Sök i Ratio Lex

EU-rätt · Förordning · CELEX 32016R1075

Artikel 48 i förordning (EU) 2016/1075

Underrättelse av bedömningen att ett institut uppfyller de villkor för resolution som anges i artikel 32.1 a och b i direktiv 2014/59/EU

Ur Commission Delegated Regulation (EU) 2016/1075 of 23 March 2016 supplementing Directive 2014/59/EU of the European Parliament and of the Council with regard to regulatory technical standards specifying the content of recovery plans, resolution plans and group resolution plans, the minimum criteria that the competent authority is to assess as regards recovery plans and group recovery plans, the conditions for group financial support, the requirements for independent valuers, the contractual recognition of write-down and conversion powers, the procedures and contents of notification requirements and of notice of suspension and the operational functioning of the resolution colleges (Text with EEA relevance).

EU-rätten

Artikelns text

1. Underrättelse av en behörig myndighet eller resolutionsmyndighet i den mening som avses i artikel 81.3 i direktiv 2014/59/EU ska inbegripa följande:

a) Namnet på det institut eller den enhet som avses i artikel 1.1 b, c eller d i direktiv 2014/59/EU som underrättelse gäller.

b) De uppgifter som avses i artikel 46.1 a och b.

c) En sammanfattning av den bedömning som krävs enligt artikel 32.1 a och b i direktiv 2014/59/EU.

2. Underrättelsen ska lämnas utan dröjsmål efter en kontroll av att de villkor som avses i artikel 32.1 a och b i direktiv 2014/59/EU är uppfyllda.

3. Den behöriga myndigheten ska utan dröjsmål förse resolutionsmyndigheten med all ytterligare information som resolutionsmyndigheten kan komma att begära för att kunna slutföra sin bedömning.

Artikeln i rättsakten