# Europadomstolens dom den 28 juni 1990 i målet MATS JACOBSSON mot Sverige (nr 11309/84)

- Rubrik i HUDOC: CASE OF MATS JACOBSSON v. SWEDEN
- Slag: Dom · språk: engelska · datum: 1990-06-28
- Ansökningsnummer: 11309/84
- ECLI: ECLI:CE:ECHR:1990:0628JUD001130984
- Artiklar (HUDOC): 6, 6-1, 13, P1-1, 41
- Slutsats (HUDOC): Violation of Art. 6-1;Not necessary to examine Art. 13;Non-pecuniary damage - financial award;Pecuniary damage - claim dismissed;Costs and expenses award - Convention proceedings
- Källa: Europadomstolen (HUDOC), © ECHR-CEDH: https://hudoc.echr.coe.int/eng?i=001-57632
- Ratio Lex: https://ratiolex.se/internationell-ratt/europadomstolen/001-57632/

Elektronisk version. Den undertecknade texten i domstolens arkiv är den autentiska (art. 44.3 EKMR).

In the Mats Jacobsson case*,

_______________  
*  Note by the Registrar: This case is numbered 11/1989/171/227.  The  
first number is the case's position on the list of cases referred to  
the Court in the relevant year (second number).  The last two numbers  
indicate the case's position on the list of cases referred to the  
Court since its creation and on the list of the corresponding  
originating applications to the Commission.  
_______________

The European Court of Human Rights, sitting, in accordance with  
Article 43 (art. 43) of the Convention for the Protection of Human  
Rights and Fundamental Freedoms ("the Convention") and the relevant  
provisions of the Rules of Court*, as a Chamber composed of the  
following judges:

_______________  
*  Note by the Registrar: The amendments to the Rules of Court which  
entered into force on 1 April 1989 are applicable to this case.  
_______________

Mr  R. Ryssdal, President,  
Mrs D. Bindschedler-Robert,  
Mr  B. Walsh,  
Mr  J. De Meyer,  
Mr  N. Valticos,  
Mrs E. Palm,  
Mr  I. Foighel,

and also of Mr M.-A. Eissen, Registrar, and Mr H. Petzold, Deputy  
Registrar,

Having deliberated in private on 22 February and on 21 May 1990,

Delivers the following judgment, which was adopted on the  
last-mentioned date:

## PROCEDURE

**1.** The case was referred to the Court on 12 April 1989 by the  
European Commission of Human Rights ("the Commission") and on  
23 May 1989 by the Government of the Kingdom of Sweden ("the  
Government"), within the three-month period laid down in  
Article 32 § 1 and Article 47 (art. 32-1, art. 47) of the Convention.  
It originated in an application (no. 11309/84) against Sweden lodged  
with the Commission under Article 25 (art. 25) by Mr Mats Jacobsson,  
a Swedish citizen, on 5 August 1984.

The Commission's request referred to Articles 44 and 48  
(art. 44, art. 48) of the Convention and to the declaration whereby  
Sweden recognised the compulsory jurisdiction of the Court  
(Article 46) (art. 46).  The purpose of the request and of the  
Government's application was to obtain a decision as to whether the  
facts of the case disclosed a breach by the respondent State of its  
obligations under Articles 6 and 13 (art. 6, art. 13) of the Convention.

**2.** In response to the enquiry made in accordance with  
Rule 33 § 3 (d) of the Rules of Court, the applicant stated that he  
wished to take part in the proceedings and designated the lawyer who  
would represent him (Rule 30).

**3.** The Chamber to be constituted included ex officio Mrs E. Palm,  
the elected judge of Swedish nationality (Article 43 of the  
Convention) (art. 43), and Mr R. Ryssdal, the President of the Court  
(Rule 21 § 3 (b)).  On 29 April 1989, in the presence of the  
Registrar, the President drew by lot the names of the other five  
members, namely Mrs D. Bindschedler-Robert, Mr B. Walsh,  
Mr J. De Meyer, Mr N. Valticos and Mr I. Foighel (Article 43 in fine  
of the Convention and Rule 21 § 4) (art. 43).

