the compensation claims related to the timber business, the  
Court also ordered a number of provisional measures pending the final  
determination.  Of particular relevance to the applicant's case is  
that the Court ordered the National Water Power Board to provide for  
satisfactory timber collecting facilities and to compensate, on an  
annual basis, the increased costs, including accrued interest, on the  
timber business resulting from the project.  The Court furthermore  
observed that in case the parties could not agree on the annual amount  
due, the question could be referred to the Court for determination.  
No appeal was made against the judgment.

In a judgment of 9 September 1953, the Water Court dealt with, inter  
alia, the effect of the project on fishing in the drained area.  
Compensation for losses was awarded, among others, to the applicant.

By the judgment of the Water Court of 30 October 1958, the applicant  
was awarded compensation for the deterioration in washing and bathing  
facilities, for fences, and for inconvenience suffered during the  
construction period.  In the same judgment the court dismissed her  
claims for compensation for general encroachment as well as certain  
claims concerning, inter alia, alleged damage to her land and  
buildings.

In the judgment of 1 March 1965, the Water Court reconsidered the  
claims related to the timber business.  The court again observed that,  
due to the close relationship between these claims and questions  
concerning timber floating, the claims could not be finally determined  
without taking into consideration the possible outcome of the  
deliberations that were still being made as regards floating.  The  
Court also noted that these deliberations were being made, and crucial  
decisions might be taken, outside the scope of the court proceedings.

In view of this, and while observing that no objection on this point  
had been made by any party concerned, the Water Court decided to  
further postpone the final determination of the compensation claims  
related to the timber business.  The Court also accordingly prolonged  
the provisional measures ordered in its judgment of 10 April 1953. No  
appeal was made against the judgment.

In the judgment of the Water Court of 28 April 1965, the applicant was  
awarded compensation for detrimental effects on boat traffic and  
washing, including interest accruing since 1953.  In the same  
judgment, claims concerning fences and an infiltration well were  
dismissed or rejected.

The final judgment of the Water Court was rendered on 8 March 1978.  
Prior to this judgment, the National Water Power Board had, on 18  
October 1971, made a proposal concerning compensation for the claims  
related to the timber business.  The proposal caused objections from  
some of the counterparties.  A preliminary hearing was held before the  
Water Court on 14 April 1972.  The National Water Power Board  
submitted complementary material on 28 April of the same year and on  
12 January 1973.  Further objections were raised by the counterparties  
and there were also written communications directly between the  
parties.  A preliminary hearing was, again, held on 14 February 1974,  
subsequent to which a number of voluntary agreements on the claims  
were concluded.

On 30 December 1976, the National Water Power Board clarified its  
final position and requested the Water Court to finally determine the  
claims.  Objections as regards the position taken by the Board were  
made by the applicant in a petition dated 8 August 1977.  Having  
considered the issues involved, the Water Court rendered its final  
judgment on 8 March 1978.

The judgment was appealed to the Water Court of Appeal by, among  
others, the applicant.  In an account of the litigation costs as  
regards the proceedings in the court below, the counsel for, among  
others, the applicant made some statements that, in the Government's  
view, appear to throw some light on the proceedings as far as the  
group of claimants represented by this counsel is concerned.  Thus, in  
respect of the time during which the claims were pending before the  
Water Court, the work performed by the counsel was said to have been  
aimed at a settlement of the claims outside the court.  It was also  
pointed out that these claimants, a rather limited group in relation  
to the total number of claimants originally involved, had been at  
variance with the vast majority of claimants, which seems to have  
complicated the handling of these claims.

Furthermore, as regards the said counsel's claim for compensation for  
litigation costs in the Water Court of Appeal, the Government draw  
attention to the following passage of the Court's reasoning concerning  
this claim: " ...  The bills of costs include 70 items, of which 19  
refer to requests for, or receipt of notification concerning,  
adjournments for taking measures.  The Water Court of Appeal is of the  
opinion that the great number of adjournments which have contributed  
to the length of the proceedings before the Water Court of Appeal,  
should be taken into account as a factor leading to a reduction of the  
fee ... ".

In its judgment of 26 May 1981, the Water Court of Appeal, while  
confirming the remaining parts of the judgment of the Water Court,  
referred to the latter court for further consideration the issues  
concerning one of the disputed timber collecting facilities.

As regards the claims thus referred to, and still pending before, the  
Water Court, the Government submit the following information from the  
said court.  In 1984, none of the parties having petitioned the Court  
to have the claim determined, the Water Court notified the parties  
that the claim was still pending.  In September 1984, the National  
Water Board petitioned the Court and requested that a final decision  
be taken.  In December 1984, the applicant, when responding to the  
petition of the Board, presented a number of claims relating to  
questions that had already been finally determined in judgments that  
had gained legal force.  After the applicant had changed her counsel  
and restricted her claims to come within the scope of the proceedings,  
a main hearing was held in July 1985.  Subsequent to the hearing, the  
parties concerned have notified the Court that discussions are in  
progress as regards a new timber collecting facility on a more  
favourable location.  It appears as if this notification is the only  
reason why the Court is still withholding its final determination of  
the claim.

The applicant, among others, appealed against the judgment of the  
Water Court of Appeal to the Supreme Court.  In the first petition to  
this Court of 13 June 1981, the complainants requested an adjournment  
for stating the grounds for the complaint until 30 September 1981.  In  
a petition of 30 November 1981, the complaint was limited to the  
question of increased costs as regards the timber business.  In this  
petition, a request was also made for another adjournment, until  
31 January 1982, for further clarifying the complaint as regards one  
of the complainants.  On 21 November 1982, one of the complainants  
withdrew his complaint, and the remaining ones stated their final  
positions as regards the complaint.  In a decision of 15 December of  
the same year, the Supreme Court refused to grant leave of appeal.

In this context, it should finally be observed that the considerations  
concerning timber floating ultimately resulted in a gradual  
discontinuation of timber floating in the area concerned, the last  
floating season being the summer of 1982, and that the Government on  
16 September 1982 closed the river system as a public floatway.

3. Exhaustion of domestic remedies

The domestic remedy rule is founded on the idea that, before a  
complaint could be considered by the Commission, the respondent State  
should have an opportunity to correct, by its own means and within the  
framework of its own legal system, the wrong allegedly suffered by an  
applicant.  In the case-law of the Commission, this has consistently  
been construed to mean that, for the domestic remedies to be  
exhausted, it is not enough to have exhausted these remedies as  
regards some aspect of an applicant's case, but the particular  
complaint brought before the Commission must have been raised before  
the competent domestic courts or authorities.

As regards the present case, the applicant has not at any time during  
the lengthy proceedings made any objection indicating that, in her  
opinion, the proceedings were being unnecessarily protracted.  On the  
contrary, the two judgments of 1953 and 1965 respectively, by which  
the Water Court decided to postpone the final determination of the  
issues concerning the timber business, seem to have been rendered, as  
far as the postponement of the final determination of the compensation  
claims is concerned, with the consent of the parties involved.

Furthermore, none of these judgments were appealed against, although  
this could have been done.  Moreover, the applicant could, regardless  
of these judgments of 1953 and 1965, at any time during the  
proceedings have required the Water Court to make a final  
determination of her claims and, in case the Water Court had rejected  
this request, she could have appealed to the Water Court of Appeal in  
accordance with the provision in Chapter 49 Section 6 of the Code of  
Judicial Procedure.

In view of the above, the Government submit that, as regards the  
allegation that the compensation claims have not been determined  
within a reasonable time, the applicant has not exhausted domestic  
remedies as required by Article 26 (Art. 26) of the Convention.

4. Article 6 (Art. 6) of the Convention : "Reasonable time"

In the Government's view, there are three different aspects that need  
to be examined when considering whether the applicant's compensation  
claims were determined within a reasonable time. Firstly, the time has  
to be viewed in light of the number and complexity of the issues  
involved.

Secondly, the degree of inconvenience suffered by the applicant as a  
result of the alleged delay needs to be taken into consideration.  
Thirdly, the question whether the length of the proceedings is  
reasonable or not necessarily has to be viewed in light of the manner  
in which they were conducted by the applicant herself. The Government  
will in the following deal with these three aspects one by one.