**4.** Mr Ryssdal assumed the office of President of the Chamber  
(Rule 21 § 5) and, through the Registrar, consulted the Agent of the  
Government, the Delegate of the Commission and the representative of  
the applicant on the need for a written procedure (Rule 37 § 1).  In  
accordance with his order, the Government's memorial and the  
applicant's memorial were received by the registry, on 1 and  
11 December 1989, respectively.  On 16 January 1990 the Secretary to  
the Commission notified the Registrar that the Delegate would submit  
her observations at the hearing.

**5.** Having consulted, through the Registrar, those who would be  
appearing before the Court, the President directed on 26 January 1990  
that the oral proceedings should open on 20 February 1990 (Rule 38).

**6.** The hearing took place in public in the Human Rights Building,  
Strasbourg, on the appointed day.  The Court had held a preparatory  
meeting beforehand.

There appeared before the Court:

(a)  for the Government

Mr H. Corell, Ambassador, Under-Secretary  
for Legal and Consular Affairs, Ministry of  
Foreign Affairs,                                  Agent,

Mr S. Tell, District Court Judge, former Legal  
Adviser to the Ministry of Housing and Planning,

Mr H. Lagergren, Legal Adviser, Ministry of Housing  
and Planning,

Mr P. Boqvist, Legal Adviser, Ministry of Foreign  
Affairs,                                          Advisers;

(b)  for the Commission

Mrs G. Thune,                                           Delegate;

(c)  for the applicant

Mr H. W. Tullberg, lawyer,                              Counsel,  
Mr U. Brunfelter, lawyer,                               Adviser.

The Court heard addresses by Mr Corell for the Government, by  
Mrs Thune for the Commission and by Mr Tullberg for the applicant, as  
well as their replies to its questions.  On the day of the hearing,  
counsel for the applicant lodged, with the President's authorisation,  
a number of documents (Rule 37 § 1, second sub-paragraph).

## AS TO THE FACTS

I.      Circumstances of the case

**7.** Mr Mats Jacobsson owns a property, Tullinge 17:289 (previously  
stadsäga, "Stg", 3594), situated in the municipality of Botkyrka, a  
suburb south of Stockholm.  On the property, which has an area of  
2,079 m2, there is a small house.

**8.** When the applicant acquired the property in 1973, it was  
subject to a building plan dating from 1938 ("the 1938 plan") which  
provided that, in principle, no building plot should be less than  
1,500 m² in area; as an exception a plot of at least 1,000 m² could be  
permitted in a locality where adequate sewage and water-supply systems  
had been installed.

**9.** Since June 1954 the property has for most of the time been  
subject to a series of temporary building prohibitions, lasting one or  
two years each, issued under section 109 of the Building Act 1947  
(byggnadslagen 1947:385 - "the 1947 Act"; see paragraph 23 below)  
pending an amendment of the building plan in force.  Since the same  
date construction has also been prohibited in the area under  
section 110 of the 1947 Act (see paragraph 24 below), pending the  
building of adequate roads and the installation of water-supply and  
sewage systems.

**10.** After the applicant, amongst others, had complained about the  
inconveniences resulting from the existing sewage system in the area  
where his property is situated, the County Administrative Board  
(länsstyrelsen - "the Board") ordered in June 1981 that the  
municipality should install sewage pipes there before the end of 1982,  
which it did.

**11.** On 16 December 1982 the Municipal Council (kommunfullmäktige)  
adopted a proposal to amend the 1938 plan, notably so as to provide  
that in future all building plots would have to have an area of at  
least 1,500 m2, irrespective of whether or not water-supply and sewage  
systems had been installed.  The proposal also sought to prohibit all  
constructions on the site of the applicant's existing house.

**12.** Mr Mats Jacobsson objected to the proposal.  He alleged that  
the amendments would unlawfully restrict construction and would  
wrongfully take away the right to build a second house that previously  
attached to properties such as his own under the 1938 plan.

However, the amended building plan was approved by the Board on  
4 July 1983 pursuant to section 108 of the 1947 Act (see paragraph 21  
below).  In its decision the Board found, inter alia, that the  
Municipality's policy of allowing only a low degree of exploitation  
was acceptable and could not be considered to contravene the 1947 Act.