As to the first aspect, the Government observe that the final  
determination of the claims involved in the present project of  
necessity has to be viewed as a long-range commission.  This is so  
because of the significant proportions of the project and the  
considerable number and complexity of the claims involved, a great  
deal of which could not be finally determined without considering  
future contingencies.  In this context, the Government draw attention  
to the fact that the Water Court, during almost thirty years following  
the granting of the permission to erect the power plant, was  
continuously engaged in the process of adjudicating claims related to  
the project.  Although this might seem to be a remarkably long period  
of time, in the Government's opinion, there is nothing in the  
documents presented to suggest that the process, viewed in its  
entirety, has been unduly protracted.

The applicant's claims were particularly complicated by the fact that  
they were so closely related to timber floating and that the floating  
was subject to a long-range investigation concerning its future  
existence.  In view of this, the Water Court in its judgment of  
10 April 1953 took the position of principle that the final  
determination of these claims should be postponed pending the outcome  
of the investigation as regards timber floating, and that in the  
meantime the damages and encroachments were to be compensated on an  
annual basis. In the Government's opinion, the view thus taken by the  
Water Court seems reasonable, and it appears to have been shared by  
all parties concerned, including the applicant.

In the judgment of 1 March 1965 the Water Court found that there was  
still considerable uncertainty as regards the outcome of the  
considerations on timber floating and that, therefore, the final  
determination of the compensation claims related to the timber  
business should be further postponed.  No other view was expressed by  
any of the parties concerned.

It does not appear from the documents presented to the Government at  
what time the investigation of timber floating had proceeded so far as  
to enable the Court to draw the conclusions necessary for the final  
determination of the compensation claims related to the timber  
business.  The Government observe, however, that timber floating in  
the waters concerned was not terminated until 1982.

In view hereof the Government maintain that there is nothing in the  
complaint, or in any other document presented to the Government, to  
suggest that the applicant's compensation claims have been at all  
unnecessarily protracted.

As to the second aspect, i.e. the degree of inconvenience suffered by  
the applicant, the Government draw attention to the following facts.

In its very first judgment of 30 June 1949 the Water Court decided  
that, as regards the timber business, the increased costs resulting  
from the power plant project were to be compensated on an annual  
basis, and that disagreements as to the amount due each year could be  
referred to the Water Court.  More elaborate decisions on this  
question were taken by the Court in a number of judgments rendered  
during the years of 1950-1978, most particularly in the judgments of  
10 April 1953 and 1 March 1965.

The practical result of these judgments was that during all years the  
applicant was fully compensated on an annual basis for any economic  
loss resulting from the power plant project.  In view of this, the  
Government submit that the possible inconvenience following from the  
uncertainty as regards the final lump sum compensation for estimated  
future losses could not have been such as to render the postponement  
of its final determination unreasonable.  This is particularly so,  
since the possible magnitude of this final compensation was reasonably  
foreseeable in view of the court's considerations as regards the  
previous annual compensations and its final determinations of a large  
number of corresponding claims of others than the applicant.

As regards the third aspect, i.e. the manner in which the proceedings  
were conducted by the applicant herself, the Government observe that  
the claims for compensation involved were such as to admit their  
settlement by the parties themselves outside the Court.  This also  
appears to have been the principal strategy of the applicant.  Because  
of this, there was no responsibility of the Water Court to take any  
steps for the purpose of expediting the proceedings.  On the contrary,  
in view of the character of the claims, it might even have been  
inappropriate for the Court to do so unless required by a party.

As has already been observed above, there is no indication whatever  
that the applicant at any time during the proceedings petitioned the  
court to have her claims for compensation finally determined.  There  
are, on the other hand, indications that the final determination might  
have been considerably protracted for reasons entirely related to the  
applicant herself or her counsel.  As has been indicated above, more  
than one fourth of the items listed in the counsel's account before  
the Water Court of Appeal of the litigation costs, seems to have  
referred to measures taken in respect of requests, on behalf of, among  
others, the applicant, for adjournments for taking steps necessary to  
bring the proceedings forward. Furthermore, when appealing the case to  
the Supreme Court, the applicant allowed herself five and a half  
months to state the basis for her claims and another year to finally  
specify them.  It should also be observed that the Water Court's final  
determination of the applicant's compensation claims of 8 March 1978  
was made in response to a request, not by the applicant, but by her  
counterparty.

In view of this, the Government submit that there has been no  
violation of the applicant's right to a determination of her claims  
within a reasonable time within the meaning of Article 6 para. 1  
(Art. 6-1) of the Convention.

5. Article 1 of Protocol No. 1 (P1-1)

On the same grounds as those referred to under 4. above, the  
Government submit that there has been no violation of the applicant's  
right under Article 1 of Protocol No. 1 (P1-1).

6. Article 13 of the Convention (Art. 13)

In accordance with what has been stated above, the judgments of the  
Water Court of 10 April 1953 and 1 March 1965, by which the final  
determination of the compensation claims was postponed, could have  
been appealed to the Water Court of Appeal and, ultimately, to the  
Supreme Court.  Furthermore, the applicant could have, regardless of  
these judgments, at any time during the proceedings requested a final  
determination of her claims, a rejection of which request would have  
been subject to appeal in accordance with the provision of Chapter 49  
Section 6 of the Code of Judicial Procedure.

In the Government's opinion there is no reason to consider any of  
these remedies as not being effective within the meaning of the  
Convention.  Consequently, the Government submit that the applicant  
had effective remedies as required by Article 13 (Art. 13) of the  
Convention.

7. The issue of storage space which is still pending before the  
Water Court

The Government submit that the grounds referred to above are equally  
relevant in respect of the present question.  The Government emphasise  
that none of the parties concerned had taken any steps to bring the  
proceedings forward until the applicant's counterparty in  
September 1984 petitioned the Court to have the question finally  
determined, that the proceedings were then delayed due to negligence  
entirely assignable to the applicant or her counsel, and that since  
July 1985 the final determination appears to have been withheld only  
because the parties jointly are re-negotiating the dispute.  In view  
of this, the Government submit that there has been no violation of  
Article 6 (Art. 6) of the Convention.

**8.** The Admissibility

The Government have no objection to the admissibility as far as the  
six months' rule of Article 26 (Art. 26) is concerned.

However, the Government submit that the application should be rejected  
on the ground that the applicant has not exhausted domestic remedies  
as required by Article 26 (Art. 26) of the Convention or,  
alternatively, for reasons which will be elaborated below, that it  
should be rejected ratione materiae for falling outside the scope of  
the Convention or for being manifestly ill-founded.

9. The merits

As regards the parts of the complaint on which the Government has been  
invited to submit their observations, the applicant has alleged  
violations of Article 6 (Art. 6) of the Convention and  
Article 1 of Protocol No. 1 (P1-1) on the ground that, as a result of  
the protracted proceedings, she has been deprived of her rights under  
the said Articles, and of Article 13 (Art. 13) of the Convention on  
the ground that she has not had an effective remedy in respect of  
these alleged violations.

The Government observe that the claims concerning damages and  
encroachments on the timber business were before the Water Court in  
the proceedings resulting in the judgment of 10 April 1953. During the  
proceedings, the applicant consented to the principal approach of  
having the final determination of the claims postponed pending the  
outcome of the investigations as regards timber floating. Judgment was  
rendered on 10 April 1953, as far as these claims are concerned, in  
accordance with the position thus taken by the applicant before the  
Court.  The judgment was not appealed against, and entered into force  
on 24 April 1953.  It is not even alleged by the applicant that the  
contingencies, on which the final determination of the claims thus was  
made dependent, did ever occur prior to the rendering of the final  
judgment on 8 March 1978.

In the Government's opinion, it could be questioned whether at all the  
Convention, which entered into force on 3 September 1953, could be  
construed so as to guarantee any right in respect of court proceedings  
pending at the time the Convention entered into force.

Assuming, however, that such a guarantee could be read into the  
Convention, the Government, nevertheless, submit that such an  
interpretation could by no means be viewed to include any right, which  
prior to the Convention's entry into force had been effectively waived  
in court proceedings and, although merely as to its principle, ruled  
on accordingly by the court in a judgment which had gained legal  
force.  In view of this, the Government submits that the complaint in  
its entirety falls outside the scope of the Convention.

In case the Commission does not share this view, the Government submit  
with reference to their considerations as accounted for above, that as  
regards Article 6 (Art. 6) of the Convention and

Article 1 of Protocol No. 1 (P-1) the application is manifestly  
ill-founded. The Government also submit that the complaint under  
Article 13 (Art. 13) of the Convention is manifestly ill-founed.