As regards the right to build the Board observed:

"Stg 3594 has an area of 2,079 m2.  The existing plan of 1938  
provides for building plots of at least 1,500 m2.  However, if the  
property is situated in an area where water and sewage pipes are  
installed before or in connection with the construction and in  
accordance with a plan approved by the Health Care Board  
(hälsovårdsnämnden), it is permitted to reduce the area of the  
building plots, but not to less than 1,000 m2.  This condition must  
presuppose some sort of private initiative for a common  
installation for several properties in order to build on them.  
Since 1954, when the building prohibition under section 110 of the  
Building Act was issued, no measures have been taken by the  
property owners with a view to arranging any water or sewage  
installations.  The water and sewage pipes which have now been  
installed became necessary only in order to remedy the sanitary  
inconveniences which had arisen in the area despite the fact that  
the building plots are large.  The conditions in the plan, subject  
to which building plots of less than 1,500 m2 may be permitted,  
cannot therefore be considered to be fulfilled.  The County  
Administrative Board accordingly finds that there is no obvious  
right under the plan in force to divide Stg 3594.  In view of this  
and having regard to the general interest of not prejudging future  
town planning, the County Administrative Board considers that the  
decision of the municipality not to agree to Mr Jacobsson's claim  
for further building rights is acceptable."

**13.** The applicant's appeal to the Government against the Board's  
decision was rejected on 19 January 1984 on all counts but one.  The  
Government accepted only that demolition of the applicant's existing  
house should no longer be a condition for allowing any further  
construction on his property (see paragraph 11 above).

**14.** The applicant applied to the Supreme Administrative Court  
(regeringsrätten) for the reopening of proceedings, submitting that  
the Government's decision was based on false premises and that the  
proposed plan was contrary to the law.  In a decision of 5 June 1984  
the Supreme Administrative Court rejected the application.

II.     Relevant domestic law and practice

A.  Legislation on construction and urban planning

**15.** Until 30 June 1987 a property owner's right to build on his  
own land was governed by the 1947 Act and by a Government Ordinance  
adopted in 1959 in pursuance of that Act (byggnadsstadgan - "the 1959  
Ordinance").  On 1 July 1987 the Plan and Building Act 1987 (plan- och  
bygglagen) replaced the 1947 Act.  However, the new Act is not  
relevant in the present case.

**16.** Section 1 of the 1947 Act provided that construction on  
property required a building permit under conditions to be laid down  
by the Government.  Section 54 of the 1959 Ordinance specified that a  
permit was required for all new constructions, except for certain  
buildings for public use, or small additions to existing residences  
and farms.

**17.** The examination of an application for a building permit  
involved ascertaining that the proposed building did not contravene  
any plan in force (or, where applicable, the regulations for  
non-planned areas) or a building prohibition, and that it satisfied  
the relevant technical requirements.  If there were no such obstacles,  
a permit had to be granted.

**18.** Before a building could be erected on a property, section 5 of  
the 1947 Act called for an examination of whether the property was  
suitable from a general point of view for this purpose.  Such an  
examination was in general to be effected by planning procedure.

B.  Building plans

**19.** The 1947 Act prescribed that the detailed regulations on the  
development of land were to be contained in either town plans  
(stadsplaner) or building plans (byggnadsplaner).

**20.** A building plan had to state the limits of areas intended for  
different purposes (section 107 of the 1947 Act).  Any special  
regulations relating to the development or the use of the areas  
concerned, such as a ban on the development of a certain part of the  
land, had to be incorporated in the plan.

**21.** According to section 108 of the 1947 Act, building plans (and  
also changes to such plans - see section 23 of the 1959 Ordinance) had  
to be adopted by the Municipal Council and thereafter approved by the  
County Administrative Board before they acquired legal force.  Under  
section 150 of the Act, a landowner who was adversely affected by the  
Board's decision to approve a plan could appeal to the Government as  
the first and final instance.

**22.** The 1947 Act did not contain any provisions concerning the  
material conditions for changing or approving a building plan.  
However, when considering whether an owner's right to build according  
to an existing plan might be limited or withdrawn by a change of that  
plan, the authorities concerned had to weigh the public interest in  
such a change against the infringement of the private interests  
involved (section 4 of the 1947 Act and section 9 of the 1959  
Ordinance).

C.  Building prohibitions

**23.** If the question of drawing up or altering a building plan had  
been raised, the Board could, under section 109 of the Act and at the  
request of the municipality, prohibit new constructions in the area.  
Such a prohibition could be issued for a maximum of one year but could  
be extended by the Board for not more than two years at a time.