10. Conclusions

The position of the Government is, concerning admissibility, that the  
application should be declared inadmissible on the ground that the  
applicant has not exhausted domestic remedies or, alternatively, for  
falling outside the scope of the Convention or for being manifestly  
ill-founded, and concerning the merits, that there has been no  
violation of the Convention or the First Protocol.

B. The Applicant

1. The Facts

The applicant submits that the amount of compensation which was fixed  
in the judgment of 10 April 1953 is without interest from many points  
of view, in particular since the applicant never received any such  
compensation.

The applicant points out that it took until 1971, i.e. 22 years after  
the permit was granted, before the National Water Power Board was able  
to present an investigation, which was so inadequate that the Water  
Court had to order that the Board should improve and complete the  
investigation which was done in 1973.

It was only in 1976 that the National Water Power Board adopted its  
final position in the case.  This is to be seen in connection with the  
fact that at that time only a few persons concerned were still parties  
to the proceedings, not having voluntarily made agreements with the  
Board.

The applicant submits that she has all through the proceedings made  
reasonable demands.  The allegation that the applicant had complicated  
the proceedings is a conclusion which cannot be drawn from the factual  
circumstances of the case.  It is the National Water Power Board which  
has the responsibility for the investigation and which completely  
influences the time of the proceedings.  Moreover, the Board should  
take measures which prevent future damages.  These must be terminated  
before the Court can assess the compensation to be awarded. The  
allegation that the applicant and others have complicated the  
proceedings rather appears to be derived from the Board's opinion.

The applicant points out that the statements by the Water Court of  
Appeal in respect of counsel's claim for costs have nothing to do with  
the period from 1949 to 1978, which is the period at which the  
applicant is mainly aiming.

As to the decisions on adjournment taken by the Water Court of Appeal,  
the applicant observes that it is not a simple task for a private  
person to make a technical investigation about the effects and damages  
to a property such as the one at issue here.  The applicant needed  
eleven months to make the investigation, whereas the Board needed  
three months to reply, a reply which only resulted in a statement that  
the investigation gave an unreasonable outcome.  In one respect,  
however, the applicant's investigation was of significance since it  
led to the case being partly referred back to the Water Court.

As regards Swedish law and practice in respect of an issue which has  
been referred back to a lower court, the applicant submits the  
following.

The question whether the lower court should take up ex officio a case  
which has been referred back to it is not regulated in the Code of  
Judicial Procedure.  If a decision on referral contains a clause that  
the case should be taken up on request of a party such a clause is  
valid.  In the commentary to Chapter 50 Section 29 of the Code of  
Judicial Procedure it is said that it is appropriate to order the  
lower court to take up the case ex officio and to take necessary  
measures for the future proceedings.  If nothing is said in the  
decision it appears that the position is that the lower court should  
ex officio take measures to continue the proceedings.  A decision to  
refer a case back to a lower court is binding on the lower court  
insofar as it must take a new decision in the case.

In addition to the above, it is a rule that all District Courts should  
have internal Rules of Procedure.  In such rules it is normally  
provided that cases which have been referred back to the Court should  
be dealt with swiftly.  However, the applicant has not been able to  
ascertain whether the Water Court of Östersund has such rules.

The Government's statement that, in 1984, no party had requested the  
Court to terminate the proceedings is incorrect.  Nor is the statement  
that the Court should have notified the parties in 1984 correct.  The  
applicant submits that the Court has been contacted over the telephone  
on several occasions with a request that the case be dealt with.  
During these telephone contacts the applicant has received different  
information, on one occasion the case was said to have been terminated  
already while on another occasion the intention was to join the case  
with another one.

The submission of the Government that the applicant in a letter to the  
Water Court has raised issues which have already acquired legal force  
is not wholly correct.  The only issue which was raised and which was  
finally determined was the question of the road. However, in case the  
storage space must be enlarged or if the timber should be transported  
by lorry - which will be the case - it will be necessary to reconsider  
the issue of the road irrespective of the fact that it has formally  
acquired legal force.  The applicant maintains that this explains the  
applicant's position before the Water Court.