**24.** Section 110, paragraph 1, of the 1947 Act prohibited any new  
construction that was not in conformity with a building plan.  Under  
paragraph 2, the Board was empowered to proscribe all new  
constructions in an area covered by such a plan before adequate roads  
had been built and water-supply and sewage systems installed.

**25.** Exemptions from the above-mentioned building prohibitions  
could be granted by the Board in individual cases.  However if it was  
sought to depart from a building plan, an exemption therefrom could  
not be granted by the Board without the approval of the Building  
Committee (byggnadsnämnden) of the municipality (section 110  
of the 1947 Act).  The Building Committee could itself grant the  
exemption at first instance if the Government had delegated such  
competence to it.

If an exemption from a building prohibition was refused, an appeal lay  
to the Government as the first and final instance.  However, a  
building committee's refusal to approve a departure from the building  
plan was not subject to appeal (section 71 of the 1959 Ordinance).

## PROCEEDINGS BEFORE THE COMMISSION

**26.** Mr Mats Jacobsson lodged his application with the Commission  
on 5 August 1984 (no. 11309/84).  He alleged violations of  
Article 6 § 1 and Article 13 (art. 6-1, art. 13) of the Convention, in  
that his rights under the 1938 building plan could not be examined by  
any court.  He also complained of a breach of Article 1 of  
Protocol No. 1 (P1-1) on the ground that his right to use his property  
according to the 1938 building plan had been revoked without any  
general interest having been established.

**27.** On 8 October 1985 the Commission declared the application  
inadmissible.  However, on 8 March 1988 it concluded, after having  
reopened the proceedings, that the complaints were admissible except  
for those under Article 1 of Protocol No. 1 (P1-1).

In its report adopted on 16 March 1989 (Article 31 of the Convention)  
(art. 31), the Commission expressed the opinion that there had been a  
violation of Article 6 § 1 (art. 6-1) (by fourteen votes to three) and  
that it was not necessary to examine separately the complaint under  
Article 13 (art. 13) (unanimously).  The full text of the Commission's  
opinion and the dissenting opinions contained in the report is  
reproduced as an annex to this judgment.*

_______________  
* Note by the Registrar.  For practical reasons this annex will appear  
only with the printed version of the judgment (volume 180-A of Series A of  
the Publications of the Court), but a copy of the Commission's report is  
obtainable from the registry.  
_______________

## AS TO THE LAW

### I.      ALLEGED VIOLATION OF ARTICLE 6 § 1 (art. 6-1) OF THE CONVENTION

**28.** The applicant complained that Swedish law did not provide him  
with adequate access to a court to challenge the decision to amend the  
1938 building plan covering his property.  He invoked Article 6 § 1  
(art. 6-1) of the Convention according to which

"In the determination of his civil rights and obligations ... everyone  
is entitled to a ... hearing by [a] ... tribunal ...".

The Commission agreed with this contention.

A.  Applicability of Article 6 § 1 (art. 6-1)

**29.** The Government, for their part, pleaded that Article 6 § 1  
(art. 6-1) was not applicable in this case.

1.  Existence of a dispute ("contestation") over a "right"

**30.** In order to decide this question, the Court has first to  
ascertain whether there was a dispute ("contestation") over a "right"  
which can be said, at least on arguable grounds, to be recognised  
under domestic law.  According to the principles enunciated in its  
case-law (see, inter alia, the Pudas judgment of 27 October 1987,  
Series A no. 125-A, p. 14, § 31), the dispute must be genuine and  
serious; it may relate not only to the actual existence of a right but  
also to its scope and the manner of its exercise; and, finally, the  
result of the proceedings must be directly decisive for the right in  
question.

**31.** The Government contended that the normative or general  
character of the amendment to the plan was so strong that no right on  
the part of the applicant could be said to have been at issue.