The applicant questions, however, why the court has not, despite the  
applicant's requests, taken up the case again.  The applicant also  
submits that the reasons for which the Water Court has issued a notice  
to the public (kungörelsedelgivning) in the case, and the manner in  
which this was done, are inconsistent with Swedish law.

Moreover, the letter from the applicant of December 1984, to which the  
Government refer, has not even been answered by the National Water  
Power Board.  it is not even known whether the Water Court has asked  
the Board to state its views on the letter.  The Court has been silent  
up to the end of June 1985 when it suddenly summoned the applicant to  
a main hearing within 14 days.  Thereafter there has been an exchange  
of written submissions between the parties.  However the National  
Water Power Board has not yet produced the necessary investigations.

2. Exhaustion of domestic remedies

Whether a remedy should have been tried by an applicant must be  
determined on the basis of all the circumstances of a case.  
Furthermore, it must be a condition that the applicant should have had  
a factual possibility to achieve a different decision before he  
appealed against the judgments concerning postponement or requested  
the termination of the test period.

The applicant maintains that an appeal against the judgments of 1953  
and 1965 would not have resulted in any change.  The applicant submits  
that the number of postponement judgments in so-called water cases has  
been 35 to 50 during the 1960s and 1970s.  Several of these cases  
started in the 1940s and 1950s.  More than 75% of the cases were dealt  
with by the Water Court of Östersund.  In many cases more than 100  
judgments have been delivered and on the spot visits have been held  
175 times.  The reasons for the postponements are issues of timber  
floating and so-called annexed interests.  In Stockholm, where no such  
issues have arisen, there have only been about 10 to 15 judgments  
during the whole period of the dealing with a case.  In the  
applicant's opinion this shows the existence of a clear practice.

As regards the proposal to ask for the termination of the test period  
the applicant submits that such a procedure is only possible where new  
facts have arisen, such as that a party enters into an agreement with  
the National Water Power Board.

The Water Court must ex officio examine whether the conditions for a  
postponement are at hand.  The National Water Power Board has the  
complete responsibility for the investigation of the case.  Moreover  
the Water Court shall ex officio determine whether the conditions for  
terminating a case are at hand.  The measures to prevent damages were  
not made in 1965 and they are not yet terminated.  An expert was  
appointed by the Court and the postponement was tied with the issues  
on floating, which were subject to a special investigation outside the  
actual water case proceedings.  Nor did the measures to prevent  
damages concern exclusively the applicant.

The applicant cannot accept that the remedies to which the Government  
refer are effective.  The basis for the whole water case proceedings  
would be taken away if the procedure indicated by the Government was  
to be followed.  The Water Courts would be obliged to hold main  
hearings 24 hours a day during the whole year without being able to  
cut down their backlogs.  The only way to reduce the length of the  
proceedings is that the Court put pressure on the National Water Power  
Board to see to it that it produces quicker investigations and  
implements the measures to prevent damages more quickly.

The applicant submits that the dealing with her case has been such  
that the facts on which the final determination was dependent did not  
occur until the National Water Power Board primarily implemented the  
measures to prevent damages and finally stated its position in the  
case.

Finally, if the Government allege that there exists a remedy which is  
effective they ought to prove this allegation by referring to case-law  
indicating that a party has successfully availed himself of the remedy  
in question.

The applicant concludes that there has been a violation of  
Article 6 (Art. 6) of the Convention and Article 1 of Protocol No. 1  
(P1-1).

## THE LAW

1. The applicant alleges violations of the Convention in several  
respects in relation to the proceedings as such, and the outcome of  
those proceedings, which concerned claims relating to the effects on  
the applicant's property of the construction and running of the  
Kilforsen power station.

2. The Commission will first examine the complaints relating to  
the proceedings as such.  In this respect the applicant complains that  
the proceedings have been excessively lengthy and that the requirement  
of a determination "within a reasonable time" in Article 6 (Art. 6) of  
the Convention has not been respected.

Article 6 para. 1 (Art. 6-1) first sentence of the Convention reads:

"In the determination of his civil rights and obligations or of any  
criminal charge against him, everyone is entitled to a fair and public  
hearing within a reasonable time by an independent and impartial  
tribunal established by law."

The applicant also complains that as a result of the protracted  
proceedings there has been a breach of Article 1 of Protocol No. 1  
(P1-1) which guarantees the right to peaceful enjoyment of possessions.

The Government submit that this complaint is inadmissible for failure  
to exhaust domestic remedies.

The Commission must first decide on its competence ratione temporis to  
consider the applicant's complaints.

In accordance with the generally recognised principles of  
international law, the Convention is binding on the Contracting  
Parties only in respect of facts occurring after its entry into force.  
The Convention entered into force on 3 September 1953.

In previous case-law, the Commission has stated that where the facts  
consist of a series of legal proceedings, the date of entry into force  
of the Convention has the effect of dividing the period in two, the  
earlier escaping the Commission's temporal jurisdiction.  On the other  
hand where a court gives judgment after the entry into force of the  
Convention, the Commission is competent to ensure that the proceedings  
leading up to this judgment were in conformity with the Convention, as  
the proceedings before a court are embodied in its final decision  
which thus incorporated any defect by which they may have been  
affected (see No. 8261/78, Dec. 11.10.79, D.R. 18, p. 150).

It follows that the Commission cannot as such examine under the  
Convention the proceedings and judgments delivered prior to the entry  
into force of the Convention, i.e. 3 September 1953.  With respect to  
the complaint that the procedure did not comply with the condition of  
"reasonable time" in Article 6 (Art. 6), the Commission must take as  
starting point the date of 3 September 1953 and the state of the  
proceedings as they were on that date.

The Commission must next decide whether the applicant, in respect of  
the complaint that the proceedings failed to meet the condition of  
"reasonable time" in Article 6 (Art. 6), has complied with the  
condition in Article 26 (Art. 26) of the Convention as to the  
exhaustion of domestic remedies.

The Government have submitted that the applicant has not exhausted  
domestic remedies and have referred to the fact that she did not  
appeal against the judgments of the Water Court of 1953 and 1965 by  
which the Court decided to postpone the final determination of the  
issues in the case, and that she did not at any time during the  
proceedings request the court to determine the case finally.  If such  
a request had been unsuccessful, the applicant could have appealed in  
accordance with Chapter 49 Section 6 of the Code of Judicial  
Procedure.

Chapter 49 Section 6 of the Code of Judicial Procedure provides that a  
party, who is of the opinion that a decision of a lower court  
unnecessarily delays the proceedings, has the right to appeal against  
such a decision.  Such an appeal is according to Chapter 52 Section 1  
of the Code not limited in time.

It is established in the present case that the applicant has not  
brought any such appeal to the Water Court of Appeal.  The Commission  
considers that an appeal by the applicant under Chapter 49 Section 6  
of the Code of Judicial Procedure would in substance be similar to the  
allegation she now makes before the Commission, namely that the  
proceedings have not been terminated within a "reasonable time".

The Commission is therefore of the opinion that the remedy provided  
for in Chapter 49 Section 6 is a domestic remedy in respect of a  
complaint of lengthy proceedings under Article 6 (Art. 6) of the  
Convention.

However, Article 26 (Art. 26) of the Convention only requires the  
exhaustion of remedies which can be regarded as "effective".  It would  
for instance not be necessary to exhaust a remedy in respect of which  
it could be clearly said that it would be meaningless to pursue.  The  
applicant submits that the remedies referred to by the Government are  
not effective.  However, the Commission cannot find from the  
submissions of the parties that an appeal under Chapter 49 Section 6  
of the Code of Judicial Procedure would have been without any effect  
as to the length of the proceedings.

The Commission concludes that the remedy referred to in Chapter 49  
Section 6 of the Code of Judicial Procedure was a remedy which the  
applicant was required to exhaust in order to comply with the  
conditions in Article 26 (Art. 26) of the Convention.

It follows that the applicant's complaint in this respect must be  
rejected under Article 27 para. 3 (Art. 27-3) of the Convention for  
failure to exhaust domestic remedies.

3. The applicant also complains of a breach of Article 6 (Art. 6)  
of the Convention in that allegedly the Water Court judge, at the  
preliminary hearing which preceded the judgment of 8 March 1978, acted  
as a special authority distinct from the Court.  She also submits that  
there was inequality between the parties since the Royal Water Power  
Board was a state organ with resources exceeding those of the  
applicant.