Admittedly, the Court has held in its James and Others judgment  
(21 February 1986, Series A no. 98), on which the Government relied,  
that Article 6 § 1 (art. 6-1) does not in itself guarantee any  
particular content for (civil) "rights and obligations" in the  
substantive law of the Contracting States (p. 46, § 81).  In that case  
no dispute could therefore have been said to exist regarding the  
existence of the right claimed by the applicants, as parliamentary  
legislation had unequivocally taken it away.  However, in the present  
instance the rights asserted by the applicant were recognised by  
national law, though their exercise was subjected to a number of  
conditions in the 1947 Act, many of which the administration had  
received authority to fix, in some cases by decisions of general  
applicability (see paragraphs 15-25 above).  Accordingly, a dispute  
within the meaning of Article 6 (art. 6) regarding the continued  
existence of these rights might well arise if such decisions were  
alleged to be in contravention of the law.

**32.** The Government also maintained that, in view of the wide  
discretion left by the Swedish Parliament to the administrative  
authorities in this area, there could not be any serious and genuine  
dispute as to the applicant's rights to build and divide his property  
before a building permit had been issued.  They added that, as the  
rights claimed had in fact never been exercised, they were not  
relevant for the purposes of Article 6 § 1 (art. 6-1).

In the circumstances the Court finds it clear, however, that, subject  
to meeting the requirements laid down by law (in particular by the  
1947 Act and the enactments made thereunder - see paragraphs 16-25  
above), Mr Mats Jacobsson could arguably have asserted that, by virtue  
of the provisions of the 1938 plan, he had inter alia a right to build  
a second house on his property and to obtain the necessary permit.  It  
is true that the decision to adopt the amendment to the plan involved  
the exercise of a certain discretion on the part of the competent  
authorities, but their discretion was not unfettered: they were bound  
by generally recognised legal and administrative principles (see, for  
example, the Allan Jacobsson judgment of 25 October 1989, Series A  
no. 163, p. 20, § 69).

In view of this, it is not material that Mr Mats Jacobsson had not in  
fact, as stressed by the Government, exercised his disputed rights  
under the plan, for example by building a second house on his  
property.

The dispute which arose between Mr Jacobsson and the authorities  
concerned the lawfulness of the amendments to the plan.  In  
particular, the authorities were alleged to have departed from a  
long-established practice, resulting from section 4 of the 1947 Act  
(see paragraph 22 above), whereby, the applicant claimed, new plans  
were approved only if they conferred a right to compensation for  
losses of more than 20% of existing building rights; in addition, it  
appears that Mr Mats Jacobsson raised the question of lawfulness  
before the Supreme Administrative Court also, when he applied for the  
reopening of the proceedings (see paragraph 14 above).

The Government sought to infer from, inter alia, the rejection of that  
application that Mr Mats Jacobsson's complaints were not arguable.  The  
Supreme Administrative Court's judgment is, however, not decisive for  
this question: the possibility of seeking the reopening of proceedings  
is too circumscribed under Swedish law to provide adequate access to a  
court for the purposes of Article 6 § 1 (art. 6-1) (see, for example,  
the above-mentioned Pudas judgment, Series A no. 125-A, p. 17, § 41)  
and, thus, the Supreme Administrative Court may well have been obliged  
to dismiss the applicant's complaint even though it challenged the  
lawfulness of the decision to amend the plan.

Having regard to the foregoing and to the facts of the case, the Court  
finds that the above-mentioned dispute between the applicant and the  
authorities was of a genuine and serious nature.

**33.** The Government further contended that the dispute did not  
concern any proceedings whose outcome was decisive for the rights  
claimed by the applicant to build a second house and to divide his  
property: the amendments to the plan were only one of several factors  
which had a bearing on the possibilities which he had of exercising  
these rights and, in addition, the purpose of the amendments was not  
to affect his rights specifically but to regulate the situation of a  
great number of property owners.

The Court finds, however, that the decision to amend the plan was  
capable of extinguishing the alleged rights.  Thus, whatever other  
conditions the applicant may have had to comply with, the amendments  
put in issue the very existence of these rights.  The mere fact that  
other property owners may also have been affected is of no consequence  
in this respect (see the above-mentioned Allan Jacobsson judgment,  
Series A no. 163, p. 20, § 70).  There was also a sufficient  
connection, for the purposes of Article 6 § 1 (art. 6-1), between the  
dispute and the applicant's rights, since it concerned the validity of  
the amendments as they applied to his property.

There was accordingly a "determination" of the applicant's "rights".

2.  The "civil" character of the "right" in issue

**34.** There can be no doubt that the applicant's disputed "rights"  
to build on and to divide his property were "civil rights" within the  
meaning of Article 6 § 1 (art. 6-1); this is confirmed by the Court's  
established case-law (see, as the most recent authority, the  
Allan Jacobsson judgment cited above, Series A no. 163, pp. 20-21,  
§§ 72-73).  In the present case this finding is affected neither by  
the Government's argument that the planning decision itself was  
motivated mainly by considerations of public interest, nor by the  
general character of the plan.

3.  Conclusion

**35.** In sum, Article 6 § 1 (art. 6-1) is applicable.

B.  Compliance with Article 6 § 1 (art. 6-1)

**36.** According to Swedish law, the dispute in question could be  
determined only by the Government as the final instance (see  
paragraph 21 above).  The Government's decisions were not, in  
principle, open to review as to their lawfulness by either the  
ordinary courts or the administrative courts, or by any other body  
which could be considered to be a "tribunal" for the purposes of  
Article 6 § 1 (art. 6-1).

As shown by the present case, the applicant could challenge the  
decision to amend the plan by requesting the Supreme Administrative  
Court to reopen the proceedings.  However, for the reasons set out in  
the Sporrong and Lönnroth judgment of 23 September 1982 (Series A  
no. 52, p. 31, § 86), this extraordinary remedy does not meet the  
requirements of Article 6 § 1 (art. 6-1) (see also paragraph 32 above).

**37.** There has thus been a violation of Article 6 § 1 (art. 6-1).

### II.     ALLEGED VIOLATION OF ARTICLE 13 (art. 13) OF THE CONVENTION

**38.** The applicant claimed that he was deprived of any "effective  
remedy before a national authority" in respect of the matters of which  
he complained.

Having regard to its decision on Article 6 § 1 (art. 6-1), the Court,  
like the Commission, does not find it necessary to consider the case  
also under Article 13 (art. 13); this is because its requirements are  
less strict than, and are here absorbed by, those of Article 6 § 1  
(art. 6-1) (see, for example, the above-mentioned Allan Jacobsson  
judgment, Series A no. 163, p. 21, § 76).

III.    ALLEGED VIOLATION OF ARTICLE 1 OF PROTOCOL NO. 1 TO THE  
CONVENTION (P1-1)

**39.** In his memorial to the Court, the applicant also maintained that  
the decision to change the plan breached Article 1 of Protocol No. 1  
(P1-1).  At the hearing he reiterated this contention, relying on the  
lack of any compensation for the loss of building rights which he  
alleged had ensued.

**40.** This is a separate complaint since it is not based on the same  
facts as those underlying the grievance under Article 6 § 1 (art. 6-1)  
of the Convention, namely the lack of adequate access to a court to  
challenge the lawfulness of the decision in question.  It was declared  
inadmissible by the Commission as being manifestly ill-founded (see  
paragraph 27 above).  Consequently, the Court has no jurisdiction to  
deal with the matter (see, as the most recent authority, the Powell  
and Rayner judgment of 21 February 1990, Series A no. 172, pp. 13-14,  
§§ 28-29).

### IV.     APPLICATION OF ARTICLE 50 (art. 50) OF THE CONVENTION

**41.** Article 50 (art. 50) provides:

"If the Court finds that a decision or a measure taken by a legal  
authority or any other authority of a High Contracting Party is  
completely or partially in conflict with the obligations arising  
from the (...) Convention, and if the internal law of the said  
Party allows only partial reparation to be made for the  
consequences of this decision or measure, the decision of the Court  
shall, if necessary, afford just satisfaction to the injured  
party."

The applicant sought compensation for pecuniary and non-pecuniary  
damage and reimbursement of his costs and expenses.

A.  Pecuniary damage

**42.** The applicant asked primarily that the Government should be  
compelled to buy his estate at its market value calculated on the  
basis that the 1938 plan was still in force.  At 1990 prices this gave  
a market value of 1,400,000 Swedish crowns.  Alternatively, if the  
Court were to find that such a transaction could not be ordered by way  
of just satisfaction, the applicant claimed compensation for the loss  
in value of the property occasioned by the amended plan.  This loss  
was estimated at 1,000,000 crowns.  In any event, he sought  
compensation for the loss he had suffered as a result of the building  
prohibitions imposed on the property between 1974 and 1984.  At 1990  
prices this was calculated at 400,000 crowns.  The applicant  
maintained that all sums should be paid free of local tax or other  
contributions in Sweden.