The Commission finds no appearance of a violation of Article 6  
(Art. 6) of the Convention in these respects.  It follows that these  
complaints are manifestly ill-founded within the meaning of  
Article 27 para. 2 (Art. 27-2) of the Convention.

4. The applicant complains that the compensation awarded was  
inadequate inter alia as she did not receive full compensation for  
increased costs for the timber business.  She alleges a violation of  
Article 1 of Protocol No. 1 (P1-1).  The applicant also alleges that  
since the compensation did not cover certain future work there has  
been a breach of Article 4 (Art. 4) of the Convention according to  
which no one shall be required to perform forced or compulsory labour.

The Commission, after having examined the applicant's submissions,  
finds that the applicant has not substantiated that having regard to  
the compensation paid there was a real and substantial disproportion  
between the burden imposed on the applicant and the public interest  
pursued in the construction and running of the power station (cf.  
Lithgow and Others, Comm. Report 7.3.84, para. 376).  Accordingly no  
issue arises under Article 1 of Protocol No. 1. The Commission  
moreover considers that the facts of the case do not raise any issue  
under Article 4 (Art. 4) of the Convention.

It follows that in this respect the application is manifestly  
ill-founded within the meaning of Article 27 para. 2 (Art. 27-2) of  
the Convention.

5. The applicant also complains that she acquired a right from  
the judgment of 10 April 1953 as a result of the obligation imposed on  
the Royal Water Power Board to let a sufficient amount of water  
through to permit log-floating.  This right ceased in 1958 when the  
Board entered into agreements with the foresters that the logs be  
transported in other ways.  The applicant maintains that she has  
thereby been deprived of a right in violation of  
Article 1 of Protocol No. 1 (P1-1).

The Commission considers that it need not examine the substance of  
this particular complaint.  Article 26 (Art. 26) of the Convention  
prescribes that the Commission may only deal with a matter after all  
domestic remedies have been exhausted and within a period of six  
months from the date on which the final decision was taken.

The Commission recalls that the alleged deprivation of a right took  
place in 1958.  Insofar as legal remedies existed against this  
deprivation, the applicant has not shown that she exhausted them.  If  
there was no effective remedy, it appears that the six months rule has  
not been respected.

It follows that the applicant has not satisfied the conditions of  
Article 26 of the Convention and her complaint in this respect must  
therefore be rejected pursuant to Article 27 para. 3 (Art. 27-3) of  
the Convention.

6. The applicant also alleges a violation of Article 13 (Art. 13)  
of the Convention which reads:

"Everyone whose rights and freedoms as set forth in this Convention  
are violated shall have an effective remedy before a national  
authority notwithstanding that the violation has been committed by  
persons acting in an official capacity."

The applicant claims that she has had no effective remedy available to  
her and she argues that it follows from Articles 13 and 26 (Art. 13,  
art. 26) of the Convention that the organs of the Contracting States  
have to apply directly the provisions of the Convention.

It is established case-law that neither Article 13 (Art. 13) nor the  
Convention in general lays down any given manner for ensuring within  
their internal law the effective implementation of the provisions of  
the Convention (see Eur.  Court H.R., Swedish Engine Drivers' Union  
judgment of 6 February 1976, Series A no. 20, p. 18, para. 56).

In the present case, the applicant had the possibility of submitting  
all her complaints against the Water Court to the Water Court of  
Appeal and a further appeal was open to the Supreme Court. Moreover,  
in relation to the complaint under Article 6 (Art. 6) of the  
Convention that the proceedings were unreasonably lengthy, the  
applicant had a separate way of appealing as the Commission has found  
under para. 2. The Commission considers that these remedies provided  
the applicant with an "effective remedy" within the meaning of  
Article 13 (Art. 13) of the Convention.

It follows that, in this respect, the application is manifestly  
ill-founded within the meaning of Article 27 para. 2 (Art. 27-2) of  
the Convention.

7.    The applicant finally invokes Articles 17 and 18 (Art. 17,  
art. 18) of the Convention.  However, in view of its considerations  
above, the Commission finds no separate issue under Article 17 or 18  
(Art. 17, art. 18).

## For these reasons, the Commission

## DECLARES THE APPLICATION INADMISSIBLE

Secretary to the Commission         President of the Commission