**43.** The decision to amend the plan certainly had negative effects  
upon the applicant's possibilities of using and developing his  
property.  Nevertheless, the Court cannot speculate as to what the  
result of the applicant's challenge would have been if he had been  
able to bring his complaints before a "tribunal" having the  
supervisory powers required by Article 6 § 1 (art. 6-1).

The Court thus agrees with the Government's contention that no causal  
link is established between the violation of Article 6 § 1 (art. 6-1)  
found in this judgment and any of the alleged pecuniary damage.

No award can therefore be made under this head.

B.  Non-pecuniary damage

**44.** The applicant also sought at least 10,000 crowns as  
compensation for non-pecuniary damage.  This claim was supported by  
the Delegate of the Commission.  The Government left the matter to the  
Court's discretion.

The Court agrees with the Delegate that, by reason of the absence of  
an adequate court remedy, the applicant suffered some non-pecuniary  
damage which would not be redressed merely by a finding of a  
violation.  Deciding on an equitable basis, the Court awards  
10,000 crowns as just satisfaction under this head.

C.  Costs and expenses

**45.** The applicant sought 393,874 crowns in respect of costs and  
expenses.  Of this sum, 150,960 crowns constituted Mr Tullberg's fees  
for 251 hours of work and 239,888 crowns his expenses for outside  
legal advice, for the translation of various documents and for travel.  
The remaining 3,026 crowns related to a number of miscellaneous items.

**46.** The Court notes that a large part of the costs and expenses in  
question were incurred in respect of the complaint under Article 1 of  
Protocol No. 1 (P1-1), which complaint was declared inadmissible by the  
Commission.  Considering this and other relevant circumstances,  
including the legal aid payments from the Council of Europe, and  
making an assessment on an equitable basis, as is required by  
Article 50 (art. 50) of the Convention, the Court considers that the  
applicant is entitled to be reimbursed the sum of 80,000 crowns.

## FOR THESE REASONS, THE COURT UNANIMOUSLY

1.      Holds that there has been a violation of Article 6 § 1  
(art. 6-1) of the Convention;

2.      Holds that it is not necessary to examine the case under  
Article 13 (art. 13);

3.      Holds that it does not have jurisdiction to examine the  
applicant's complaint under Article 1 of Protocol No. 1 (P1-1);

4.      Holds that Sweden is to pay the applicant 10,000  
(ten thousand) Swedish crowns for non-pecuniary damage and 80,000  
(eighty thousand) crowns for costs and expenses;

5.      Rejects the remainder of the claim for just satisfaction.

Done in English and in French, and delivered at a public hearing in  
the Human Rights Building, Strasbourg on 28 June 1990.

Signed: Rolv RYSSDAL  
President

Signed: Marc-André EISSEN  
Registrar

In accordance with Article 51 § 2 (art. 51-2) of the Convention and  
Rule 53 § 2 of the Rules of Court, a separate opinion of Mr De Meyer  
is annexed to this judgment.

Initialled: R.R.

Initialled: M.-A.E.

## SEPARATE OPINION OF JUDGE DE MEYER

Here again, as in the previously decided case of Allan Jacobsson, an  
issue was raised concerning the determination of a person's rights of  
property, as affected by planning and construction legislation and by  
the implementation thereof.  That sufficed, in my view, to render  
Article 6 § 1 (art. 6-1) of the Convention applicable (1).

_______________  
(1) See further my concurring opinion in the Allan Jacobsson case,  
Series A no. 163, p. 24.  
_______________

I also feel that the Court was not precluded from considering the  
applicant's contention under Article 1 of the First Protocol (P1-1).  
I still believe that, once a case is brought before it, the Court's  
jurisdiction extends to all questions of fact and of law arising in  
that case (2).

_______________  
(2) See the judgment in the cases of De Wilde, Ooms and Versyp,  
18 June 1971, Series A no. 12, p. 29, §§ 47-49, and the Handyside  
judgment, 7 December 1976, Series A no. 24, p. 20, § 41.  See further  
my separate opinions in the cases of W. v. the United Kingdom,  
Series A no. 121-A, p. 42, and of Boyle and Rice, Series A no. 131,  
p. 35, at II.  
_______________

